England · Local authority

London Corporation planning applications

PlanningTrack collects planning applications and decisions from the public planning register of City of London Corporation. Search an address, application reference or proposal. Official London Corporation website

Collected application statistics

Collected records · All available dates
27,112Searchable applications
644Recorded as pending
98%Approval rate · 24,566 approved or refused records
394Refused applications

24,172 approved · 394 refused · 1,442 withdrawn. Received dates in our records: 13 Jun 2001 to 24 Nov 2026. Most recent record check: 28 Nov 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas28 mapped area records
Article 4 direction areasNo boundary records available in this collection

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

Older applications

  1. Decided23/00461/FULL

    Removal of existing internal and external banking related fittings and advertisements in relation to proposed branch closure.

    134 Aldersgate Street London EC1A 4JA

    Received 4 May 2023
  2. Decided23/00456/FULL

    Proposed installation for replacement of eight condenser units at roof level.

    8 - 10 Mansion House Place London EC4N 8BJ

    Received 4 May 2023
  3. Decided23/00458/LBC

    Installation of new internal and external (within the north and south lightwells) ducting at ground to roof level, plant installation, extract flues and associated works in relation to the education use of the building and provision of a program of interpretation including: creation of a Museum space (Use Class F1(c)) at the ground floor to the southern side of the main entrance hall; interpretation of the domed room at level six; and naming of meeting rooms and/or lecture rooms to reflect the history of the building.

    London Metropolitan University 84 Moorgate London EC2M 6SQ

    Received 3 May 2023
  4. Decided23/00457/FULL

    Installation of new internal and external (within the north and south lightwells) ducting at ground to roof level, plant installation, extract flues and associated works in relation to the education use of the building and provision of a program of interpretation including: creation of a Museum space (Use Class F1(c)) at the ground floor to the southern side of the main entrance hall; interpretation of the domed room at level six; and naming of meeting rooms and/or lecture rooms to reflect the history of the building.

    London Metropolitan University 84 Moorgate London EC2M 6SQ

    Received 3 May 2023
  5. Decided23/00455/MDC

    Submission of details reserved by conditions 2b (proposed details, gates only) pursuant to 21/00705/FULL and conditions 2b (proposed details, gates only) pursuant to 21/00706/LBC approved on the 30th March 2023.

    Salisbury House 31 Finsbury Circus London EC2M 5SQ

    Received 3 May 2023
  6. Withdrawn23/00454/ADVT

    Please refer to covering letter.

    10 Fleet Place London EC4M 7RB

    Received 3 May 2023
  7. Decided23/00451/ADVT

    Installation and display of one internally illuminated sign measuring 3m high by 0.8m wide situated at ground level.

    10 Fleet Place London EC4M 7RB

    Received 3 May 2023
  8. Decided23/00469/FULEIA

    Partial demolition of existing buildings and the redevelopment of the site comprising the construction of a new building comprising ground floor plus 23 upper storeys plus 2 existing basement levels (55 Old Broad Street) for the provision of office space (Class E(g)), flexible retail / cafe (Class E(a)(b)), retention of ground floor plus 5 storey building (65 Old Broad Street) for the provision of maker / studio (Class E(g)), flexible retail / cafe / maker / studio (Class E(a)(b)(g)), flexible maker / studio / office (Class E(g)), renovation of Grade II Listed Bath House building for the provision of cultural / event uses (Sui Generis), provision of public house (Sui Generis) and improvements to public realm and routes, ancillary basement cycle parking, servicing and plant, highway improvements and other works associated with the proposed development.RE-CONSULTATION - due to amended details as explained in Cover Letter dated 29th September 2023.

    55 And 65 Old Broad Street London EC2M 1RX

    Received 2 May 2023
  9. Under Consideration23/00453/FULEIA

    Liverpool Street Station:Partial demolition of Station including concourse, train sheds and entrances to Bishopsgate, Liverpool Street and Sun Street Passage. Demolition of 50 Liverpool Street. Construction and remodelling of station at basement, lower and upper concourses, new station roof, new entrances to Bishopsgate, Liverpool Street and Sun Street Passage, new lifts and escalators. Provision of units at basement, lower and upper concourse flrs for retail, caf�/restaurant, pub/bar. Remodelling of existing bus station and provision of a cycle hub on upper concourse. Andaz/Great Eastern Hotel:Alteration of existing building at basement, ground and upper flrs including insertion of new structure, creation of new west wall and removal and replacement of mansard roof. Change of use from hotel to office at part ground flr and across flrs 1-4; access to servicing area from vehicle lifts at flr 3; provision of units at basement and ground for retail, caf�/restaurant, and pub/bar; spaces for leisure and community uses; retail and caf�/restaurant at part of flr 5.Over Station Development:Erection of a new building above Liverpool Street Station and 40 Liverpool Street with maximum height of 108.6 metres AOD in height (excluding rooftop plant) comprising office use at flrs 5-13, and partly at flrs 14-15, with ancillary lobby and functions at flrs 3-4. New hotel at flrs 17-20 and partly within flrs 14-16, ancillary restaurant/bar at flr 15 and ancillary leisure facility at flr 16. New public amenity space at podium level comprising caf�/restaurant, retail, leisure; and partially at flr 16 comprising outdoor pool, leisure court and caf�/restaurant, alongside a publicly accessible roof garden. Provision of lifts, cycle parking, servicing, refuse, and plant.Public Realm:Refurbishment and extension of Hope Square and Bishopsgate Plaza. New pedestrian routes, including the pedestrianisation of Liverpool Street and new pedestrian footway to Exchange Square

    Site Bounded By 40 Liverpool Street, 50 Liverpool Street, Open Space From Liverpool Street (Hope Square) And Bishopsgate (Bishopsgate Square), And Sun Street Passage/Liverpool Street Bus Station At The Western Boundary London

    Received 2 May 2023
  10. Decided23/00450/MDC

    Submission of details of: an interim travel plan pursuant to condition 4 of planning permission 19/00837/FULL dated 03.12.2019.

    155 Bishopsgate London EC2M 3TQ

    Received 2 May 2023
  11. Decided23/00449/TTT

    Partial discharge of Schedule 3 requirements relating to the Landscaping and detailed design works (River wall Granite, paving) pursuant to BLABF 5 and BLABF 14 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR

    Received 2 May 2023
  12. Decided23/00448/MDC

    Submission of a Construction Logistics Plan pursuant to condition 2 of planning permission dated 05.01.2023 (Reference 22/00508/FULL).

    Daniel House And Mersey House (Former Daily Telegraph Building) 131 - 141 Fleet Street London EC4A 2BJ

    Received 2 May 2023
  13. Decided23/00447/LBC

    Installation of roof mounted solar panels.

    6 Frederick's Place London EC2R 8AB

    Received 2 May 2023
  14. Decided23/00446/FULL

    Installation of roof mounted solar panels.

    6 Frederick's Place London EC2R 8AB

    Received 2 May 2023
  15. Decided23/00440/MDC

    Submission of a Construction Logistics Plan pursuant to Condition 20(part) (Construction Phase) of planning permission 21/00755/FULMAJ (dated 07.02.2022).

    14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT

    Received 2 May 2023
  16. Decided23/00436/NMA

    Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) for application reference 22/00164/FULL dated 27.07.22 to include facade amendments; rooftop overrun and insertion of additional door in east elevation

    3A New Street Square London EC4A 3BF

    Received 1 May 2023
  17. Decided23/00435/MDC

    Submission of details pursuant to Conditions 5 (materials and facade information) and 12 (balustrade details and risk assessment) for application reference 22/00164/FULL dated 27.07.22.

    3A New Street Square London EC4A 3BF

    Received 1 May 2023
  18. Decided23/00434/CLOPD

    Certificate of Lawful Development (Proposed) for confirmation that Unit 2B at part lower ground and part ground floor falls within Use Class E (Commercial, Business and Service).

    80 Fenchurch Street London EC3M 4BT

    Received 1 May 2023
  19. Decided23/00437/ADVT

    Installation and display of: (i) one non-illuminated advert hoarding measuring 2.78m high by 61.5m wide (western elevation); (ii) one non-illuminated advert hoarding measuring 2.44m high by 68m wide (eastern elevation); and (iii) one non-illuminated advert hoarding measuring 2.57m high by 21m wide (north elevation) associated with the development of the site for a temporary period until 01.09.2024.

    101 Moorgate London EC2M 6SL

    Received 28 Apr 2023
  20. Decided23/00432/MDC

    Submission pursuant to Conditions 4(b) Office and retail entrances at ground floor, (c) Window cleaning equipment and the garaging thereof plant, flues, fire escapes, and other excrescences at roof level, (d) Cleaning of new metal cladding, (e) Soffits, handrails, and balustrades (f) Loading bay and cycle entrance (g) External lighting, (h) External surfaces within site boundary, Condition 5 (Construction, planting, irrigation and maintenance regime of green walls/roofs and balustrades), Condition 6 (Position and size of green walls, roofs and balustrade and type of planting in contribution to biodiversity), Condition 7 (Lighting Strategy) and Condition 9 (Air quality report) of planning permission dated 29/07/2021 (app. no. 20/00870/FULL).

    11 Pilgrim Street London EC4V 6RN

    Received 27 Apr 2023
  21. Decided23/00427/MDC

    Submission of details of a scaffold roof and protection screen around the Grade I Listed Tower pursuant to part (f) of condition 26 of planning permission 19/01307/FULEIA dated 23rd September 2021.

    Site Bounded By Fenchurch Street, Mark Lane, Dunster Court And Mincing Lane. London EC3M 3JY

    Received 27 Apr 2023
  22. Decided23/00426/MDC

    Submission of Written Scheme of Investigation for an Archaeological Watching Brief on Geotechnical Investigation pursuant to condition 11 of planning permission 19/01307/FULEIA dated 23rd September 2021.

    Site Bounded By Fenchurch Street, Mark Lane, Dunster Court And Mincing Lane. London EC3M 3JY

    Received 27 Apr 2023
  23. Decided23/00425/LBC

    Replacing existing glazed balustrade at sixth floor level of Grade II star building, with a 1.4m high new glazed balustrade and relocating it towards the parapet line.

    10 Trinity Square London EC3N 4AJ

    Received 26 Apr 2023
  24. Decided23/00424/FULL

    Replacing existing glazed balustrade at sixth floor level with a 1.4m high new glazed balustrade and relocating it towards the parapet line.

    10 Trinity Square London EC3N 4AJ

    Received 26 Apr 2023

Applications are listed by received date, newest first. Records without a received date appear at the end.

All collected records View all applications

Get emailed about new planning applications in London Corporation

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in City of London Corporation

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for City of London Corporation, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage