Council planning record

Refurbishment and extension of the existing building including: (i) removal of the BMU; (ii) reconfiguration of the sixth floor plant and enclosure to provide an extension in the form of a rooftop pavilion, external amenity space and associated balustrading; (iii) extension of the lifts to sixth floor level; (iv) installation of green roof at sixth floor level; (v) installation of PV panels at seventh floor level; (vi) facade alterations including installation of vents within existing windows, a revised building entrance on Queen Street, and installation of a gantry rail; (vii) provision of cycle parking, end of trip facilities, and wellbeing space; and associated works.

The Rex Building 62 Queen Street London EC4R 1EB

DecidedReference: 25/00987/FULLCity of London Corporation

Last published check: 28 Sept 2026, 00:05. Check the council record for more recent changes.

Application location

The Rex Building 62 Queen Street London EC4R 1EB

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Planning Permission
Received
25 Jul 2025
Validated
25 Jul 2025
Determination deadline
19 Sept 2025
Local authority
City of London Corporation

Application overview

Refurbishment and extension of the existing building including: (i) removal of the BMU; (ii) reconfiguration of the sixth floor plant and enclosure to provide an extension in the form of a rooftop pavilion, external amenity space and associated balustrading; (iii) extension of the lifts to sixth floor level; (iv) installation of green roof at sixth floor level; (v) installation of PV panels at seventh floor level; (vi) facade alterations including installation of vents within existing windows, a revised building entrance on Queen Street, and installation of a gantry rail; (vii) provision of cycle parking, end of trip facilities, and wellbeing space; and associated works.

Proposal details

Reference
25/00987/FULL
Alternative references
PP-14053980
Ward
Vintry
Agent
Newmark

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 61 of 61

DocumentPublishedAction
Officers ReportOfficers Report · PDF11 Dec 2025View
PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)Decision · PDF11 Dec 2025View
RESPONSE TO ST PAUL'S HEIGHTS POLICYAccompanying letters · PDF14 Oct 2025View
COMMENTS - WESTMINSTER CITY COUNCILConsultee Comment · PDF2 Oct 2025View
COMMENTS - SURVEYOR TO THE FABRIC OF ST PAUL?S CATHEDRALConsultee Comment · PDF1 Oct 2025View
COMMENTS - ROYAL BOROUGH OF GREENWICHConsultee Comment · PDF15 Sept 2025View
COMMENTS - SOUTHWARK COUNCILConsultee Comment · PDF11 Sept 2025View
COMMENTS - CAMDENConsultee Comment · PDF4 Sept 2025View
ACKNOWLEDGMENT LETTER WESTMINSTERConsultee Comment · PDF27 Aug 2025View
20658-SBR-RX-XX-RP-A-80001 DESIGN ACCESS STATEMENT REVP02_COMPRESSED_PART2Report - Design & Access Statement/Report · PDF25 Jul 2025View
20658-SBR-RX-XX-RP-A-80001 DESIGN ACCESS STATEMENT REVP02_COMPRESSED_PART3Report - Design & Access Statement/Report · PDF25 Jul 2025View
20658-SBR-RX-XX-RP-A-80001 DESIGN ACCESS STATEMENT REVP02_COMPRESSED_PART4Report - Design & Access Statement/Report · PDF25 Jul 2025View
20658-SBR-RX-XX-RP-A-80001 DESIGN ACCESS STATEMENT REVP02_COMPRESSED_PART5Report - Design & Access Statement/Report · PDF25 Jul 2025View
20658-SBR-RX-XX-RP-A-80001 DESIGN ACCESS STATEMENT REVP02_COMPRESSED_PART6Report - Design & Access Statement/Report · PDF25 Jul 2025View
20658-SBR-RX-XX-RP-A-80001 DESIGN ACCESS STATEMENT REVP02_COMPRESSED_PART7Report - Design & Access Statement/Report · PDF25 Jul 2025View
20658-SBR-RX-XX-RP-A-80001 DESIGN ACCESS STATEMENT REVP02_COMPRESSED_PART8Report - Design & Access Statement/Report · PDF25 Jul 2025View
20658-SBR-RX-XX-RP-A-80001 DESIGN ACCESS STATEMENT REVP02_COMPRESSED_PART1Report - Design & Access Statement/Report · PDF25 Jul 2025View
DAYLIGHT AND SUNLIGHT ASSESSMENTReport - Daylight/Sunlight Report · PDF25 Jul 2025View
EXISTING THIRD FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
PROPOSED THIRD FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
EXISTING FOURTH FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
PROPOSED FOURTH FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
EXISTING FIFTH FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
PROPOSED PART ELEVATION - MAIN ENTRANCE REVP01Drawing · PDF25 Jul 2025View
PROPOSED GA SECTION REVP01Drawing · PDF25 Jul 2025View
EXISTING GROUND FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
PROPOSED GROUND FLOOR GA PLAN REVP01Drawing · PDF25 Jul 2025View
EXISTING FIRST FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
PROPOSED FIRST FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
EXISTING SECOND FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
PROPOSED SECOND FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
PLANNING STATEMENT FINALReport - Planning Statement/Report · PDF25 Jul 2025View
THE REX_ THVIA_16JULY2025_PART2Accompanying report · PDF25 Jul 2025View
20658-SBR-ZZ-ZZ-DR-A-80002 SITE BLOCK PLAN REVP01Site Plan · PDF25 Jul 2025View
20658-SBR-ZZ-ZZ-DR-A-80001 SITE LOCATION PLAN - 3D RED LINE BOUNDARY REVP01Site Plan · PDF25 Jul 2025View
APPLICATIONFORMREDACTEDApplication Form · PDF25 Jul 2025View
NOISE IMPACT ASSESSMENTReport - Acoustic/Noise Report · PDF25 Jul 2025View
CIL ADDITIONAL INFORMATION FORMOther · PDF25 Jul 2025View
250716 COVER LETTERCover Letter · PDF25 Jul 2025View
PROPOSED FIFTH FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
EXISTING SIXTH FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
PROPOSED SIXTH FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
EXISTING BASEMENT FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
PROPOSED BASEMENT FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
END OF JOURNEY - SHOWER PROVISION REVP01Drawing · PDF25 Jul 2025View
END OF JOURNEY - CYCLE PROVISION REVP01Drawing · PDF25 Jul 2025View
EXISTING ROOF PLAN REVP01Drawing · PDF25 Jul 2025View
PROPOSED ROOF FLOOR PLAN REVP01Drawing · PDF25 Jul 2025View
EXISTING PROPOSED WINDOW COMPARISONS - SHEET 1 REVP01Drawing · PDF25 Jul 2025View
EXISTING PROPOSED WINDOW COMPARISONS - SHEET 2 REVP01Drawing · PDF25 Jul 2025View
EXISTING PROPOSED WINDOW COMPARISONS - SHEET 3 REVP01Drawing · PDF25 Jul 2025View
EXISTING ELEVATION 01 REVP01Drawing · PDF25 Jul 2025View
EXISTING ELEVATION 02 REVP01Drawing · PDF25 Jul 2025View
EXISTING ELEVATION 03 REVP01Drawing · PDF25 Jul 2025View
EXISTING ELEVATION 04 REVP01Drawing · PDF25 Jul 2025View
EXISTING GA SECTION REVP01Drawing · PDF25 Jul 2025View
PROPOSED ELEVATION 01 REVP01Drawing · PDF25 Jul 2025View
PROPOSED ELEVATION 02 REVP01Drawing · PDF25 Jul 2025View
PROPOSED ELEVATION 03 REVP01Drawing · PDF25 Jul 2025View
PROPOSED ELEVATION 04 REVP01Drawing · PDF25 Jul 2025View
PROPOSED PART ELEVATION - PAVILLION REVP01Drawing · PDF25 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  7. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Actual Committee Date

    Published milestoneCouncil source
  13. Decision Issued Date

    Published milestoneCouncil source
  14. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Approved
PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.