Council planning record

Non-Material Amendment under S96A of the Town and Country Planning Act 1990 (as amended) to planning permission 25/00223/FULEIA dated 19th December 2025 to allow for the introduction of a phasing plan consisting of three phases (including early works) via an additional condition and the amendment of Conditions 9, 10, 15, 16, 18, 23, 24, 26, 28, 30, 31, 34, 36, 45, 53, 54, 56, 57, 66, 68 and 77 to reference the proposed phasing plan and to amend conditions 49 (Cycle Parking), 76 (Uses) and 79 (Approved Drawings) to allow for design changes including: (i) reduction in basement extent from 6 to 4 levels, (ii) alterations to plant, (iii) reduction in long stay cycle parking; (iv) fa�ade alterations; (v) and all associated changes.

63 St Mary Axe London EC3A 8AA

Under ConsiderationReference: 26/01138/NMACity of London Corporation

Last published check: 27 Sept 2026, 20:13. Check the council record for more recent changes.

Application location

63 St Mary Axe London EC3A 8AA

This record has no verified map location.

View council map

Application summary

Status
Under Consideration
Application type
Non-material Amendments
Received
7 Aug 2026
Validated
17 Aug 2026
Determination deadline
14 Sept 2026
Local authority
City of London Corporation

Application overview

Non-Material Amendment under S96A of the Town and Country Planning Act 1990 (as amended) to planning permission 25/00223/FULEIA dated 19th December 2025 to allow for the introduction of a phasing plan consisting of three phases (including early works) via an additional condition and the amendment of Conditions 9, 10, 15, 16, 18, 23, 24, 26, 28, 30, 31, 34, 36, 45, 53, 54, 56, 57, 66, 68 and 77 to reference the proposed phasing plan and to amend conditions 49 (Cycle Parking), 76 (Uses) and 79 (Approved Drawings) to allow for design changes including: (i) reduction in basement extent from 6 to 4 levels, (ii) alterations to plant, (iii) reduction in long stay cycle parking; (iv) fa�ade alterations; (v) and all associated changes.

Proposal details

Reference
26/01138/NMA
Alternative references
PP-15021183
Ward
Bishopsgate
Agent
Dp9 Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 86 of 86

DocumentPublishedAction
COMMENTS - HISTORIC ENGLANDConsultee Comment · PDF28 Aug 2026View
MARKED UP DECISION NOTICE- REQUESTED AMENDMENTS TO CONDITIONAccompanying report21 Aug 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 02Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 03Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 16Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 17Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 18Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 19Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 20Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 21Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 22Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 23Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 24Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 25Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 26Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 27Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 28Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 29Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 30Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 31Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 32Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 33Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 34Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 35Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 36Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 37Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 38Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 39Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 40Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 41Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 42Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 43Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 44Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 45Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL B1Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL B2Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL B3Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL B4Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL LIFT PIT 1Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL LIFT PIT 2Drawing · PDF7 Aug 2026View
PROPOSED SECTION A-ADrawing · PDF7 Aug 2026View
63 ST MARY AXE S96A TRANSPORT TECHNICAL NOTE JUNE 2026 V1.1Other · PDF7 Aug 2026View
1864-XX-XX-RP-A-16003-P01_APPENDIX_PART 1Accompanying report · PDF7 Aug 2026View
1864-XX-XX-RP-A-16003-P01_APPENDIX_PART 2Accompanying report · PDF7 Aug 2026View
PROPOSED SECTION B-BDrawing · PDF7 Aug 2026View
PROPOSED SECTION C-CDrawing · PDF7 Aug 2026View
PROPOSED SECTION D-DDrawing · PDF7 Aug 2026View
PROPOSED ELEVATION ST MARY AXEDrawing · PDF7 Aug 2026View
PROPOSED PLAN GROUND FLOORDrawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 01Drawing · PDF7 Aug 2026View
ARCHAEOLOGY STATEMENT OF CONFORMITY - 63 ST MARY AXE.V1Other · PDF7 Aug 2026View
1864-XX-XX-RP-A-16003-P01_APPENDIX_PART 5Accompanying report · PDF7 Aug 2026View
1864-XX-XX-RP-A-16003-P01_APPENDIX_PART 6Accompanying report · PDF7 Aug 2026View
1864-XX-XX-RP-A-16003-P01_APPENDIX_PART 7Accompanying report · PDF7 Aug 2026View
1864-XX-XX-RP-A-16003-P01_APPENDIX_PART 8Accompanying report · PDF7 Aug 2026View
1864-XX-XX-RP-A-16003-P01_APPENDIX_PART 9Accompanying report · PDF7 Aug 2026View
1864-XX-XX-RP-A-16003-P01_PART 1Accompanying report · PDF7 Aug 2026View
1864-XX-XX-RP-A-16003-P01_PART 2Accompanying report · PDF7 Aug 2026View
1864-XX-XX-RP-A-16003-P01_PART 3Accompanying report · PDF7 Aug 2026View
PROJECT_SKY_EIA_STATEMENT_OF_CONFORMITY_FINAL_1Report - Environmental Statement · PDF7 Aug 2026View
PHASE 1 PLAN ENABLING WORKS AND DEMOLITIONDrawing · PDF7 Aug 2026View
PHASE 2 PLAN EXCAVATION AND CONSTRUCTION OF THE BASEMENTDrawing · PDF7 Aug 2026View
PHASE 3 PLAN ABOVE GROUND CONSTRUCTION WORKSDrawing · PDF7 Aug 2026View
PHASE 2 EARLY WORK EXISTING GROUND FLOOR PLANDrawing · PDF7 Aug 2026View
PHASE 3 EARLY WORK EXISTING GROUND FLOOR PLANDrawing · PDF7 Aug 2026View
PHASE 1 EARLY WORKS EXISTING ROOF PLANDrawing · PDF7 Aug 2026View
23 CAMOMILE STREET CHILLER REMOVAL RAMS REV 2Other · PDF7 Aug 2026View
CAMOMILE STREET PAVEMENT CROSS OVER RAMS REV 2Other · PDF7 Aug 2026View
HOUNDSDITCH PAVEMENT CROSS OVER RAMS REV 2Other · PDF7 Aug 2026View
63 ST MARY AXE NMA COVERING LETTER 06.08.2026Cover Letter · PDF7 Aug 2026View
CIL FORM 1Other · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 04Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 05Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 06Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 07Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 08Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 09Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 10Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 11Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 12Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 13Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 14Drawing · PDF7 Aug 2026View
PROPOSED PLAN LEVEL 15Drawing · PDF7 Aug 2026View
1864-XX-XX-RP-A-16003-P01_APPENDIX_PART 3Accompanying report · PDF7 Aug 2026View
1864-XX-XX-RP-A-16003-P01_APPENDIX_PART 4Accompanying report · PDF7 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
MARKED UP DECISION NOTICE- REQUESTED AMENDMENTS TO CONDITION
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.