Awaiting decisionCouncil status: Under Consideration
Installation of new ceiling mounted sprinkler systems and associated pipework at Levels -1, 0, 1 and 2 across the Arts Centre main Foyers and Library spaces; replacement and installation of sprinklers within the Staff Spaces; replacement of sprinklers within the Curve Gallery; installation of sprinkler mains within Shafts 13 and 17; ventilation and ductwork to the GSMD lightwell and associated works.
Arts Centre Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Installation of new ceiling mounted sprinkler systems and associated pipework at Levels -1, 0, 1 and 2 across the Arts Centre main Foyers and Library spaces; replacement and installation of sprinklers within the Staff Spaces; replacement of sprinklers within the Curve Gallery; installation of sprinkler mains within Shafts 13 and 17; ventilation and ductwork to the GSMD lightwell and associated works.
Reference
26/01407/LBC
Alternative references
PP-15242693
Ward
Cripplegate
Agent
The Planning Lab
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.