Awaiting decisionCouncil status: Under Consideration

Submission of (a) accommodate the location of the existing London Underground structures and tunnels and assess any structural impact due to the proposed works; (b) provide detailed design and Risk Assessment Method Statement for all demolition, temporary and permanent works; (c) provide detailed design and Risk Assessment Method Statement on the use of tall plant/scaffolding/lifting equipment; (d) demonstrate that there will at no time be any potential security risk to our railway, property or structures; (e) mitigate the effects of noise arising from the proposed works on LU assets; and (f) no works to commence on any part of TfL/LU Property or in it's airspace until any agreements required with TfL Engineering, TfL Property or TfL Legal have been agreed and signed by all parties pursuant to condition 5 of planning permission 24/00155/FULL dated 02/07/2024.

42 - 43 Charterhouse Square London EC1M 6EW

City of London CorporationReference 26/00008/MDCSubmission of details (Planning)

Last published check: 20 Nov 2026, 19:21. Check the council record for more recent changes.

Status and dates

Last published check: 20 Nov 2026, 19:21 (UK)

269days past target decision date2 Mar 2026 · decision not yet published

  1. DoneReceived5 Jan 2026
  2. DoneValidated5 Jan 2026
  3. Not publishedConsultationNo date on council record
  4. Overdue · 269 daysTarget decision date2 Mar 2026
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (7)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Submission of details (Planning)
Ward
Farringdon Within
Documents
14 published

Proposal

Submission of (a) accommodate the location of the existing London Underground structures and tunnels and assess any structural impact due to the proposed works; (b) provide detailed design and Risk Assessment Method Statement for all demolition, temporary and permanent works; (c) provide detailed design and Risk Assessment Method Statement on the use of tall plant/scaffolding/lifting equipment; (d) demonstrate that there will at no time be any potential security risk to our railway, property or structures; (e) mitigate the effects of noise arising from the proposed works on LU assets; and (f) no works to commence on any part of TfL/LU Property or in it's airspace until any agreements required with TfL Engineering, TfL Property or TfL Legal have been agreed and signed by all parties pursuant to condition 5 of planning permission 24/00155/FULL dated 02/07/2024.

Reference
26/00008/MDC
Alternative references
PP-14600345
Ward
Farringdon Within
Agent
Etchingham Architecture Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • COMMENTS - LONDON UNDERGROUNDConsultee Comment22 Jan 2026View
  • SCAFFOLD ERECTION MJH SIGNEDOther21 Jan 2026View
  • LONDON UNDERGROUNDConsultee Comment6 Jan 2026View
  • APPLICATIONFORMREDACTEDApplication Form5 Jan 2026View
  • APPROVED ISLINGTON OUT OF HOURS STREETWORKS REQUESTOther5 Jan 2026View
  • APPROVED SITE HOURS VARIATION REQUESTOther5 Jan 2026View
  • CITY OF LONDON AIP25_0016 ACCEPTANCEOther5 Jan 2026View
  • DESIGN CHECK CERTIFICATE - FRONTOther5 Jan 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.