Council planning record

Extensions to the existing building, involving the partial demolition and construction at Levels 7 and 8 to provide additional office floorspace (Use Class E (g)(i)), including alterations to the external amenity terrace at Level 3, new rooftop plant, alterations to the lower levels including the provision of retail (Use Class E (a/b)) at ground floor level and flexible office / retail floorspace (Class E (a/b/g(i)) at lower ground floor level (basement 1), relocation of the primary building entrance, elevational alterations, re-provision of a public toilet and all associated works.

140 Aldersgate Street London EC1A 4HY

Under ConsiderationReference: 26/00748/FULMAJCity of London Corporation

Last published check: 28 Sept 2026, 03:18. Check the council record for more recent changes.

Application location

140 Aldersgate Street London EC1A 4HY

This record has no verified map location.

View council map

Application summary

Status
Under Consideration
Application type
Full Major Application
Received
22 May 2026
Validated
29 May 2026
Determination deadline
28 Aug 2026
Local authority
City of London Corporation

Application overview

Extensions to the existing building, involving the partial demolition and construction at Levels 7 and 8 to provide additional office floorspace (Use Class E (g)(i)), including alterations to the external amenity terrace at Level 3, new rooftop plant, alterations to the lower levels including the provision of retail (Use Class E (a/b)) at ground floor level and flexible office / retail floorspace (Class E (a/b/g(i)) at lower ground floor level (basement 1), relocation of the primary building entrance, elevational alterations, re-provision of a public toilet and all associated works.

Proposal details

Reference
26/00748/FULMAJ
Alternative references
PP-14894735
Ward
Farringdon Within
Agent
DP9

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 142 of 142

DocumentPublishedAction
ARBORICULTURAL DEVELOPMENT STATEMENTOther · PDF24 Aug 2026View
ABORICULTURAL DEVELOPMENT STATEMENTAccompanying report · PDF10 Aug 2026View
SUPPLEMENTARY DLSL RESULTSOther · PDF3 Aug 2026View
BUILDING LOADS DIFFERENTIALOther · PDF29 Jul 2026View
INDEPENDENT REVIEW OF DAYLIGHT AND SUNLIGHT ASSESSMENTAccompanying letters · PDF21 Jul 2026View
PROPOSED WEST ELEVATIONDrawing · PDF9 Jul 2026View
PROPOSED PLAN LEVEL 00Drawing · PDF6 Jul 2026View
PROPOSED PLAN LEVEL 01Drawing · PDF6 Jul 2026View
PROPOSED PLAN LEVEL 02Drawing · PDF6 Jul 2026View
PROPOSED PLAN LEVEL 03Drawing · PDF6 Jul 2026View
PROPOSED PLAN LEVEL 04Drawing · PDF6 Jul 2026View
PROPOSED PLAN LEVEL 05Drawing · PDF6 Jul 2026View
PROPOSED PLAN LEVEL 06Drawing · PDF6 Jul 2026View
PROPOSED PLAN LEVEL 07Drawing · PDF6 Jul 2026View
PROPOSED PLAN LEVEL 08Drawing · PDF6 Jul 2026View
PROPOSED PLAN LEVEL B1Drawing · PDF6 Jul 2026View
PROPOSED PLAN LEVEL B2Drawing · PDF6 Jul 2026View
PROPOSED PLAN LEVEL R1Drawing · PDF6 Jul 2026View
PROPOSED PLAN LEVEL R2Drawing · PDF6 Jul 2026View
REPRESENTATION - GEORGIA HOUSEPublic Comment · PDF5 Jul 2026View
COMMENTS - TRANSPORT FOR LONDONConsultee Comment · PDF2 Jul 2026View
AIR QUALITY ASSESSMENTAccompanying report · PDF24 Jun 2026View
PROPOSED PLAN - LEVEL 00Superseded drawing · PDF23 Jun 2026View
COMMENTS - TRANSPORT FOR LONDONConsultee Comment · PDF19 Jun 2026View
INDOOR AIR QUALITY PLANAccompanying report · PDF11 Jun 2026View
WIND MICROCLIMATE - WINDIEST SEASONAccompanying report · PDF9 Jun 2026View
COMMENTS - THAMES WATERConsultee Comment · PDF8 Jun 2026View
COMMENTS - HISTORIC ENGLANDConsultee Comment · PDF5 Jun 2026View
COMMENTS - TFLConsultee Comment · PDF5 Jun 2026View
COMMENTS - HISTORIC ENGLANDConsultee Comment · PDF4 Jun 2026View
SUPERSEDED GA WEST ELEVATIONSuperseded drawing · PDF29 May 2026View
DESIGN & ACCESS STATEMENT - CHAPTER 01Report - Design & Access Statement/Report · PDF29 May 2026View
DESIGN & ACCESS STATEMENT - CHAPTER 16Report - Design & Access Statement/Report · PDF29 May 2026View
LIGHTING STRATEGYAccompanying report · PDF29 May 2026View
140 ALDERSGATE COVER LETTERCover Letter · PDF22 May 2026View
140 ALDERSGATE ACOUSTIC REPORTReport - Acoustic/Noise Report · PDF22 May 2026View
140 ALDERSGATE CIL FORM 1Other · PDF22 May 2026View
140 ALDERSGATE CMP PART 1Accompanying report · PDF22 May 2026View
140 ALDERSGATE CMP PART 2Accompanying report · PDF22 May 2026View
140 ALDERSGATE CMP PART 3Accompanying report · PDF22 May 2026View
140 ALDERSGATE FIRE STATEMENTOther · PDF22 May 2026View
140 ALDERSGATE FLOOD RISK ASSESSMENTAccompanying report · PDF22 May 2026View
140 ALDERSGATE DSMPReport - Transport Statement/Report · PDF22 May 2026View
140 ALDERSGATE ECOLOGY APPRAISALAccompanying report · PDF22 May 2026View
140 ALDERSGATE EQUALITY IMPACT ASSESSMENTAccompanying report · PDF22 May 2026View
140 ALDERSGATE DRAINAGE REPORTAccompanying report · PDF22 May 2026View
140 ALDERSGATE DLSL REPORTAccompanying report · PDF22 May 2026View
140 ALDERSGATE PS APPENDIX 2 PLANNING POLICY AUDIT.Report - Planning Statement/Report · PDF22 May 2026View
140 ALDERSGATE HEALTH IMPACT ASSESSMENTAccompanying report · PDF22 May 2026View
140 ALDERSGATE HTVIA LR _PART 1 OF 2Accompanying report · PDF22 May 2026View
140 ALDERSGATE HTVIA LR _PART 2 OF 2Accompanying report · PDF22 May 2026View
140 ALDERSGATE TRANSPORT ASSESSMENT PART 2Report - Transport Statement/Report · PDF22 May 2026View
140 ALDERSGATE TRANSPORT ASSESSMENT PART 3Report - Transport Statement/Report · PDF22 May 2026View
140 ALDERSGATE TRAVEL PLAN - PART 1 OF 3Report - Travel Plan · PDF22 May 2026View
140 ALDERSGATE TRAVEL PLAN - PART 2 OF 3Report - Travel Plan · PDF22 May 2026View
140 ALDERSGATE TRAVEL PLAN - PART 3 OF 3Report - Travel Plan · PDF22 May 2026View
140 ALDERSGATE WLCA REPORTAccompanying report · PDF22 May 2026View
140 ALDERSGATE CES PART 1Accompanying report · PDF22 May 2026View
140 ALDERSGATE CES PART 2Accompanying report · PDF22 May 2026View
140 ALDERSGATE SUSTAINABILITY STMNTAccompanying report · PDF22 May 2026View
LVL 3 LANDSCAPE PLANOther · PDF22 May 2026View
ROOF LANDSCAPE PLANOther · PDF22 May 2026View
140 ALDERSGATE UGF CALCULATOROther · PDF22 May 2026View
DECONSTRUCTION PLAN - LEVEL 08Drawing · PDF22 May 2026View
PROPOSED PLAN - LEVEL B1Superseded drawing · PDF22 May 2026View
EXISTING PLAN - LEVEL 00Drawing · PDF22 May 2026View
DECONSTRUCTION PLAN - LEVEL 00Drawing · PDF22 May 2026View
PROPOSED PLAN - LEVEL 02Superseded drawing · PDF22 May 2026View
EXISTING PLAN - LEVEL 02Drawing · PDF22 May 2026View
DECONSTRUCTION PLAN - LEVEL 02Drawing · PDF22 May 2026View
PROPOSED PLAN - LEVEL 03Superseded drawing · PDF22 May 2026View
EXISTING PLAN - LEVEL 03Drawing · PDF22 May 2026View
DECONSTRUCTION PLAN - LEVEL 03Drawing · PDF22 May 2026View
PROPOSED PLAN - LEVEL 04Superseded drawing · PDF22 May 2026View
EXISTING PLAN - LEVEL 04Drawing · PDF22 May 2026View
DECONSTRUCTION PLAN - LEVEL 04Drawing · PDF22 May 2026View
PROPOSED PLAN - LEVEL 05Superseded drawing · PDF22 May 2026View
EXISTING PLAN - LEVEL 05Drawing · PDF22 May 2026View
DECONSTRUCTION PLAN - LEVEL 05Drawing · PDF22 May 2026View
PROPOSED PLAN - LEVEL 06Superseded drawing · PDF22 May 2026View
EXISTING PLAN - LEVEL 06Drawing · PDF22 May 2026View
DECONSTRUCTION PLAN - LEVEL 06Drawing · PDF22 May 2026View
PROPOSED PLAN - LEVEL 07Superseded drawing · PDF22 May 2026View
EXISTING PLAN - LEVEL 07Drawing · PDF22 May 2026View
DECONSTRUCTION PLAN - LEVEL 07Drawing · PDF22 May 2026View
PROPOSED PLAN - LEVEL 08Superseded drawing · PDF22 May 2026View
EXISTING PLAN - LEVEL 08Drawing · PDF22 May 2026View
EXISTING PLAN - LEVEL B1Drawing · PDF22 May 2026View
DECONSTRUCTION PLAN - LEVEL B1Drawing · PDF22 May 2026View
PROPOSED PLAN - LEVEL B2Superseded drawing · PDF22 May 2026View
EXISTING PLAN - LEVEL B2Drawing · PDF22 May 2026View
DECONSTRUCTION PLAN - LEVEL B2Drawing · PDF22 May 2026View
PROPOSED PLAN - LEVEL R1Superseded drawing · PDF22 May 2026View
PROPOSED PLAN - LEVEL R2Superseded drawing · PDF22 May 2026View
EXISTING PLAN - LEVEL RFDrawing · PDF22 May 2026View
DECONSTRUCTION PLAN - LEVEL RFDrawing · PDF22 May 2026View
GA EAST ELEVATIONDrawing · PDF22 May 2026View
EXISTING EAST ELEVATIONDrawing · PDF22 May 2026View
DECONSTRUCTION EAST ELEVATIONDrawing · PDF22 May 2026View
GA NORTH ELEVATIONDrawing · PDF22 May 2026View
EXISTING NORTH ELEVATIONDrawing · PDF22 May 2026View
DECONSTRUCTION NORTH ELEVATIONDrawing · PDF22 May 2026View
EXISTING WEST ELEVATIONDrawing · PDF22 May 2026View
DECONSTRUCTION WEST ELEVATIONDrawing · PDF22 May 2026View
GA SECTION AADrawing · PDF22 May 2026View
EXISTING SECTION AADrawing · PDF22 May 2026View
DECONSTRUCTION SECTION AADrawing · PDF22 May 2026View
GA SECTION BBDrawing · PDF22 May 2026View
EXISTING SECTION BBDrawing · PDF22 May 2026View
DECONSTRUCTION SECTION BBDrawing · PDF22 May 2026View
GA SECTION CCDrawing · PDF22 May 2026View
EXISTING SECTION CCDrawing · PDF22 May 2026View
DECONSTRUCTION SECTION CCDrawing · PDF22 May 2026View
140ALD-GEN-XX-XX-L-A-DIR000Drawings Schedule · PDF22 May 2026View
140ALD-GEN-ZZ-00-D-A-020110Site Plan · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 02Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 04Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 05Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 06Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 07 (PART 1 OF 3)Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 07 (PART 2 OF 3)Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 07 (PART 3 OF 3)Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 08Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 09Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 10Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 12 (PART 2 OF 2)Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 13Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 14Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 15Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 03_COMPRESSEDReport - Design & Access Statement/Report · PDF22 May 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF22 May 2026View
140 ALDERSGATE PLANNING STATEMENTReport - Planning Statement/Report · PDF22 May 2026View
140 ALDERSGATE SCIOther · PDF22 May 2026View
140 ALDERSGATE UTILITIES STATEMENTAccompanying report · PDF22 May 2026View
140 ALDERSGATE WIND MICROCLIMATE ASSESSMENTAccompanying report · PDF22 May 2026View
140 ALDERSGATE TRANSPORT ASSESSMENT PART 1Report - Transport Statement/Report · PDF22 May 2026View
KEY LOCATION PLANSite Plan · PDF22 May 2026View
PROPOSED PLAN - LEVEL 01Superseded drawing · PDF22 May 2026View
EXISTING PLAN - LEVEL 01Drawing · PDF22 May 2026View
DECONSTRUCTION PLAN - LEVEL 01Drawing · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 11Report - Design & Access Statement/Report · PDF22 May 2026View
260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 12 (PART 1 OF 2)Report - Design & Access Statement/Report · PDF22 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  10. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.