Awaiting decisionCouncil status: Under Consideration
Installation and display of a number of signs comprising: i) A new fascia with trough lighting running the width of the frontage over a centrally located 'KFC' sign in powder coated aluminium coloured white with black returns; ii) A replacement acrylic projecting sign with external illumination in place of the existing projecting sign at the righthand side of the unit; iii) An aluminium panel above the customer entrance containing a back lit stained glass effect KFC bucket logo; iv) Existing shopfront to be deep cleaned and repainted to match existing colour scheme; v) Replacement of existing double door entrance with single door solution to enhance accessible access; vi) Installation of new transom on left hand window to match detail on right hand side.
Installation and display of a number of signs comprising: i) A new fascia with trough lighting running the width of the frontage over a centrally located 'KFC' sign in powder coated aluminium coloured white with black returns; ii) A replacement acrylic projecting sign with external illumination in place of the existing projecting sign at the righthand side of the unit; iii) An aluminium panel above the customer entrance containing a back lit stained glass effect KFC bucket logo; iv) Existing shopfront to be deep cleaned and repainted to match existing colour scheme; v) Replacement of existing double door entrance with single door solution to enhance accessible access; vi) Installation of new transom on left hand window to match detail on right hand side.
Reference
26/01298/LBC
Alternative references
PP-15214402
Ward
Farringdon Within
Agent
Pyrke Planning
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.