ApprovedCouncil status: Decided

Partial discharge of Schedule 3 requirements relating to details of works to listed buildings for small clips to be installed onto each Lions heads piers to hold back the ring to the Lions Head moorings at the Blackfriars Bridge Foreshore Worksite pursuant to BLABF 11 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

City of London CorporationReference 25/01500/TTTThames Tideway Tunnel

Last published check: 12 Nov 2026, 04:49. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 12 Nov 2026, 04:49 (UK)

  1. DoneReceived31 Oct 2025
  2. DoneValidated31 Oct 2025
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date26 Dec 2025
  5. DecidedApproved27 Feb 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (10)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Actual Committee Date

    Published milestoneCouncil source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
Application type
Thames Tideway Tunnel
Ward
Castle Baynard
Documents
7 published

Proposal

Partial discharge of Schedule 3 requirements relating to details of works to listed buildings for small clips to be installed onto each Lions heads piers to hold back the ring to the Lions Head moorings at the Blackfriars Bridge Foreshore Worksite pursuant to BLABF 11 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

Reference
25/01500/TTT
Alternative references
PP-14391468
Ward
Castle Baynard
Agent
Ferrovial Agroman Laing O'Rourke Joint Venture (FLo)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Officers ReportOfficers Report27 Feb 2026View
  • APPROVAL OF SUBMISSION UNDER SCHEDULE 3 OF ARTICLE 3 OF THE ABOVE ORDERDecision27 Feb 2026View
  • HISTORIC ENGLAND COMMENTSConsultee Comment6 Jan 2026View
  • APPLICATIONFORMREDACTEDApplication Form31 Oct 2025View
  • BLABF 11 12 13 KINGS PLAQUE JULY 2025Cover Letter31 Oct 2025View
  • PLANNING STATEMENT_INCLUDED_IN_COVERING LETTERReport - Planning Statement/Report31 Oct 2025View
  • LIONS HEAD MOORING RING RESTRINAT BRACKETDrawing31 Oct 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
APPROVAL OF SUBMISSION UNDER SCHEDULE 3 OF ARTICLE 3 OF THE ABOVE ORDER
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.