Council planning record
65 Gresham Street London EC2V 7NQ
Last published check: 27 Sept 2026, 16:13. Check the council record for more recent changes.
65 Gresham Street London EC2V 7NQ
This record has no verified map location.
View council mapSubmission of drawings pursuant to discharge of condition 13(a) Fully detailed design and layout drawings for the proposed SuDS components including but not limited to: brown roofs, attenuation systems, rainwater pipework, flow control devices, design for system exceedance, design for ongoing maintenance; surface water flow rates shall be restricted to no greater than 13.2 l/s, provision should be made for an attenuation volume capacity capable of achieving this, which should be no less than 263m3 of planning permission 22/00848/FULMAJ dated 21.12.2023.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Officers ReportOfficers Report · PDF | 24 Sept 2025 | View |
| APPROVAL OF SUBMISSION OF DETAILSDecision · PDF | 24 Sept 2025 | View |
| APPLICATIONFORMREDACTEDApplication Form · PDF | 8 Aug 2025 | View |
| PUBLIC HEALTH SERVICES RAINWATER DRAINAGE SCHEMATICDrawing · PDF | 8 Aug 2025 | View |
| SOFTSCAPE TYPICAL DETAILS 02/02Drawing · PDF | 8 Aug 2025 | View |
| LEVEL 12 PLANTING PLANDrawing · PDF | 8 Aug 2025 | View |
| LEVEL 13 PLANTING PLANDrawing · PDF | 8 Aug 2025 | View |
| LEVEL 2-7 PLANTING PLANSDrawing · PDF | 8 Aug 2025 | View |
| SOFTSCAPE TYPICAL DETAILS 01/02Drawing · PDF | 8 Aug 2025 | View |
| PLANTING SCHEDULEOther · PDF | 8 Aug 2025 | View |
| CONDITION 13A COVER LETTERCover Letter · PDF | 8 Aug 2025 | View |
| 250804 65GS SYSTEM EXCEEDANCE DESIGN NOTEOther · PDF | 8 Aug 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.