Council planning record

Consultation by the London Borough of Tower Hamlets on Variation of Conditions 1 (Method Statement - Approved Documents and Plans), 2 (Scheme Details) and 35 (Temporary Sleeping Accommodation) of planning permission PA/22/01284/S, dated 23/12/2024: Reconfigure internal floor plans. Amended fa�ades and roof profile, including plant equipment, lift overruns and means of escape. Installation of Docklands Light Railway smoke ventilation duct. Re-location of communal amenity space. Changes to housing mix. (LBTH ref: PA/26/00002/S).

Land At Royal Mint St Mansell St And Chamber St, Royal Mint Street, London E1

UnknownReference: 26/00381/OBSCity of London Corporation

Last published check: 28 Sept 2026, 04:52. Check the council record for more recent changes.

Application location

Land At Royal Mint St Mansell St And Chamber St, Royal Mint Street, London E1

This record has no verified map location.

View council map

Application summary

Status
Unknown
Application type
Observations from other Boroughs
Received
10 Mar 2026
Validated
10 Mar 2026
Determination deadline
31 Mar 2026
Local authority
City of London Corporation

Application overview

Consultation by the London Borough of Tower Hamlets on Variation of Conditions 1 (Method Statement - Approved Documents and Plans), 2 (Scheme Details) and 35 (Temporary Sleeping Accommodation) of planning permission PA/22/01284/S, dated 23/12/2024: Reconfigure internal floor plans. Amended fa�ades and roof profile, including plant equipment, lift overruns and means of escape. Installation of Docklands Light Railway smoke ventilation duct. Re-location of communal amenity space. Changes to housing mix. (LBTH ref: PA/26/00002/S).

Proposal details

Reference
26/00381/OBS
Ward
Tower

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 2 of 2

DocumentPublishedAction
OBSERVATIONS TO A NEIGHBOURING PLANNING AUTHORITYDecision · PDF7 Apr 2026View
APPLICATION EMAILApplication Form · PDF16 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Actual Committee Date

    Published milestoneCouncil source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

No Objections to OBS
OBSERVATIONS TO A NEIGHBOURING PLANNING AUTHORITY
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.