Awaiting decisionCouncil status: Under Consideration

Internal and external works comprising: (i) removal of the existing external condensers and their replacement with new condensers on the flat roof at second-floor level; (ii) installation of refrigerant pipes via the existing service routes to enter the building; (iii) installation of a louvred acoustic enclosure around the condensers; (iv) replacement of the whole-building heating system from gas to electric, with the retention of all historic heating fixtures and fittings; and (v) introduction of two new penetrations through the roof of the fifth-floor plant room to accommodate kitchen supply and extract, connecting to the existing risers via new acoustic attenuators and fan units.

Simpsons Tavern 38 And A Half Cornhill London EC3V 9DR

City of London CorporationReference 26/01177/LBCListed Building Consent

Last published check: 20 Nov 2026, 16:16. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 20 Nov 2026, 16:16 (UK)

7days past target decision date19 Nov 2026 · decision not yet published

  1. DoneReceived17 Aug 2026
  2. DoneValidated24 Sept 2026
  3. ClosedConsultationEnded 23 Oct 2026
  4. Overdue · 7 daysTarget decision date19 Nov 2026
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (11)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Listed Building Consent
Ward
Cornhill
Documents
24 published

Proposal

Internal and external works comprising: (i) removal of the existing external condensers and their replacement with new condensers on the flat roof at second-floor level; (ii) installation of refrigerant pipes via the existing service routes to enter the building; (iii) installation of a louvred acoustic enclosure around the condensers; (iv) replacement of the whole-building heating system from gas to electric, with the retention of all historic heating fixtures and fittings; and (v) introduction of two new penetrations through the roof of the fifth-floor plant room to accommodate kitchen supply and extract, connecting to the existing risers via new acoustic attenuators and fan units.

Reference
26/01177/LBC
Alternative references
PP-15159926
Ward
Cornhill
Agent
E2 Architecture + Interiors

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • COMMENTS - HISTORIC ENGLANDConsultee Comment5 Nov 2026View
  • FINAL AUTHORISATION - HISTORIC ENGLANDConsultee Comment12 Oct 2026View
  • COMMENTS - HISTORIC ENGLANDConsultee Comment12 Oct 2026View
  • PROPOSED ELEVATION L2 ROOFDrawing24 Sept 2026View
  • PROPOSED NORTH ELEVATIONAccompanying letters24 Sept 2026View
  • PROPOSED EAST ELEVATIONAccompanying letters24 Sept 2026View
  • APPLICATIONFORMREDACTEDApplication Form17 Aug 2026View
  • LOCATIONPLANSite Plan17 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.