Internal refurbishment works to the Library, comprising:a) Removal and storage of original joinery items to Children's Libraryb) Removal of non-original joinery and floor finishesc) Alterations to original bookshelvesd) Additional joinery to complement existinge) Installation of new mesh security screen and door access controlsf) Additional power provision and cabinetg) Alterations to signageh) Alterations to non-original lighting built into joineryi) New floor finishes throughout public areas of the Library
Library Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Internal refurbishment works to the Library, comprising:a) Removal and storage of original joinery items to Children's Libraryb) Removal of non-original joinery and floor finishesc) Alterations to original bookshelvesd) Additional joinery to complement existinge) Installation of new mesh security screen and door access controlsf) Additional power provision and cabinetg) Alterations to signageh) Alterations to non-original lighting built into joineryi) New floor finishes throughout public areas of the Library
Reference
25/01774/LBC
Alternative references
PP-14558737
Ward
Cripplegate
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.