Council planning record

Works comprising: Conservatory Exterior; replacement of glazing, new louvres, works to frame; enclosure of walkways; new workshop, new planter beds; vents to art gallery roof and shaft face, works to louvres, new lighting; replacement glazing to corridor; replacement of sculpture court rooflight, reglazing to art gallery and WC block; new art gallery doors. Conservatory Interior; new path layout, planting beds and pond; removal of rooflights and works to offices; new structure to terrace and replacement of stair; new stair and lift core adjacent to fly tower; insertion of spiral stair and widening opening; new garden room plant, lighting and flooring; opening to shaft; new doors to conservatory; works to art gallery lighting; upgrades to cloakroom and toilets. External works to Lakeside Terrace and catering block; replacement glazing; lowering of cafe cil; new awnings; new and replacement lighting; facade repairs; works to staircase 8; replacement foyer doors; works to balconies, including levelling and planting; and restoration of fountains. Internal works to the foyers; creation of openings in shafts; lift installation; changes to lighting; installation of LED screens; creation of access hatches to shafts; replacement flooring; replacement and relocation of shop; creation of new WCs and refurbishment of existing; new quiet room; removal of cafe and relocation of bar; additional storage and works to doors at internal roadway, creation of level access in the Curve Gallery and other works to finishes; infill of martini bar hole; new power and data points to shafts; strip out of catering block interiors to shell and core. Other; works to back of house areas including plant rooms, Car Park 3 and 5, and service road to facilitate MEP; enlarged grille in Silk Street pavement; removal and replacement of paving to include waterproofing throughout; other landscaping and regrading works; and other associated works and infrastructure.

Barbican Centre And Pavement Outside The Service Road Entrance Silk Street London EC2Y 8DS

DecidedReference: 25/00910/LBCCity of London Corporation

Last published check: 28 Sept 2026, 10:36. Check the council record for more recent changes.

Application location

Barbican Centre And Pavement Outside The Service Road Entrance Silk Street London EC2Y 8DS

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Listed Building Consent
Received
14 Jul 2025
Validated
14 Jul 2025
Determination deadline
8 Sept 2025
Local authority
City of London Corporation

Application overview

Works comprising: Conservatory Exterior; replacement of glazing, new louvres, works to frame; enclosure of walkways; new workshop, new planter beds; vents to art gallery roof and shaft face, works to louvres, new lighting; replacement glazing to corridor; replacement of sculpture court rooflight, reglazing to art gallery and WC block; new art gallery doors. Conservatory Interior; new path layout, planting beds and pond; removal of rooflights and works to offices; new structure to terrace and replacement of stair; new stair and lift core adjacent to fly tower; insertion of spiral stair and widening opening; new garden room plant, lighting and flooring; opening to shaft; new doors to conservatory; works to art gallery lighting; upgrades to cloakroom and toilets. External works to Lakeside Terrace and catering block; replacement glazing; lowering of cafe cil; new awnings; new and replacement lighting; facade repairs; works to staircase 8; replacement foyer doors; works to balconies, including levelling and planting; and restoration of fountains. Internal works to the foyers; creation of openings in shafts; lift installation; changes to lighting; installation of LED screens; creation of access hatches to shafts; replacement flooring; replacement and relocation of shop; creation of new WCs and refurbishment of existing; new quiet room; removal of cafe and relocation of bar; additional storage and works to doors at internal roadway, creation of level access in the Curve Gallery and other works to finishes; infill of martini bar hole; new power and data points to shafts; strip out of catering block interiors to shell and core. Other; works to back of house areas including plant rooms, Car Park 3 and 5, and service road to facilitate MEP; enlarged grille in Silk Street pavement; removal and replacement of paving to include waterproofing throughout; other landscaping and regrading works; and other associated works and infrastructure.

Proposal details

Reference
25/00910/LBC
Alternative references
PP-14098969
Ward
Cripplegate
Agent
The Planning Lab

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 363 of 363

DocumentPublishedAction
Officers ReportOfficers Report · PDF24 Feb 2026View
LISTED BUILDING CONSENT (CONDITIONAL)Decision · PDF24 Feb 2026View
CONSERVATORY - FABRIC REMOVAL SOUTH EAST ELEVATIONDrawing · PDF15 Jan 2026View
CONSERVATORY - PROPOSED GARDEN ROOM & TERRACE ELEVATIONDrawing · PDF15 Jan 2026View
FOYER - FABRIC REMOVAL ELEVATIONS - NEW LIFTDrawing · PDF15 Jan 2026View
FABRIC REMOVAL SOUTH ELEVATIONDrawing · PDF15 Jan 2026View
CATERING BLOCK - FABRIC REMOVAL ELEVATIONSDrawing · PDF15 Jan 2026View
FOYER - PROPOSED - FACADE BAY STUDY - MAIN ENTRANCE BAYSDrawing · PDF15 Jan 2026View
FOYER - PROPOSED - FACADE BAY STUDY - WESTERN BAYDrawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS- FABRIC REMOVAL LEVEL 4 RCPDrawing · PDF15 Jan 2026View
CONSERVATORY - PROPOSED LEVEL 04 PLAN - FLYTOWER WALKWAYDrawing · PDF15 Jan 2026View
FOYER - EXISTING ELEVATIONS - NEW LIFTDrawing · PDF15 Jan 2026View
FOYER - FABRIC REMOVAL LEVEL 00 FLOOR PLANDrawing · PDF15 Jan 2026View
FOYER - FABRIC REMOVAL LEVEL B2M FLOOR PLANDrawing · PDF15 Jan 2026View
CATERING BLOCK - PROPOSED - FACADE BAY STUDY - SOUTHDrawing · PDF15 Jan 2026View
FOYER - PROPOSED SECTION - EAST-WEST - 2Drawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 02Drawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 03Drawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 04Drawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 05Drawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 06Drawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL ROOF PLANDrawing · PDF15 Jan 2026View
CONSERVATORY - FABRIC REMOVAL SOUTH ELEVATIONDrawing · PDF15 Jan 2026View
LEVEL 3 & 4 FOYER - FABRIC REMOVAL ELEVATIONSDrawing · PDF15 Jan 2026View
CONSERVATORY-FABRIC REMOVAL-GARDEN ROOM AND TERRACEDrawing · PDF15 Jan 2026View
CONSERVATORY-FABRIC REMOVAL-GARDEN ROOM AND TERRACE ELEVATIONDrawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL2 RCPDrawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL2 RCPDrawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 3 RCPDrawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL 03 PLANDrawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL 04 PLANDrawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL 05 PLANDrawing · PDF15 Jan 2026View
CONSERVATORY - PROPOSED SECTION AADrawing · PDF15 Jan 2026View
CONSERVATORY - PROPOSED SECTION BBDrawing · PDF15 Jan 2026View
CONSERVATORY-GARDEN ROOM AND TERRACE-CROSS SECTIONDrawing · PDF15 Jan 2026View
CONSERVATORY - PROPOSED LEVEL 03 PLAN - ARRIVAL AREADrawing · PDF15 Jan 2026View
CONSERVATORY - PROPOSED LEVEL 03 PLAN - CENTRAL PONDDrawing · PDF15 Jan 2026View
CONSERVATORY - PROPOSED LEVEL 03 PLAN - GARDEN ROOMDrawing · PDF15 Jan 2026View
CONSERVATORY - PROPOSED LEVEL 03 PLAN - EAST LANDSCAPEDrawing · PDF15 Jan 2026View
CONSERVATORY - PROPOSED LEVEL 03 PLAN- THE TRIANGLEDrawing · PDF15 Jan 2026View
LEVEL 03 FOYER-PROPOSED LEVEL 03 PLANDrawing · PDF15 Jan 2026View
CONSERVATORY - PROPOSED LEVEL 04 PLAN - ARID PROPAGATIONDrawing · PDF15 Jan 2026View
CONSERVATORY - PROPOSED LEVEL 05 FLYTOWER WALKWAYDrawing · PDF15 Jan 2026View
CONSERVATORY - TERRACE - BAY STUDY 3 OF 6Drawing · PDF15 Jan 2026View
CONSERVATORY - TERRACE - BAY STUDY 4 OF 6Drawing · PDF15 Jan 2026View
FOYER - PROPOSED LAYOUT - LEVEL 0 BRIDGEDrawing · PDF15 Jan 2026View
FOYER - PROPOSED LAYOUT - NEW LIFTDrawing · PDF15 Jan 2026View
FOYER - PROPOSED LAYOUT - SCREENSDrawing · PDF15 Jan 2026View
CATERING BLOCK - PROPOSED - FACADE DETAILS - UPPER LEVELSDrawing · PDF15 Jan 2026View
CATERING BLOCK & LIBRARY - PROPOSED - WINDOWSDrawing · PDF15 Jan 2026View
PROPOSED SOUTH ELEVATIONDrawing · PDF15 Jan 2026View
FOYER - PROPOSED LEVEL B1 FLOOR PLANDrawing · PDF15 Jan 2026View
FOYER - PROPOSED SECTION - NORTH-SOUTH - 2Drawing · PDF15 Jan 2026View
CONSERVATORY - PROPOSED LEVEL 04 PLAN - CONSERVATORY TERRACEDrawing · PDF15 Jan 2026View
LEVEL 3 & 4 FOYER - FABRIC REMOVAL ELEVATIONSDrawing · PDF15 Jan 2026View
CONSERVATORY - FABRIC REMOVAL NORTH ELEVATIONDrawing · PDF15 Jan 2026View
CONSERVATORY - FABRIC REMOVAL NORTH EAST ELEVATIONDrawing · PDF15 Jan 2026View
CONSERVATORY - FABRIC REMOVAL WEST ELEVATIONDrawing · PDF15 Jan 2026View
CONSERVATORY - FABRIC REMOVAL WEST ELEVATION INTERNALDrawing · PDF15 Jan 2026View
CONSEVATORY - FABRIC REMOVAL SECTION AADrawing · PDF15 Jan 2026View
CONSERVATORY - FABRIC REMOVAL SECTION BBDrawing · PDF15 Jan 2026View
CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL2 RCPDrawing · PDF15 Jan 2026View
CONSERVATORY - PROPOSED SECTION AADrawing · PDF15 Jan 2026View
FOYER - PROPOSED - FACADE DETAILS - WESTERN BAYDrawing · PDF15 Jan 2026View
DAS ADDENDUM 19.12.25Other · PDF12 Jan 2026View
BRP, TOILET EQUALITY ANALYSISOther · PDF12 Jan 2026View
EA PAGES IN DASOther · PDF12 Jan 2026View
BRP PHASE 1 TRACKER - DESIGN COMMENTS 18.12.25Other · PDF12 Jan 2026View
BRP PHASE 1 TRACKER - ACCESS COMMENTS 18.12.25Other · PDF12 Jan 2026View
DRAWING LIST_COMMENTSOther · PDF12 Jan 2026View
DRAWING LISTOther · PDF12 Jan 2026View
LEVEL 0 RAMP OCCUPANCY DRAWINGOther · PDF12 Jan 2026View
FOYER BRIDGE FOOTFALL - ADDITONAL INFORMATIONOther · PDF12 Jan 2026View
COMMENTS - LONDON UNDERGROUNDConsultee Comment · PDF23 Sept 2025View
COMMENTS - HISTORIC ENGLANDConsultee Comment · PDF17 Sept 2025View
COMMENTS - TWENTIETH CENTURY SOCIETYConsultee Comment · PDF11 Sept 2025View
COMMENTS - NATIONAL AMENITY SOCIETY?SAccompanying letters · PDF14 Aug 2025View
PROPOSED CAR PARK STORAGE - LEVEL B1 - ELEVATIONS PROPOSED - LAYOUTDrawing · PDF12 Aug 2025View
APPLICATIONFORMREDACTEDApplication Form · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 0Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 1_PART 1Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 1_PART 2Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 2_PART 1Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 2_PART 2Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 2_PART 3Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.1Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART1Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART2Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART3Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART4Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART5Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART6Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART7Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART8Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.3Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART1Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART2Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART3Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART4Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART5Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART6Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART7Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.5_PART1Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.5_PART2Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.6_PART1Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.6_PART2Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.6_PART3Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.7Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.8Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.9_PART1Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.9_PART2Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 4_5_6Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.1Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART1Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART2Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART3Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART5Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART6Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.3Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.4Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.5_PART 1Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.5_PART 2Report - Design & Access Statement/Report · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.6_PART 2Report - Design & Access Statement/Report · PDF14 Jul 2025View
COVER LETTERCover Letter · PDF14 Jul 2025View
CONSERVATORY - EXISTING SOUTH EAST ELEVATIONDrawing · PDF14 Jul 2025View
CONSERVATORY - EXISTING NORTH ELEVATIONDrawing · PDF14 Jul 2025View
CONSERVATORY - EXISTING NORTH EAST ELEVATIONDrawing · PDF14 Jul 2025View
BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART4Report - Design & Access Statement/Report · PDF14 Jul 2025View
LEVEL 3 AND 4 FOYER - EXISTING ELEVATIONSDrawing · PDF14 Jul 2025View
CONSERVATORY - EXISTING SOUTH ELEVATIONDrawing · PDF14 Jul 2025View
CONSERVATORY - TYPICAL FACADE BASE DETAILDrawing · PDF14 Jul 2025View
CONSERVATORY - TYPICAL VERTICAL GLAZING DETAILSDrawing · PDF14 Jul 2025View
CONSERVATORY - TYPICAL SLOPED GLAZING DETAILDrawing · PDF14 Jul 2025View
CONSERVATORY - GARDEN ROOM - TYPICAL DETAILSDrawing · PDF14 Jul 2025View
CONSERVATORY - FROBISHER CORRIDOR EXISTING TYPIDrawing · PDF14 Jul 2025View
CONSERVATORY - FROBISHER CORRIDOR PROPOSED TYPIDrawing · PDF14 Jul 2025View
CONSERVATORY - WEST STAIR - TYPICAL DETAILSDrawing · PDF14 Jul 2025View
CONSERVATORY - SPIRAL STAIR - TYPICAL DETAILSDrawing · PDF14 Jul 2025View
CONSERVATORY - SOUTH STAIR - TYPICAL DETAILSDrawing · PDF14 Jul 2025View
CONSERVATORY - EAST STAIR - TYPICAL DETAILSDrawing · PDF14 Jul 2025View
CONSERVATORY - TYPICAL BALUSTRADE TYPE 01Drawing · PDF14 Jul 2025View
CONSERVATORY - TYPICAL BALUSTRADE TYPE 02Drawing · PDF14 Jul 2025View
CONSERVATORY - TYPICAL BALUSTRADE TYPE 03Drawing · PDF14 Jul 2025View
CONSERVATORY - TYPICAL BALUSTRADE TYPE 04Drawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED WEST STAIR - TYPICAL PLDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED SPIRAL STAIR - TYPICALDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED WEST STAIR - TYPICAL ELDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED EAST STAIR - TYPICAL ELDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED SOUTH STAIR - TYPICAL EDrawing · PDF14 Jul 2025View
CONSERVATORY-TERRACE-BAY STUDY 1 OF 6Drawing · PDF14 Jul 2025View
CONSERVATORY-TERRACE-BAY STUDY 2 OF 6Drawing · PDF14 Jul 2025View
CONSERVATORY-TERRACE-BAY STUDY 5 OF 6Drawing · PDF14 Jul 2025View
CONSERVATORY-TERRACE-BAY STUDY 6 OF 6Drawing · PDF14 Jul 2025View
CONSERVATORY-GARDEN ROOM-NORTH ELEVATIONDrawing · PDF14 Jul 2025View
CONSERVATORY-GARDEN ROOM-SOUTH ELEVATIONDrawing · PDF14 Jul 2025View
CONSERVATORY-NURSERYDrawing · PDF14 Jul 2025View
CONSERVATORY - ENTRANCE BAY STUDYDrawing · PDF14 Jul 2025View
CONSERVATORY-GARDEN ROOM-INTERNAL ELEVATIONSDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED LEVEL 03 PLAN- BALCONIEDrawing · PDF14 Jul 2025View
LEVEL 04 FOYER - PROPOSED LEVEL 04 PLANDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED LEVEL 06 FLYTOWER WALKDrawing · PDF14 Jul 2025View
BCRPP1-AAM-ZZ-ZZZZ-DR-AR-07001 - LOCATION PLAN - LISTED BUILDING CONSENTSite Plan · PDF14 Jul 2025View
SITE PLAN - LISTED BUILDING CONSENTDrawing · PDF14 Jul 2025View
BCRPP1-ARC-XX-XXXX-SH-AR-07001 - BRP PHASE 1 SUBMISSION DRAWING LISTDrawings Schedule · PDF14 Jul 2025View
FOYER - EXISTING LEVEL 00 FLOOR PLANDrawing · PDF14 Jul 2025View
FOYER - EXISTING LEVEL 00 RCPDrawing · PDF14 Jul 2025View
FOYER - EXISTING LEVEL 01 FLOOR PLANDrawing · PDF14 Jul 2025View
FOYER - EXISTING LEVEL 01 RCPDrawing · PDF14 Jul 2025View
FOYER - EXISTING LEVEL B1 FLOOR PLANDrawing · PDF14 Jul 2025View
FOYER - EXISTING LEVEL B2M RCPDrawing · PDF14 Jul 2025View
FOYER - EXISTING - FACADE BAY STUDY - MAIN ENTRANDrawing · PDF14 Jul 2025View
FOYER - EXISTING - FACADE BAY STUDY - TRIPLE HEIGDrawing · PDF14 Jul 2025View
FOYER - EXISTING - FACADE BAY STUDY - WESTERN BAYDrawing · PDF14 Jul 2025View
CONSERVATORY - EXISTING WEST ELEVATIONDrawing · PDF14 Jul 2025View
CONSERVATORY - EXISTING WEST ELEVATION INTERNALDrawing · PDF14 Jul 2025View
SITE WIDE - EXISTING SILK STREET ELEVATIONDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - EXISTING LEVELDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - EXISTING LEVELDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - EXISTING LEVELDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - EXISTING LEVELDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - EXISTING ROOFDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - EXISTING LEVELDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - EXISTING LEVELDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - EXISTING LEVELDrawing · PDF14 Jul 2025View
CONSERVATORY - EXISTING SECTION AADrawing · PDF14 Jul 2025View
CONSERVATORY - EXISTING SECTION BBDrawing · PDF14 Jul 2025View
CONSERVATORY-GARDEN ROOM AND TERRACE-CROSS SECTDrawing · PDF14 Jul 2025View
CONSERVATORY-GARDEN ROOM AND TERRACE-NORTH ELEVDrawing · PDF14 Jul 2025View
HANDLING NOTEOther · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - FABRIC REMOVALDrawing · PDF14 Jul 2025View
INFRASTRUCTURE - PROJECT LOCATIONSDrawing · PDF14 Jul 2025View
INFRASTRUCTURE - CENTRAL SERVICES PLANT ROOM PRDrawing · PDF14 Jul 2025View
INFRASTRUCTURE - LEVEL B2M PROPOSALSDrawing · PDF14 Jul 2025View
INFRASTRUCTURE - LEVEL B1 PROPOSALSDrawing · PDF14 Jul 2025View
INFRASTRUCTURE - PROPOSED SHAFT ACCESS IMPROVEMDrawing · PDF14 Jul 2025View
INFRASTRUCTURE - SERVICE ROAD PROPOSED SHAFT OPDrawing · PDF14 Jul 2025View
INFRASTRUCTURE - WEST SIDE AIR INTAKE PROPOSALSDrawing · PDF14 Jul 2025View
INFRASTRUCTURE - EAST SIDE AIR INTAKE PROPOSALSDrawing · PDF14 Jul 2025View
INFRASTRUCTURE - EAST SIDE AIR INTAKE PROPOSALSDrawing · PDF14 Jul 2025View
INFRASTRUCTURE - ANCILLARY PLANT SPACE PROPOSALDrawing · PDF14 Jul 2025View
LEVEL 03 FOYER - TYPICAL EXISTING FACADE DETAILDrawing · PDF14 Jul 2025View
LEVEL 03 FOYER - TYPICAL PROPOSED FACADE DETAILDrawing · PDF14 Jul 2025View
LEVEL 03 AND 04 FOYER - TYPICAL NORTH GLAZING DDrawing · PDF14 Jul 2025View
LEVEL 04 FOYER - TYPICAL ROOFLIGHT DETAILDrawing · PDF14 Jul 2025View
SCULPTURE COURT - TYPICAL EXISTING ROOFLIGHT DEDrawing · PDF14 Jul 2025View
SCULPTURE COURT - TYPICAL PROPOSED ROOFLIGHT DEDrawing · PDF14 Jul 2025View
CONSERVATORY - TERRACE - TYPICAL FACADEDrawing · PDF14 Jul 2025View
CONSERVATORY - TERRACE - TYPICAL SECTIONDrawing · PDF14 Jul 2025View
CONSERVATORY-TERRACE-TYPICAL SECTIONDrawing · PDF14 Jul 2025View
CONSERVATORY - INFILL GLAZING TYPICAL PLAN DETADrawing · PDF14 Jul 2025View
CONSERVATORY - INFILL GLAZING TYPICAL SECTION DDrawing · PDF14 Jul 2025View
CONSERVATORY - TYPICAL LANDSCAPE SECTIONDrawing · PDF14 Jul 2025View
CONSERVATORY - TYPICAL SEATING AREA DETAILDrawing · PDF14 Jul 2025View
CONSERVATORY - TYPICAL PLANTER DETAILDrawing · PDF14 Jul 2025View
CONSERVATORY - SHAFT OPENINGSDrawing · PDF14 Jul 2025View
STAIRCASE 8 - TYPICAL DETAILSDrawing · PDF14 Jul 2025View
LEVEL 3 AND 4 FOYER - PROPOSED ELEVATIONSDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED SOUTH ELEVATIONSuperseded drawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED SOUTH EAST ELEVATIONDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED NORTH ELEVATIONDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED NORTH EAST ELEVATIONDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED WEST ELEVATIONDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED WEST ELEVATION INTERNALDrawing · PDF14 Jul 2025View
SITE WIDE - PROPOSED SILK STREET ELEVATIONDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - PROPOSED LEVELDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - PROPOSED ROOFDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - PROPOSED LEVELDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - PROPOSED LEVELDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - PROPOSED LEVELDrawing · PDF14 Jul 2025View
CONSERVATORY AND UPPER FOYERS - PROPOSED LEVELDrawing · PDF14 Jul 2025View
LEVEL 3 AND 4 FOYER - EXISTING INTERNAL ELEVATIDrawing · PDF14 Jul 2025View
LEVEL 3 AND 4 FOYER - PROPOSED INTERNAL ELEVATIDrawing · PDF14 Jul 2025View
STAIRCASE 8 - BASEMENT PLANSDrawing · PDF14 Jul 2025View
STAIRCASE 8 - LEVEL 01 TO LEVEL 05 PLANSDrawing · PDF14 Jul 2025View
STAIRCASE 8 - LONG SECTIONSDrawing · PDF14 Jul 2025View
STAIRCASE 8 - SHORT SECTIONSDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED SPIRAL STAIR - TYPICALDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED WEST STAIR - TYPICAL PLDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED EAST STAIR - TYPICAL PLDrawing · PDF14 Jul 2025View
CONSERVATORY - PROPOSED SOUTH STAIR - TYPICAL PDrawing · PDF14 Jul 2025View
FOYER - EXISTING LEVEL B1 RCPDrawing · PDF14 Jul 2025View
FOYER - EXISTING LEVEL B1M FLOOR PLANDrawing · PDF14 Jul 2025View
FOYER - EXISTING LEVEL B1M RCPDrawing · PDF14 Jul 2025View
FOYER - EXISTING LEVEL B2M FLOOR PLANDrawing · PDF14 Jul 2025View
FOYER - EXISTING DETAILS - TYPICAL SHAFT OPENINGSDrawing · PDF14 Jul 2025View
FOYER - EXISTING DETAILS - TYPICAL SHAFT OPENINGSDrawing · PDF14 Jul 2025View
FOYER - EXISTING ELEVATIONS - SHAFT 15Drawing · PDF14 Jul 2025View
FOYER - EXISTING ELEVATIONS - SHAFT 16Drawing · PDF14 Jul 2025View
FOYER - EXISTING ELEVATIONS - SHAFT 18Drawing · PDF14 Jul 2025View
FOYER - EXISTING ELEVATIONS - SHAFT 26Drawing · PDF14 Jul 2025View
FOYER - EXISTING DETAILS - TYPICAL CAST IN SHAFTDrawing · PDF14 Jul 2025View
FOYER - EXISTING FACADE DETAILS - LIFT LOBBY BAYDrawing · PDF14 Jul 2025View
FOYER - EXISTING FACADE DETAILS - MAIN ENTRANCE BDrawing · PDF14 Jul 2025View
FOYER - EXISTING FACADE DETAILS - TRIPLE HEIGHT BDrawing · PDF14 Jul 2025View
FOYER - EXISTING FACADE DETAILS - WESTERN BAYDrawing · PDF14 Jul 2025View
FOYER - EXISTING - SECTION - EAST-WEST - 1Drawing · PDF14 Jul 2025View
FOYER - EXISTING - SECTION - EAST-WEST - 2Drawing · PDF14 Jul 2025View
FOYER - EXISTING - SECTION - NORTH-SOUTH - 1Drawing · PDF14 Jul 2025View
FOYER - EXISTING - SECTION - NORTH-SOUTH - 2Drawing · PDF14 Jul 2025View
FOYER - EXISTING - SECTION - NORTH-SOUTH - 3Drawing · PDF14 Jul 2025View
FOYER - EXISTING - FACADE BAY STUDY - LIFT LOBBYDrawing · PDF14 Jul 2025View
CATERING BLOCK - EXISTING LEVELS 00 _ 01 _ 02 RCPDrawing · PDF14 Jul 2025View
CATERING BLOCK - EXISTING ELEVATIONSDrawing · PDF14 Jul 2025View
CATERING BLOCK - EXISTING FACADE DETAILSDrawing · PDF14 Jul 2025View
CATERING BLOCK - EXISTING FACADE DETAILS - UPPERDrawing · PDF14 Jul 2025View
CATERING BLOCK - EXISTING SECTIONDrawing · PDF14 Jul 2025View
CATERING BLOCK - EXISTING - FACADE BAY STUDY - SODrawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL LEVEL 00 RCPDrawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL LEVEL 01 FLOOR PLANDrawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL LEVEL 01 RCPDrawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL SECTION - NORTH-SOUTH - 1Drawing · PDF14 Jul 2025View
CATERING BLOCK - FABRIC REMOVAL SECTIONDrawing · PDF14 Jul 2025View
LAKESIDE TERRACE - FABRIC REMOVAL LEVEL 00 FLOORDrawing · PDF14 Jul 2025View
LAKESIDE TERRACE - FABRIC REMOVAL SECTIONDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LEVEL 00 FLOOR PLANDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LEVEL 00 RCPDrawing · PDF14 Jul 2025View
CATERING BLOCK - EXISTING LEVELS 00 _ 01 _ 02 FLODrawing · PDF14 Jul 2025View
CATERING BLOCK AND LIBRARY - EXISTING FACADE DETADrawing · PDF14 Jul 2025View
LAKESIDE TERRACE - EXISTING SECTIONDrawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL LEVEL B1 FLOOR PLANDrawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL LEVEL B1 RCPDrawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL LEVEL B1M FLOOR PLANSuperseded drawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL LEVEL B1M RCPDrawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL LEVEL B2M RCPDrawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL SECTION - EAST-WEST - 1Drawing · PDF14 Jul 2025View
FOYER - PROPOSED LEVEL 01 FLOOR PLANDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LEVEL 01 RCPDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LEVEL B1 RCPDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LEVEL B1M FLOOR PLANDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LEVEL B1M RCPDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LEVEL B2M FLOOR PLANDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LEVEL B2M RCPDrawing · PDF14 Jul 2025View
FOYER - PROPOSED SECTION - NORTH-SOUTH - 3Drawing · PDF14 Jul 2025View
CATERING BLOCK - PROPOSED LEVELS 00 _ 01 _ 02 FLODrawing · PDF14 Jul 2025View
CATERING BLOCK - PROPOSED LEVELS 00 _ 01 _ 02 RCPDrawing · PDF14 Jul 2025View
CATERING BLOCK - PROPOSED ELEVATIONSDrawing · PDF14 Jul 2025View
CATERING BLOCK - PROPOSED SECTIONDrawing · PDF14 Jul 2025View
LAKESIDE TERRACE - PROPOSED LEVEL 00 FLOOR PLANDrawing · PDF14 Jul 2025View
LAKESIDE TERRACE - PROPOSED SECTIONDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LAYOUT - LEVEL 0 WC AND SHOPDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LAYOUT - LEVEL 0 WC ELEVATIONSDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LAYOUT - NEW GLAZED PARTITIONSDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LAYOUT - LEVEL 0 BARDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LAYOUT - LEVEL 01 WCDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LAYOUT - LEVEL B1 WCDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LAYOUT - LEVEL B1 FUNCTION ROOMDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LAYOUT - LEVEL B1 BARDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LAYOUT - LEVEL B1 CLOAKROOMDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LAYOUT - MARTINI BAR AND WELCOMEDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LAYOUT - LEVEL B1M FUNCTION ROOMDrawing · PDF14 Jul 2025View
FOYER - PROPOSED LAYOUT - LEVEL B2M WCSDrawing · PDF14 Jul 2025View
FOYER - PROPOSED - FACADE BAY STUDY - LIFT LOBBYDrawing · PDF14 Jul 2025View
FOYER - PROPOSED - FACADE BAY STUDY - TRIPLE HEIGDrawing · PDF14 Jul 2025View
CATERING BLOCK - PROPOSED - FACADE BAY STUDY - EADrawing · PDF14 Jul 2025View
CATERING BLOCK - PROPOSED LAYOUT - GOODS LIFTDrawing · PDF14 Jul 2025View
CATERING BLOCK - PROPOSED LAYOUT - TYPICAL WCDrawing · PDF14 Jul 2025View
LAKESIDE TERRACE - PROPOSED LAYOUT - RAMPDrawing · PDF14 Jul 2025View
LAKESIDE TERRACE - PROPOSED DETAIL SECTION - FOYEDrawing · PDF14 Jul 2025View
LAKESIDE TERRACE - PROPOSED DETAIL SECTION - CATEDrawing · PDF14 Jul 2025View
LAKESIDE TERRACE - PROPOSED DETAIL SECTION - PODIDrawing · PDF14 Jul 2025View
FOYER - PROPOSED DETAILS - CURVE GALLERY FLOORDrawing · PDF14 Jul 2025View
PROPOSED - FOYER DETAILS - CURVE GALLERY WALLDrawing · PDF14 Jul 2025View
FOYER - PROPOSED DETAIS - TYPICAL DETAILSDrawing · PDF14 Jul 2025View
FOYER - PROPOSED DETAILS - L0 SHOP SCREENDrawing · PDF14 Jul 2025View
FOYER - PROPOSED DETAILS - B1M FUNCTION ROOM SCRDrawing · PDF14 Jul 2025View
FOYER - PROPOSED DETAILS - TYPICAL CAST IN SHAFTDrawing · PDF14 Jul 2025View
FOYER - PROPOSED ELEVATIONS - SHAFT 15Drawing · PDF14 Jul 2025View
FOYER - PROPOSED ELEVATIONS - SHAFT 16Drawing · PDF14 Jul 2025View
FOYER - PROPOSED ELEVATIONS - SHAFT 18Drawing · PDF14 Jul 2025View
FOYER - PROPOSED ELEVATIONS - SHAFT 26Drawing · PDF14 Jul 2025View
FOYER - PROPOSED - FACADE DETAILS - LIFT LOBBY BADrawing · PDF14 Jul 2025View
CATERING BLOCK - EXISTING - FACADE BAY STUDY - EADrawing · PDF14 Jul 2025View
LAKESIDE TERRACE - EXISTING LEVEL 00 PLANDrawing · PDF14 Jul 2025View
EXISTING SOUTH ELEVATIONDrawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL SECTION - EAST-WEST - 2Drawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL S - COPYDrawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL SECTION - NORTH-SOUTH - 2Drawing · PDF14 Jul 2025View
FOYER - FABRIC REMOVAL SECTION - NORTH-SOUTH - 3Drawing · PDF14 Jul 2025View
CATERING BLOCK - FABRIC REMOVAL LEVELS 00 _ 01 _Drawing · PDF14 Jul 2025View
CATERING BLOCK - FABRIC REMOVAL LEVELS 00 _ 01 _Drawing · PDF14 Jul 2025View
FOYER - PROPOSED SECTION - EAST-WEST - 1Drawing · PDF14 Jul 2025View
FOYER - PROPOSED SECTION - EAST-WEST - 2Drawing · PDF14 Jul 2025View
FOYER - PROPOSED SECTION - NORTH-SOUTH - 1Drawing · PDF14 Jul 2025View
FOYER - PROPOSED - FACADE DETAILS - MAIN ENTRANCEDrawing · PDF14 Jul 2025View
FOYER - PROPOSED - FACADE DETAILS - TRIPLE HEIGHTDrawing · PDF14 Jul 2025View
FOYER - PROPOSED DETAILS - TYPICAL BALUSTRADINGDrawing · PDF14 Jul 2025View
CATERING BLOCK - PROPOSED - FACADE DETAILS - LEVESuperseded drawing · PDF14 Jul 2025View
CATERING BLOCK AND LIBRARY - PROPOSED - FACADE DEDrawing · PDF14 Jul 2025View
LAKESIDE TERRACE - PROPOSED - TYPICAL PAVING DETADrawing · PDF14 Jul 2025View
2025-07-10 - BARBICAN RENEWAL PROGRAMME - PHASE 1 HERITAGE STATEMENT - PART 1Accompanying report · PDF14 Jul 2025View
2025-07-10 - BARBICAN RENEWAL PROGRAMME - PHASE 1 HERITAGE STATEMENT - PART 2Accompanying report · PDF14 Jul 2025View
BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 1Accompanying report · PDF14 Jul 2025View
BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 2Accompanying report · PDF14 Jul 2025View
BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 3Accompanying report · PDF14 Jul 2025View
BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 4Accompanying report · PDF14 Jul 2025View
BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 5Accompanying report · PDF14 Jul 2025View
BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 6Accompanying report · PDF14 Jul 2025View
BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 7Accompanying report · PDF14 Jul 2025View
BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 8Accompanying report · PDF14 Jul 2025View
BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 9Accompanying report · PDF14 Jul 2025View
BCRPP1-BHE-XX-XXXX-RP-EE-07001 - LIGHTING (BACK OF HOUSE) REPORTOther · PDF14 Jul 2025View
CITYAM NEWSPAPER COPY 10.7.25Other · PDF14 Jul 2025View
BRP PLANNING STATEMENTReport - Planning Statement/Report · PDF14 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  7. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Actual Committee Date

    Published milestoneCouncil source
  13. Decision Made Date

    Published milestoneCouncil source
  14. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Approved
LISTED BUILDING CONSENT (CONDITIONAL)
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.