Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Scottish Provident Building 1 - 6 Lombard Street London EC3V 9AA
Last published check: 28 Sept 2026, 15:38. Check the council record for more recent changes.
Scottish Provident Building 1 - 6 Lombard Street London EC3V 9AA
This record has no verified map location.
View council mapThe installation and display of: (i) 1x externally illuminated projecting sign measuring 0.93m in width, 0.415m high and at height of 2.75m above ground level; (ii) 1x non-illuminated fascia sign measuring 1.560m in width, 0.280m high and at a height of 4.080m above ground level; (iii) 1x non-illuminated fascia sign measuring 2.685m in width, 0.6m high and at a height of 3.82m above ground level; (iv) 1x internally illuminated menu box measuring 0.42m in width, 0.64m high and at a height of 1.425m above ground level; (v) 1x non-illuminated Edmondo brass plaque measuring 0.395m in width, 0.23m high, and at a height of 1.27m above ground level; and (vi) 1x non-illuminated No. 6 brass plaque measuring 0.395m in width, 0.23m high and at a height of 1.27m above ground level.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Officers ReportOfficers Report · PDF | 19 Aug 2026 | View |
| CONSENT TO DISPLAY AN ADVERTISEMENTDecision · PDF | 19 Aug 2026 | View |
| EXISTING AND PROPOSED GROUND FLOORDrawing · PDF | 13 Aug 2026 | View |
| PHOTO OF EXISTING LIGHTING IN PLANTERSPhotograph · PDF | 13 Aug 2026 | View |
| REV A - PROPOSED ENTRANCEDrawing · PDF | 4 Aug 2026 | View |
| SITE PLANDrawing · PDF | 4 Aug 2026 | View |
| REV C - EXISTING AND PROPOSED FACADE ELEVATIONSDrawing · PDF | 4 Aug 2026 | View |
| REV B - SHOPFRONT AND FACADE SIGNAGE DETAILSDrawing · PDF | 4 Aug 2026 | View |
| REV B - EXISTING AND PROPOSED FACADE ELEVATIONSAccompanying letters · PDF | 4 Aug 2026 | View |
| CAAC LETTERPublic Comment · PDF | 21 Nov 2025 | View |
| CIL FORMOther · PDF | 10 Oct 2025 | View |
| CIL FORMOther · PDF | 10 Oct 2025 | View |
| PLANNING HERITAGE DESIGN AND ACCESS STATEMENTReport - Design & Access Statement/Report · PDF | 10 Oct 2025 | View |
| SUPERSEDED SHOPFRONT AND FACADE SIGNAGE DETAILSSuperseded drawing · PDF | 10 Oct 2025 | View |
| SUPERSEDED PROPOSED ENTRANCESuperseded drawing · PDF | 10 Oct 2025 | View |
| SUPERSEDED SHOPFRONT AND FACADE ELEVATIONSSuperseded drawing · PDF | 10 Oct 2025 | View |
| SUPERSEDED SHOPFRONT AND FACADE ELEVATIONSSuperseded drawing · PDF | 10 Oct 2025 | View |
| SUPERSEDED EXISTING AND PROPOSED FLOOR PLANSuperseded drawing · PDF | 10 Oct 2025 | View |
| APPLICATION FORM REDACTEDApplication Form · PDF | 10 Oct 2025 | View |
| SUPERSEDED EXISTING AND PROPOSED SITE PLANSuperseded drawing · PDF | 10 Oct 2025 | View |
| APPLICATIONFORMREDACTEDApplication Form · PDF | 10 Oct 2025 | View |
| SUPERSEDED 2403-200.1 EXISTING AND PROPOSED SITE PLANSuperseded drawing · PDF | 10 Oct 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.