Council planning record

New hard and soft landscaping for the sculpture court to include removal and replacement of all paving with new waterproofing below, new ramps and steps, new raised planting beds, seating, and lighting, proposed parameters for temporary structures and artworks to facilitate continued use of the sculpture court for art installations, works to the staff spaces facades to upgrade glazing and frames to level 2 and other associated works.

Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

DecidedReference: 26/00612/FULLCity of London Corporation

Last published check: 27 Sept 2026, 21:28. Check the council record for more recent changes.

Application location

Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Planning Permission
Received
27 Apr 2026
Validated
27 Apr 2026
Determination deadline
22 Jun 2026
Local authority
City of London Corporation

Application overview

New hard and soft landscaping for the sculpture court to include removal and replacement of all paving with new waterproofing below, new ramps and steps, new raised planting beds, seating, and lighting, proposed parameters for temporary structures and artworks to facilitate continued use of the sculpture court for art installations, works to the staff spaces facades to upgrade glazing and frames to level 2 and other associated works.

Proposal details

Reference
26/00612/FULL
Alternative references
PP-14856592
Ward
Cripplegate
Agent
The Planning Lab

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 135 of 135

DocumentPublishedAction
Officers ReportOfficers Report · PDF18 Sept 2026View
PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)Decision · PDF18 Sept 2026View
OUTLINE VENUE MANAGEMENT PLANOther · PDF12 Aug 2026View
LEVEL 06- PLAN_AWC MARKUPDrawing · PDF12 Aug 2026View
FROBISHER CRESCENT FACADE SOUTH- BAY STUDY- PROPOSEDDrawing · PDF12 Aug 2026View
IMPACT-RESISTANT WALL + CEILING LUMINAIRES PROTECTION CLASS IP 65Other · PDF12 Aug 2026View
STAFF SPACES FRAME STUDY FOR PLANNING INPUTDrawing · PDF12 Aug 2026View
DRAWING SCHEDULEDrawings Schedule · PDF12 Aug 2026View
HANDLING NOTEOther · PDF10 Aug 2026View
COMMENTS - HISTORIC ENGLANDConsultee Comment · PDF17 Jun 2026View
COMMENTS - THE BUILDING SAFETY REGULATORConsultee Comment · PDF15 Jun 2026View
COMMENTS - CITY OF LONDON CONSERVATION AREA ADVISORY COMMITTEEConsultee Comment · PDF4 Jun 2026View
REPRESENTATION - MICHAEL STEELEPublic Comment · PDF1 Jun 2026View
COMMENTS - THE GARDEN TRUSTConsultee Comment · PDF1 Jun 2026View
REPRESENTATION - FROBISHER CRESCENT HOUSE GROUPPublic Comment · PDF28 May 2026View
FIRE STATEMENT FORMOther · PDF22 May 2026View
COMMENTS - HEALTH AND SAFETY EXECUTIVEConsultee Comment · PDF11 May 2026View
BR SCULPTURE COURT STATEMENT OF COMMUNITY INVOLVEMENT APRIL 2026_COMPRESSEDOther · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART10Report - Design & Access Statement/Report · PDF27 Apr 2026View
EXISTING SITE PLANSite Plan · PDF27 Apr 2026View
EXISTING SITE PLAN WITH LEVELSSite Plan · PDF27 Apr 2026View
STEPS AND ROOFLIGHT SECTIONDrawing · PDF27 Apr 2026View
LEVEL 02- PLAN SOUTHDrawing · PDF27 Apr 2026View
LEVEL 02- RCP NORTHDrawing · PDF27 Apr 2026View
LEVEL 02- RCP SOUTHDrawing · PDF27 Apr 2026View
LEVEL 06- PLANDrawing · PDF27 Apr 2026View
LEVEL 06- RCPDrawing · PDF27 Apr 2026View
BCRP00-AAM-ZZ-SPXX-DR-AR-07000- LOCATION PLAN- LBCSite Plan · PDF27 Apr 2026View
LEVEL 02- PLAN NORTH- PROPOSEDDrawing · PDF27 Apr 2026View
LEVEL 02- PLAN SOUTH- PROPOSEDDrawing · PDF27 Apr 2026View
LEVEL 02- RCP NORTH- PROPOSEDDrawing · PDF27 Apr 2026View
LEVEL 02- RCP SOUTH- PROPOSEDDrawing · PDF27 Apr 2026View
NORTH- TYPICAL INTERNAL ELEVATIONS- PROPOSEDDrawing · PDF27 Apr 2026View
SOUTH- TYPICAL INTERNAL ELEVATIONS- PROPOSEDDrawing · PDF27 Apr 2026View
FROBISHER CRESCENT FACADE ELEVATIONS NORTH- PRODrawing · PDF27 Apr 2026View
FROBISHER CRESCENT FACADE ELEVATIONS SOUTH- PRODrawing · PDF27 Apr 2026View
SILK STREET FACADE EXTERNAL ELEVATIONS- PROPOSEDrawing · PDF27 Apr 2026View
SILK STREET FACADE INTERNAL ELEVATIONS- PROPOSEDrawing · PDF27 Apr 2026View
INTERNAL COURTYARD FACADE ELEVATIONS- PROPOSEDDrawing · PDF27 Apr 2026View
FROBISHER CRESCENT FACADE NORTH- BAY STUDY- PRODrawing · PDF27 Apr 2026View
INTERNAL COURTYARD GLAZING ELEVATIONS- PROPOSEDDrawing · PDF27 Apr 2026View
FROBISHER CRESCENT FACADE ELEVATIONS NORTH- STRDrawing · PDF27 Apr 2026View
FROBISHER CRESCENT FACADE ELEVATIONS SOUTH- STRDrawing · PDF27 Apr 2026View
SILK STREET FACADE AND INTERNAL COURTYARD ELEVADrawing · PDF27 Apr 2026View
LEVEL 06- PLAN- STRIP OUTDrawing · PDF27 Apr 2026View
SCULPTURE COURT VISUAL ARTS MANAGEMENT PLANOther · PDF27 Apr 2026View
OUTLINE VENUE MANAGEMENT PLANOther · PDF27 Apr 2026View
BCRPSS-BHE-ZZ-ZZZZ-RP-FS-0001 - FIRE STATEMENTOther · PDF27 Apr 2026View
BCRPSC-BHE-XX-XXXX-RP-EC-07003 - BIODIVERSITY NET GAIN STATEMENTOther · PDF27 Apr 2026View
BCRPSC-BHE-XX-XXXX-RP-EC-07004 - ECOLOGICAL IMPACT ASSESSMENTOther · PDF27 Apr 2026View
BCRP00-BHE-XX-XXXX-RP-SP-07002 - ENERGY AND SUSTAINABILITY STATEMENTOther · PDF27 Apr 2026View
BCRP00-BHE-XX-XXXX-RP-EE-07002 - LIGHTING (BACK OF HOUSE) REPORTOther · PDF27 Apr 2026View
BCRPSC-BHE-XX-XXXX-RP-IN-07002 - SURFACE WATER DRAINAGE STRATEGY STATEMENTOther · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART1Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART21Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART22Report - Design & Access Statement/Report · PDF27 Apr 2026View
FABRIC REMOVAL PLANDrawing · PDF27 Apr 2026View
PROPOSED SITE PLANSite Plan · PDF27 Apr 2026View
PROPOSED PLANDrawing · PDF27 Apr 2026View
LEVEL 06- PLAN- PROPOSEDDrawing · PDF27 Apr 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF27 Apr 2026View
BARBICAN SCULPTURE COURT AND STAFF SPACES - COL HANDLING NOTEOther · PDF27 Apr 2026View
BARBICAN SCULPTURE COURT AND STAFF SPACES - COVER LETTERCover Letter · PDF27 Apr 2026View
BRP SCULPTURE COURT AND STAFF SPACES - PLANNING STATEMENTReport - Planning Statement/Report · PDF27 Apr 2026View
2026.04.24 BRP SO AND SC CMP - REV01PART-1Other · PDF27 Apr 2026View
2026.04.24 BRP SO AND SC CMP - REV01PART-2Other · PDF27 Apr 2026View
2026.04.24 BRP SO AND SC CMP - REV01PART-3Other · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART2Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART3Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART4Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART11Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART16Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART17Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART18Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART19Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART20Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART23Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART24Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART25Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART26Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART27Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART28Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART29Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART30Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART31Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_LIGHTING STRATEGY_COMPRESSEDOther · PDF27 Apr 2026View
BCRPSC-CHB-ZZ-ZZZZ-RP-AU-07001 BRP SCULPTURE-STAFF - NOISE IMPACT ASSSESSMENT -Report - Acoustic/Noise Report · PDF27 Apr 2026View
2026-04-22 - BARBICAN SCULPTURE COURT AND STAFF SPACES - HERITAGE STATEMENT_COMPAccompanying report · PDF27 Apr 2026View
2026-04-22 - BARBICAN SCULPTURE COURT AND STAFF SPACES - HERITAGE STATEMENT_COMPAccompanying report · PDF27 Apr 2026View
2026-04-22 - BARBICAN SCULPTURE COURT AND STAFF SPACES - HERITAGE STATEMENT_COMPAccompanying report · PDF27 Apr 2026View
2026-04-22 - BARBICAN SCULPTURE COURT AND STAFF SPACES - HERITAGE STATEMENT_COMPAccompanying report · PDF27 Apr 2026View
PROPOSED PLAN WITH LEVELSDrawing · PDF27 Apr 2026View
PROPOSED HARD LANDSCAPE PLANDrawing · PDF27 Apr 2026View
PROPOSED BLUE ROOFS PLANDrawing · PDF27 Apr 2026View
PROPOSED PLANTING STRATEGY PLANDrawing · PDF27 Apr 2026View
2026.04.24 BRP SO AND SC CMP - REV01PART-4Other · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART7Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART8Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART9Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART12Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART13Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART14Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART15Report - Design & Access Statement/Report · PDF27 Apr 2026View
PROPOSED SOIL DEPTH PLANDrawing · PDF27 Apr 2026View
SCULPTURE COURT EXISTING SECTION AA WITH LEVELSDrawing · PDF27 Apr 2026View
SCULPTURE COURT EXISTING SECTION AADrawing · PDF27 Apr 2026View
SCULPTURE COURT EXISTING BB WITH LEVELSDrawing · PDF27 Apr 2026View
SCULPTURE COURT EXISTING BBDrawing · PDF27 Apr 2026View
SCULPTURE COURT PROPOSED SECTION AA WITH LEVELSDrawing · PDF27 Apr 2026View
SCULPTURE COURT PROPOSED SECTION AADrawing · PDF27 Apr 2026View
SCULPTURE COURT PROPOSED SECTION BB WITH LEVELSDrawing · PDF27 Apr 2026View
SCULPTURE COURT PROPOSED SECTION BBDrawing · PDF27 Apr 2026View
PLANTER AND ART GALLERY STEPS SECTIONDrawing · PDF27 Apr 2026View
PLANTER AND SEATING NICHE SECTIONDrawing · PDF27 Apr 2026View
ROOFLIGHT AND PLANTER SECTIONDrawing · PDF27 Apr 2026View
SCULPTURE COURT PARAMETER PLAN - ARTWORKDrawing · PDF27 Apr 2026View
SCULPTURE COURT PARAMETER SECTION 1 - ARTWORKDrawing · PDF27 Apr 2026View
SCULPTURE COURT PARAMETER SECTION 2 - ARTWORKDrawing · PDF27 Apr 2026View
LEVEL 02- PLAN NORTHDrawing · PDF27 Apr 2026View
FROBISHER CRESCENT FACADE ELEVATIONS NORTHDrawing · PDF27 Apr 2026View
FROBISHER CRESCENT FACADE ELEVATIONS SOUTHDrawing · PDF27 Apr 2026View
SILK STREET EXTERNAL FACADE ELEVATIONSDrawing · PDF27 Apr 2026View
SILK STREET INTERNAL FACADE ELEVATIONSDrawing · PDF27 Apr 2026View
INTERNAL COURTYARD FACADE ELEVATIONSDrawing · PDF27 Apr 2026View
INTERNAL COURTYARD GLAZING ELEVATIONSDrawing · PDF27 Apr 2026View
BCRP00-AAM-ZZ-SPXX-DR-AR-07001- LOCATION PLAN- PLANNINGSite Plan · PDF27 Apr 2026View
SITE PLAN- LBCSite Plan · PDF27 Apr 2026View
SITE PLAN - PLANNINGSite Plan · PDF27 Apr 2026View
LEVEL 02- RCP- SOUTH- STRIP OUTDrawing · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART5Report - Design & Access Statement/Report · PDF27 Apr 2026View
BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART6Report - Design & Access Statement/Report · PDF27 Apr 2026View
LEVEL 06-RCP- PROPOSEDDrawing · PDF27 Apr 2026View
LEVEL 02- PLAN- NORTH- STRIP OUTDrawing · PDF27 Apr 2026View
LEVEL 02- PLAN- SOUTH- STRIP OUTDrawing · PDF27 Apr 2026View
LEVEL 02- RCP- NORTH- STRIP OUTDrawing · PDF27 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  6. Last Advertised In Press Date

    Published milestoneCouncil source
  7. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Actual Committee Date

    Published milestoneCouncil source
  13. Decision Issued Date

    Published milestoneCouncil source
  14. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Approved
PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.