Council planning record

Use of basement floor as a flat (Class C3), alteration to shopfront and installation of door and window at lower ground floor level at front elevation, creation of lightwell with stairs and railings to front elevation and infill extension at rear basement level.

178 Shirland Road London W9 3JE

PendingReference: 26/01363/FULLCity of Westminster

Last published check: 28 Sept 2026, 08:43. Check the council record for more recent changes.

Application location

178 Shirland Road London W9 3JE

This record has no verified map location.

View council map

Application summary

Status
Pending
Application type
Full Planning Permission Application
Received
3 Mar 2026
Validated
9 Jun 2026
Determination deadline
Not published
Local authority
City of Westminster

Application overview

Use of basement floor as a flat (Class C3), alteration to shopfront and installation of door and window at lower ground floor level at front elevation, creation of lightwell with stairs and railings to front elevation and infill extension at rear basement level.

Proposal details

Reference
26/01363/FULL
Alternative references
PP-14748006
Ward
Harrow Road
Agent
Lusher Architects

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 34 of 34

DocumentPublishedAction
ACK-GENERAL LETTER (G/P/C)Background Papers · PDF15 Jun 2026View
ECNSLT-INTERNAL CONSULTSBackground Papers · PDF15 Jun 2026View
ECNSLT-INTERNAL CONSULTSBackground Papers · PDF15 Jun 2026View
CNSLT-LA SOCIETYBackground Papers · PDF15 Jun 2026View
SITE NOTICE 21 OR 28 DAYS IF T&C APPL.Background Papers · PDF15 Jun 2026View
NEIGHBOUR NOTIFICATION LETTER (21D)Background Papers · PDF15 Jun 2026View
LETTER TO CONFIRM CONTRIBUTIONBackground Papers · PDF9 Jun 2026View
3RD INVALID LETTERBackground Papers · PDF3 Jun 2026View
PROPOSED FRONT/REAR ELEVATIONDrawing · PDF27 May 2026View
DETAIL FRONT ELEVATIONDrawing · PDF27 May 2026View
INTERNAL DAYLIGHT ASSESSMENTOther · PDF27 May 2026View
PLANNING - DESIGN & ACCESS STATEMENTOther · PDF27 May 2026View
PRELIMINARY FLOOD RISK ASSESSMENT (RESIDENTIAL)Flood risk assessment · PDF27 May 2026View
SUSTAINABLE DESIGN STATEMENTOther · PDF27 May 2026View
PROPOSED FLOOR PLANSDrawing · PDF27 May 2026View
2ND INVALID LETTERBackground Papers · PDF1 May 2026View
2ND INVALID LETTERBackground Papers · PDF21 Apr 2026View
FLOOD RISK ASSESSMENTSuperseded document · PDF21 Apr 2026View
ENERGY STATEMENTBackground Papers · PDF21 Apr 2026View
1ST INVALID LETTERBackground Papers · PDF5 Mar 2026View
APPLICATION FORM REDACTEDApplication Form · PDF3 Mar 2026View
ATTACHMENT SUMMARYBackground Papers · PDF3 Mar 2026View
LOCATION PLANLocation Plan · PDF3 Mar 2026View
EXISTING BLOCK PLANDrawing · PDF3 Mar 2026View
EXISTING FLOOR PLANSDrawing · PDF3 Mar 2026View
EXISTING FRONT AND REAR ELEVATIONSDrawing · PDF3 Mar 2026View
SUPPORTING DOCUMENTSuperseded document · PDF3 Mar 2026View
EXISTING SIDE ELEVATIONDrawing · PDF3 Mar 2026View
PROPOSED BLOCK PLANDrawing · PDF3 Mar 2026View
PROPOSED FLOOR PLANSSuperseded document · PDF3 Mar 2026View
PROPOSED FRONT AND REAR ELEVATIONSSuperseded document · PDF3 Mar 2026View
SUPPORTING DOCUMENTSuperseded document · PDF3 Mar 2026View
PROPOSED SIDE ELEVATIONDrawing · PDF3 Mar 2026View
DETAIL FRONT ELEVATIONSuperseded document · PDF3 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Target Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.