Council planning record

An application submitted under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 26 (revolving door), condition 31 (Cycle parking), condition 34 (End of Trip Facilities), Condition 44 (Waste Storage), Condition 45 (Approved Floor Space), Condition 46 (Access Management Plan) and condition 47 (Approved Plans) of planning permission 24/00126/FULMAJ dated 27 February 2025 to incorporate minor material amendments comprising: (i) alterations to the ground floor and public realm; (ii) insertion of a drum door entrance; (iii) alterations to the Nicholas Lane entrance, (iv) alterations to the loading bay arrangement; (v) alterations to the Gatehouse, (vi) alterations to the massing and upper floors including revised fa�ade articulation; (vii) revised roof terrace access and planter access; and (viii) all associated works.

21 Lombard Street London EC3V 9AH

Under ConsiderationReference: 25/01111/FULMAJCity of London Corporation

Last published check: 28 Sept 2026, 05:11. Check the council record for more recent changes.

Application location

21 Lombard Street London EC3V 9AH

This record has no verified map location.

View council map

Application summary

Status
Under Consideration
Application type
Full Major Application
Received
14 Aug 2025
Validated
14 Aug 2025
Determination deadline
13 Nov 2025
Local authority
City of London Corporation

Application overview

An application submitted under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 26 (revolving door), condition 31 (Cycle parking), condition 34 (End of Trip Facilities), Condition 44 (Waste Storage), Condition 45 (Approved Floor Space), Condition 46 (Access Management Plan) and condition 47 (Approved Plans) of planning permission 24/00126/FULMAJ dated 27 February 2025 to incorporate minor material amendments comprising: (i) alterations to the ground floor and public realm; (ii) insertion of a drum door entrance; (iii) alterations to the Nicholas Lane entrance, (iv) alterations to the loading bay arrangement; (v) alterations to the Gatehouse, (vi) alterations to the massing and upper floors including revised fa�ade articulation; (vii) revised roof terrace access and planter access; and (viii) all associated works.

Proposal details

Reference
25/01111/FULMAJ
Alternative references
PP-14103115
Ward
Candlewick
Agent
Newmark

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 169 of 169

DocumentPublishedAction
DRAFT DEED OF VARIATIONOther · PDF22 Sept 2026View
GLA_CARBON_EMISSION_REPORTING_SPREADSHEET_V2.0_0 - EXISTING COMPARISONOther · PDF15 Jan 2026View
CONSTRUCTION LOGISTICS TECHNICAL NOTEOther · PDF12 Jan 2026View
SPREADSHEET - GLA CARBON EMISSION REPORTING SPREADSHEET - EXISTING COMPARISONOther17 Dec 2025View
BASEMENT 1 PROPOSED GENERAL ARRANGEMENT PLANDrawing · PDF17 Dec 2025View
GROUND FLOOR PROPOSED GENERAL ARRANGEMENT PLAN-REV 5Drawing · PDF9 Dec 2025View
PROPOSED GENERAL ARRANGEMENT SECTION AA - REV 4Drawing · PDF9 Dec 2025View
PROPOSED GENERAL ARRANGEMENT SECTION AA - REV 4Drawing · PDF9 Dec 2025View
COMMENTS - CAAC LETTERConsultee Comment · PDF11 Oct 2025View
COMMENTS - AIR QUALITYConsultee Comment · PDF24 Sept 2025View
AMENDED ELEVATIONSDrawing · PDF22 Sept 2025View
AMENDMENTS ELEVATIONSSuperseded drawing · PDF18 Sept 2025View
COMMENTS - LONDON UNDERGROUNDPublic Comment · PDF16 Sept 2025View
COMMENTS - GATWICK AIRPORTConsultee Comment · PDF11 Sept 2025View
COMMENTS - HISTORIC ENGLANDConsultee Comment · PDF11 Sept 2025View
MARKED UP COMPARISON BETWEEN APPROVED AND PROPOSED DRAWINGSDrawing · PDF5 Sept 2025View
COMMENTS-HISTORIC ENGLANDConsultee Comment · PDF4 Sept 2025View
COMMENTS-LONDON CITY AIRPORTConsultee Comment · PDF4 Sept 2025View
COMMENTS - ACTIVE TRAVELConsultee Comment · PDF3 Sept 2025View
COMMENTS-HEATHROW SAFEGUARDINGConsultee Comment · PDF3 Sept 2025View
COMMENTS - NATSConsultee Comment · PDF2 Sept 2025View
WLCA GLA TEMPLATEOther · PDF19 Aug 2025View
APPLICATIONFORMREDACTEDApplication Form · PDF14 Aug 2025View
ACOUSTIC ASSESSMENTReport - Acoustic/Noise Report · PDF14 Aug 2025View
AIR QUALITY IMPACT ASSESSMENTAccompanying report · PDF14 Aug 2025View
ARCHAEOLOGICAL DESK-BASED ASSESSMENT_1Accompanying report · PDF14 Aug 2025View
ARCHAEOLOGICAL DESK-BASED ASSESSMENT_2Accompanying report · PDF14 Aug 2025View
DAYLIGHT AND SUNLIGHT AND OVERSHADOWINGReport - Daylight/Sunlight Report · PDF14 Aug 2025View
21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART6Report - Design & Access Statement/Report · PDF14 Aug 2025View
AREA SCHEDULEOther · PDF14 Aug 2025View
CIRCULAR ECONOMY STATEMENTOther · PDF14 Aug 2025View
21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART7Report - Design & Access Statement/Report · PDF14 Aug 2025View
21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART8Report - Design & Access Statement/Report · PDF14 Aug 2025View
21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART9Report - Design & Access Statement/Report · PDF14 Aug 2025View
21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART1Report - Design & Access Statement/Report · PDF14 Aug 2025View
21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART2Report - Design & Access Statement/Report · PDF14 Aug 2025View
21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART3Report - Design & Access Statement/Report · PDF14 Aug 2025View
21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART4Report - Design & Access Statement/Report · PDF14 Aug 2025View
21 LOMBARD STREET DESIGN AND ACCESS STATEMENT_PART5Report - Design & Access Statement/Report · PDF14 Aug 2025View
ECOLOGY REPORTAccompanying report · PDF14 Aug 2025View
FLOOD RISK ASSESSMENT AND SUDS STRATEGY_2Accompanying report · PDF14 Aug 2025View
FLOOD RISK ASSESSMENT AND SUDS STRATEGY_3Accompanying report · PDF14 Aug 2025View
HERITAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT ADDENDUM_1Accompanying report · PDF14 Aug 2025View
HERITAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT ADDENDUM_2Accompanying report · PDF14 Aug 2025View
ENERGY STRATEGY AND SUSTAINABILITY STATEMENT_1Accompanying report · PDF14 Aug 2025View
ENERGY STRATEGY AND SUSTAINABILITY STATEMENT_2Accompanying report · PDF14 Aug 2025View
ENERGY STRATEGY AND SUSTAINABILITY STATEMENT_3Accompanying report · PDF14 Aug 2025View
21 LS - SECTION 73 - TOWN PLANNING STATEMENTReport - Planning Statement/Report · PDF14 Aug 2025View
250704_TRANSPORT ASSESSMENT_2.0 ALL APPENDICES_PART1Report - Transport Statement/Report · PDF14 Aug 2025View
250704_TRANSPORT ASSESSMENT_2.0 ALL APPENDICES_PART3Report - Transport Statement/Report · PDF14 Aug 2025View
250707_TRANSPORT ASSESSMENT_2.0 ALL APPENDICES_PART2Report - Transport Statement/Report · PDF14 Aug 2025View
WHOLE LIFE CYCLE CARBON ASSESSMENTOther · PDF14 Aug 2025View
WLCA GLA TEMPLATEOther14 Aug 2025View
AS APPROVED LEVEL 04 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
AS APPROVED LEVEL 04 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
AS APPROVED LEVEL 05 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
AS APPROVED - LEVEL 05 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
AS APPROVED LEVEL 06 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
AS APPROVED LEVEL 06 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
AS APPROVED LEVEL 07 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
AS APPROVED - DEMOLITION GENERAL ARRANGEMENT WEST ELEVATION - RDrawing · PDF14 Aug 2025View
AS APPROVED - BASEMENT 2 PROPOSED GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
AS APPROVED - BASEMENT 3 DEMOLITION GENERAL ARRANGEMENT PLAN -Drawing · PDF14 Aug 2025View
AS APPROVED - BASEMENT 3 PROPOSED GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
AS APPROVED - GROUND FLOOR DEMOLITION GENERAL ARRANGEMENT PLANDrawing · PDF14 Aug 2025View
AS APPROVED - GROUND FLOOR PROPOSED GENERAL ARRANGEMENT PLAN -Drawing · PDF14 Aug 2025View
AS APPROVED - GENERAL ARRANGEMENT DEMOLITION ROOF PLAN - REV 3Drawing · PDF14 Aug 2025View
AS APPROVED -ROOF PROPOSED GENERAL ARRANGEMENT PLAN - REV 3Drawing · PDF14 Aug 2025View
AS APPROVED - PROPOSED GENERAL ARRANGEMENT NORTH ELEVATION - REDrawing · PDF14 Aug 2025View
AS APPROVED - PROPOSED GENERAL ARRANGEMENT SOUTH ELEVATION - REDrawing · PDF14 Aug 2025View
AS APPROVED - PROPOSED GENERAL ARRANGEMENT EAST ELEVATION - REVDrawing · PDF14 Aug 2025View
AS APPROVED - PROPOSED GENERAL ARRANGEMENT WEST ELEVATION - REVDrawing · PDF14 Aug 2025View
AS APPROVED - PROPOSED GENERAL ARRANGEMENT SECTION AA - REV 3Drawing · PDF14 Aug 2025View
AS APPROVED - PROPOSED GENERAL ARRANGEMENT SECTION BB CC - REVDrawing · PDF14 Aug 2025View
AS APPROVED - DEMOLITION GENERAL ARRANGEMENT NORTH ELEVATION -Drawing · PDF14 Aug 2025View
AS APPROVED - DEMOLITION GENERAL ARRANGEMENT SOUTH ELEVATION -Drawing · PDF14 Aug 2025View
AS APPROVED - DEMOLITION GENERAL ARRANGEMENT EAST ELEVATION - RDrawing · PDF14 Aug 2025View
DEMOLITION GENERAL ARRANGEMENT EAST ELEVATION - RDrawing · PDF14 Aug 2025View
DEMOLITION GENERAL ARRANGEMENT SOUTH ELEVATION -Drawing · PDF14 Aug 2025View
DEMOLITION GENERAL ARRANGEMENT WEST ELEVATION - RDrawing · PDF14 Aug 2025View
DEMOLITION GENERAL ARRANGEMENT NORTH ELEVATION -Drawing · PDF14 Aug 2025View
LEVEL 07 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
LEVEL 08 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
BASEMENT 1 DEMOLITION GENERAL ARRANGEMENT PLAN -Drawing · PDF14 Aug 2025View
BASEMENT 2 DEMOLITION GENERAL ARRANGEMENT PLAN -Drawing · PDF14 Aug 2025View
BASEMENT 3 DEMOLITION GENERAL ARRANGEMENT PLAN -Drawing · PDF14 Aug 2025View
GROUND FLOOR DEMOLITION GENERAL ARRANGEMENT PLANDrawing · PDF14 Aug 2025View
GENERAL ARRANGEMENT DEMOLITION ROOF PLAN - REV 4Drawing · PDF14 Aug 2025View
LEVEL 01 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
LEVEL 02 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
LEVEL 03 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
LEVEL 04 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
LEVEL 05 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
LEVEL 06 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
EXISTING GENERAL ARRANGEMENT NORTH ELEVATION - REDrawing · PDF14 Aug 2025View
EXISTING GENERAL ARRANGEMENT SOUTH ELEVATION - REDrawing · PDF14 Aug 2025View
EXISTING GENERAL ARRANGEMENT EAST ELEVATION - REVDrawing · PDF14 Aug 2025View
EXISTING GENERAL ARRANGEMENT WEST ELEVATION - REVDrawing · PDF14 Aug 2025View
LEVEL 01 EXISTING GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 02 EXISTING GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 03 EXISTING GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
EXTERNAL LIGHTING IMPACT ASSESSMENTAccompanying report · PDF14 Aug 2025View
OUTLINE FIRE SAFETY STRATEGY REPORTAccompanying report · PDF14 Aug 2025View
FLOOD RISK ASSESSMENT AND SUDS STRATEGY_1Accompanying report · PDF14 Aug 2025View
WIND MICROCLIMATE IMPACT ASSESSMENTOther · PDF14 Aug 2025View
AS APPROVED - LEVEL 07 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
AS APPROVED LEVEL 08 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
AS APPROVED - LEVEL 08 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
AS APPROVED - LEVEL 09 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
AS APPROVED - LEVEL 10 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
AS APPROVED - LEVEL 11 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
AS APPROVED - LEVEL 01 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
AS APPROVED -LEVEL 01 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
AS APPROVED -LEVEL 02 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
AS APPROVED LEVEL 02 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
AS APPROVED - LEVEL 03 DEMOLITION GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
AS APPROVED - LEVEL 03 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
AS APPROVED - SITE LOCATION PLAN - REV 3Site Plan · PDF14 Aug 2025View
AS APPROVED - PROPOSED SITE PLAN - REV 3Site Plan · PDF14 Aug 2025View
AS APPROVED - PROPOSED TYPICAL BAY DETAIL - REV 0Drawing · PDF14 Aug 2025View
AS APPROVED - RETAINED CURTAIN WALL DETAIL - REV 0Drawing · PDF14 Aug 2025View
AS APPROVED - PROPOSED FLOOR BAY DETAIL - REV 0Drawing · PDF14 Aug 2025View
AS APPROVED - PROPOSED GATEHOUSE DETAIL - REV 0Drawing · PDF14 Aug 2025View
AS APPROVED - BASEMENT 1 DEMOLITION GENERAL ARRANGEMENT PLAN -Drawing · PDF14 Aug 2025View
AS APPROVED - BASEMENT 1 PROPOSED GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
AS APPROVED - BASEMENT 2 DEMOLITION GENERAL ARRANGEMENT PLAN -Drawing · PDF14 Aug 2025View
LEVEL 04 EXISTING GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 05 EXISTING GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 06 EXISTING GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 07 EXISTING GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 08 EXISTING GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
BASEMENT 1 EXISTING GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
BASEMENT 2 EXISTING GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
BASEMENT 3 EXISTING GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
GROUND FLOOR EXISTING GENERAL ARRANGEMENT PLAN -Drawing · PDF14 Aug 2025View
EXISTING GENERAL ARRANGEMENT ROOF PLAN - REV 4Drawing · PDF14 Aug 2025View
EXISTING SITE PLAN - REV 4Drawing · PDF14 Aug 2025View
PROPOSED GATEHOUSE DETAIL - REV 1Drawing · PDF14 Aug 2025View
PROPOSED GENERAL ARRANGEMENT NORTH ELEVATION - REDrawing · PDF14 Aug 2025View
PROPOSED GENERAL ARRANGEMENT SOUTH ELEVATION - REDrawing · PDF14 Aug 2025View
PROPOSED GENERAL ARRANGEMENT EAST ELEVATION - REVDrawing · PDF14 Aug 2025View
PROPOSED GENERAL ARRANGEMENT WEST ELEVATION - REVDrawing · PDF14 Aug 2025View
LEVEL 06 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 07 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 08 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 09 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 10 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 11 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
SUPERSEDED BASEMENT 1 PROPOSED GENERAL ARRANGEMENT PLAN - RESuperseded drawing · PDF14 Aug 2025View
BASEMENT 2 PROPOSED GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
BASEMENT 3 PROPOSED GENERAL ARRANGEMENT PLAN - REDrawing · PDF14 Aug 2025View
SUPERSEDED GROUND FLOOR PROPOSED GENERAL ARRANGEMENT PLAN -Superseded drawing · PDF14 Aug 2025View
ROOF PROPOSED GENERAL ARRANGEMENT PLAN - REV 4Drawing · PDF14 Aug 2025View
440888-WBA-ZZ-ZZ-DR-AR-11001 - SITE LOCATION PLAN - REV 4Site Plan · PDF14 Aug 2025View
PROPOSED SITE PLAN - REV 4Site Plan · PDF14 Aug 2025View
LEVEL 01 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 02 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 03 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
LEVEL 04 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
SUPERSEDED PROPOSED GENERAL ARRANGEMENT SECTION AA - REV 4Superseded drawing · PDF14 Aug 2025View
250704_DRAWING REGISTER V4Drawings Schedule · PDF14 Aug 2025View
RETAINED CURTAIN WALL DETAIL - REV 1Drawing · PDF14 Aug 2025View
PROPOSED FLOOR BAY DETAIL - REV 1Drawing · PDF14 Aug 2025View
PROPOSED TYPICAL BAY DETAIL - REV 1Drawing · PDF14 Aug 2025View
21LS - SECTION 73 - COMMUNITY INFRASTRUCTURE LEVY FORM - 15 JULY 2025Other · PDF14 Aug 2025View
LEVEL 05 PROPOSED GENERAL ARRANGEMENT PLAN - REVDrawing · PDF14 Aug 2025View
21 LS - SECTION 73 - COVER LETTERCover Letter · PDF14 Aug 2025View
PROPOSED GENERAL ARRANGEMENT SECTION BB CC - REVDrawing · PDF14 Aug 2025View
PRELIMINARY ECOLOGICAL APPRAISALAccompanying report · PDF30 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Actual Committee Date

    Published milestoneCouncil source

Decision & conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.