Council planning record

Application under Section 73 of the Town and Country Planning Act 1990 (as amended) in relation to planning permission 24/01262/FULL dated 23 December 2025, to vary condition 6 (access to terraces) to reflect amended configuration of terraces and balconies, condition 20 (basement plans) to reflect amended basement layouts, condition 31 (biodiversity gain plan), to reflect amended landscaping and planting, condition 57 (cycle parking), to amend long stay and short stay cycle parking provision, condition 67 (fire strategy) to reflect amended fire strategy, condition 73 (floor areas) to reflect amended floor areas and layout reconfiguration, condition 74 (approved plans), to include an extension of the proposed building to the south with the introduction of inset balconies, extension of basement level B2, reconfiguration of the proposed plant and the formation of a ground floor colonnade with new pedestrian route, and condition 76 (height of the building) to increase the height of the proposed building and accompanying deed of variation to the section 106 agreement to vary planning obligations.

319-325 High Holborn (Heron House), 326-332 High Holborn And 26 Southampton Buildings (Holborn Gate), And 44 Southampton Buildings, WC1 And WC2

Under ConsiderationReference: 26/01108/FULMAJCity of London Corporation

Last published check: 27 Sept 2026, 22:07. Check the council record for more recent changes.

Application location

319-325 High Holborn (Heron House), 326-332 High Holborn And 26 Southampton Buildings (Holborn Gate), And 44 Southampton Buildings, WC1 And WC2

This record has no verified map location.

View council map

Application summary

Status
Under Consideration
Application type
Full Major Application
Received
3 Aug 2026
Validated
3 Aug 2026
Determination deadline
2 Nov 2026
Local authority
City of London Corporation

Application overview

Application under Section 73 of the Town and Country Planning Act 1990 (as amended) in relation to planning permission 24/01262/FULL dated 23 December 2025, to vary condition 6 (access to terraces) to reflect amended configuration of terraces and balconies, condition 20 (basement plans) to reflect amended basement layouts, condition 31 (biodiversity gain plan), to reflect amended landscaping and planting, condition 57 (cycle parking), to amend long stay and short stay cycle parking provision, condition 67 (fire strategy) to reflect amended fire strategy, condition 73 (floor areas) to reflect amended floor areas and layout reconfiguration, condition 74 (approved plans), to include an extension of the proposed building to the south with the introduction of inset balconies, extension of basement level B2, reconfiguration of the proposed plant and the formation of a ground floor colonnade with new pedestrian route, and condition 76 (height of the building) to increase the height of the proposed building and accompanying deed of variation to the section 106 agreement to vary planning obligations.

Proposal details

Reference
26/01108/FULMAJ
Alternative references
PP-15090032
Ward
Farringdon Without
Agent
Newmark

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 151 of 151

DocumentPublishedAction
REPRESENTATION - CITY OF LONDON CONSERVATION AREA ADVISORY COMMITTEEPublic Comment · PDF21 Sept 2026View
COMMENTS - LONDON BOROUGH OF CAMDENConsultee Comment · PDF18 Sept 2026View
COMMENTS - SURVEYOR TO THE FABRIC OF ST PAUL?S CATHEDRALConsultee Comment · PDF17 Sept 2026View
COMMENTS - GREATER LONDON AUTHORITYConsultee Comment · PDF11 Sept 2026View
COMMENTS - THAMES WATERConsultee Comment · PDF4 Sept 2026View
COMMENTS - TRANSPORT FOR LONDONConsultee Comment · PDF3 Sept 2026View
COMMENTS - THE GARDENS TRUSTConsultee Comment · PDF26 Aug 2026View
COMMENT - GREATER LONDON ARCHAEOLOGICAL ADVISORY SERVICEConsultee Comment · PDF25 Aug 2026View
COMMENTS - WESTMINSTER CITY COUNCILConsultee Comment · PDF24 Aug 2026View
COMMENTS - ACTIVE TRAVEL ENGLANDConsultee Comment · PDF18 Aug 2026View
COMMENTS - HEATHROW AIRPORT LTD.Consultee Comment · PDF14 Aug 2026View
COMMENTS - NATS SAFEGUARDINGConsultee Comment · PDF14 Aug 2026View
COMMENTS - ENVIRONMENT AGENCYConsultee Comment · PDF14 Aug 2026View
REPRESENTATION - FLAT 303, 7 HIGH HOLBORNPublic Comment12 Aug 2026View
WLC_GLA SPREADSHEETOther · PDF4 Aug 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF3 Aug 2026View
ATTACHMENTSUMMARYReport - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 6 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 8 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 26 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 27 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 28 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 29 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 30 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 2 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 13 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 14 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 15 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 16 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 17 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 18 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 9 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 3 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 4 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 22 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 23 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 24 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 25 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
BAY 5C -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 6A -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 5D -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 4C -TYPICAL SET-BACK BAYDrawing · PDF3 Aug 2026View
RAILINGS -PROPOSED SITE PLANDrawing · PDF3 Aug 2026View
PROPOSED LEVEL 4 FLOOR PLANDrawing · PDF3 Aug 2026View
PROPOSED LEVEL 5 FLOOR PLANDrawing · PDF3 Aug 2026View
PROPOSED LEVEL 6 FLOOR PLANDrawing · PDF3 Aug 2026View
PROPOSED LEVEL 7 FLOOR PLANDrawing · PDF3 Aug 2026View
294009-ARP-RP-YT-10004 - TA ADDENDUM - P04Report - Transport Statement/Report · PDF3 Aug 2026View
294009-ARP-RP-YT-10005 - DSMP ADDENDUM - P02Other · PDF3 Aug 2026View
HIGH HOLBORN_TBHVIA S73 ADDENDUM_PART 1 OF 2Other · PDF3 Aug 2026View
HIGH HOLBORN_TBHVIA S73 ADDENDUM_PART 2 OF 2Other · PDF3 Aug 2026View
1547 - LETTER OF CONFORMITY CITY OF LONDON WITH COVERReport - Tree Report · PDF3 Aug 2026View
554478ES20JUL26_FV03_UGFOther · PDF3 Aug 2026View
294009-ARP-RP-YS-10005_P00 WHOLE LIFE CARBON ASSESSMENT - SECTION 73 UPDATE (21JOther · PDF3 Aug 2026View
URBAN GREENING FACTORDrawing · PDF3 Aug 2026View
LEVEL 06 GENERAL ARRANGEMENT PLANDrawing · PDF3 Aug 2026View
LEVEL 06 PLANTING PLANDrawing · PDF3 Aug 2026View
LEVEL 07 GENERAL ARRANGEMENT PLANDrawing · PDF3 Aug 2026View
LEVEL 07 PLANTING PLANDrawing · PDF3 Aug 2026View
LEVEL 08 GENERAL ARRANGEMENT PLANDrawing · PDF3 Aug 2026View
LEVEL 08 PLANTING PLANDrawing · PDF3 Aug 2026View
LEVEL 09 GENERAL ARRANGEMENT PLANDrawing · PDF3 Aug 2026View
LEVEL 09 PLANTING PLANDrawing · PDF3 Aug 2026View
LEVEL 10 GENERAL ARRANGEMENT PLANDrawing · PDF3 Aug 2026View
LEVEL 10 PLANTING PLANDrawing · PDF3 Aug 2026View
GROUND FLOOR GENERAL ARRANGEMENT PLANDrawing · PDF3 Aug 2026View
GROUND FLOOR LANDSCAPE SECTIONDrawing · PDF3 Aug 2026View
GROUND FLOOR PLANTING PLANDrawing · PDF3 Aug 2026View
LEVEL 01-05 GENERAL ARRANGEMENT PLANDrawing · PDF3 Aug 2026View
ROOF TERRACES LANDSCAPE SECTIONSDrawing · PDF3 Aug 2026View
P21906-00-001-GIL-0000Drawings Schedule · PDF3 Aug 2026View
ILLUSTRATIVE GENERAL ARRANGEMENT PLANDrawing · PDF3 Aug 2026View
024829-R05-C PLANNING NOISE REPORT ADDENDUMReport - Acoustic/Noise Report · PDF3 Aug 2026View
260730 - HIGH HOLBORN - SECTION 73 APPLICANT COVERING LETTERCover Letter · PDF3 Aug 2026View
260730 - HIGH HOLBORN PLANNING STATEMENTReport - Planning Statement/Report · PDF3 Aug 2026View
HOL-MAK-XX-ZZ-DR-AR-080000Site Plan · PDF3 Aug 2026View
HOL-MAK-XX-ZZ-DR-AR-080001Site Plan · PDF3 Aug 2026View
HIGH HOLBORN DEVELOPMENT - ADDENDUM TO ORIGINAL STATEMENT OF COMMUNITY INVOLVEMEOther · PDF3 Aug 2026View
322 HIGH HOLBORN_REV02_ADDENDUM_CEMP WITH COVEROther · PDF3 Aug 2026View
322 HIGH HOLBORN_REV02_ADDENDUM_CEMP_APP.1 WITH COVEROther · PDF3 Aug 2026View
294009-ARP-RP-YS-10007 CIRCULAR ECONOMY STATEMENT _SECTION 73Other · PDF3 Aug 2026View
22.07.26_HIGH_HOLBORN_DEVELOPMENT_CIRCULAR_ECONOMY_GLA_SPREADSHEET_SECTION 73Other3 Aug 2026View
294009-ARP-RP-YE-10004 AIR QUALITY CONFORMITY STATEMENT_P03Accompanying report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 19 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 20 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 1 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 10 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 12 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 11 OF 30_COMPRESSEDReport - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 21 OF 30_COMPRESSEDReport - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 7 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
DESIGN AND ACCESS STATEMENT ADDENDUM PART 5 OF 30Report - Design & Access Statement/Report · PDF3 Aug 2026View
2026-07-17_SG_SOC_IS05_19430_REV2_COMPRESSEDOther · PDF3 Aug 2026View
19430-20260716-GM(DSO SUMMARY NOTE APPENDICES)Other · PDF3 Aug 2026View
260730 - CIL FORM 1 - HIGH HOLBORNOther · PDF3 Aug 2026View
PROPOSED SECTION C-CDrawing · PDF3 Aug 2026View
PROPOSED SECTION D-DDrawing · PDF3 Aug 2026View
PROPOSED NORTH ELEVATIONDrawing · PDF3 Aug 2026View
PROPOSED EAST ELEVATIONDrawing · PDF3 Aug 2026View
PROPOSED SOUTH ELEVATIONDrawing · PDF3 Aug 2026View
PROPOSED WEST ELEVATIONDrawing · PDF3 Aug 2026View
BAY 1A -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 1B -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 2A -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 2B -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 3A -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 3B -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 4A -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 4B-TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 5A -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 5B -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 6B -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 7A -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 7B -TYPICAL SET-BACK BAYDrawing · PDF3 Aug 2026View
BAY 8A -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 8B -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 9A -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
BAY 9B -TYPICAL FACADE BAYDrawing · PDF3 Aug 2026View
RAILINGS FIXED TO STAPLE INN BUILDINGS NORTH AND SOUTH_DEMOLITIONDrawing · PDF3 Aug 2026View
RAILINGS FIXED TO STAPLE INN BUILDINGS NORTH AND SOUTH_PROPOSEDDrawing · PDF3 Aug 2026View
HOL-MAK-XX-ZZ-SH-AR-070100Drawings Schedule · PDF3 Aug 2026View
PROPOSED GROUND FLOORDrawing · PDF3 Aug 2026View
PROPOSED GROUND FLOOR PLAN MEZZANINEDrawing · PDF3 Aug 2026View
PROPOSED LEVEL 1 FLOOR PLANDrawing · PDF3 Aug 2026View
PROPOSED LEVEL 2 FLOOR PLANDrawing · PDF3 Aug 2026View
PROPOSED LEVEL 3 FLOOR PLANDrawing · PDF3 Aug 2026View
PROPOSED LEVEL 8 FLOOR PLANDrawing · PDF3 Aug 2026View
PROPOSED LEVEL 9 FLOOR PLANDrawing · PDF3 Aug 2026View
PROPOSED LEVEL 10 FLOOR PLANDrawing · PDF3 Aug 2026View
PROPOSED BASEMENT LEVEL 1 FLOOR PLANDrawing · PDF3 Aug 2026View
PROPOSED BASEMENT LEVEL 2 FLOOR PLANDrawing · PDF3 Aug 2026View
PROPOSED LEVEL ROOF PLANDrawing · PDF3 Aug 2026View
PROPOSED SITE PLANSite Plan · PDF3 Aug 2026View
PROPOSED SECTION A-ADrawing · PDF3 Aug 2026View
PROPOSED SECTION B-BDrawing · PDF3 Aug 2026View
HIGH_HOLBORN_DEVELOPMENT_WLC_GLA SPREADSHEET (SECTION 73 UPDATE JUL 2026)Other3 Aug 2026View
19430_HIGH HOLBORN_WIND MICROCLIMATE AND OUTDOOR THERMAL COMFORT ADDENDUM_260722Other · PDF3 Aug 2026View
94009-ARP-RP-M-10001 HH ENERGY STATEMENT - STAGE 3 WITH COVEROther · PDF3 Aug 2026View
APPENDIX A1 - OVERHEATING ASSESSMENT (UPDATE)Other · PDF3 Aug 2026View
APPENDIX A2 - SCOP AND SEER CALCULATION - STAGE 3Other · PDF3 Aug 2026View
APPENDIX A3 - BE SEEN REPORTING SPREADSHEETOther · PDF3 Aug 2026View
APPENDIX A4 - ENERGY ASSESSMENT OUTPUTS (BE GREEN BRUKL)Other · PDF3 Aug 2026View
APPENDIX A4 - ENERGY ASSESSMENT OUTPUTS (BE LEAN BRUKL)Other · PDF3 Aug 2026View
APPENDIX A5 - COMMUNICATIONS WITH LOCAL HEAT NETWORKSOther · PDF3 Aug 2026View
294009-ARP-RP-YE-10005 - EQIA - STATEMENT OF CONFORMITY_REVP02Other · PDF3 Aug 2026View
294009-ARP-RP-YF-10001_FIRE STATEMENT MMA UPDATE-S2 P05Other · PDF3 Aug 2026View
294009-ARP-RP-C-10002_FLOOD RISK ASSESSMENT AND SUDS STRATEGY_ADDENDUMAccompanying report · PDF3 Aug 2026View
294009-ARP-RP-YE-10006 - HIA - STATEMENT OF CONFORMITY REV P02Other · PDF3 Aug 2026View
HIHOL.02 HIGH HOLBORN ADDENDUM HERITAGE STATEMENTAccompanying report · PDF3 Aug 2026View
52693 L01 (00) WITH COVEROther · PDF3 Aug 2026View
SUSTAINABLE DEVELOPMENT AND CLIMATE CHANGE REPORT ADDENDUMAccompanying report · PDF3 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  7. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.