Council planning record

Refurbishment and alterations to office building including:i) Provision of access to terraces on the 4th floor and alteration and extension to existing roof terrace on the 8th and 9th floors including the formation of two roof pavilions, installation of stairs, removal and relocation of plant area, landscaping changes, installation of rooflights, removal of rooflights and installation of balustrades; ii) Creation of new openings and installation of windows at ground floor on Victoria Embankment elevation;iii) installation of louvers, creation of double height entrance space to atrium and installation of plant screen at 6th floor on Watergate Street;iv) Alterations to fenestration and internal office layout to all floors and other associated works;v) Removal of office spaces above the atrium on floors 5 to 8 and installation of stairs to all floors;vi) Reconfiguration of basement level to provide new auditorium space, revised car parking arrangement, cycle storage and end of trip facilities, with provision of cycle access from Victoria Embankment via former car park access; andvii) Reconfiguration at ground floor to create open workspace and tenant amenity space.

Unilever House Victoria Embankment London EC4Y 0DY

DecidedReference: 25/00849/LBCCity of London Corporation

Last published check: 28 Sept 2026, 03:40. Check the council record for more recent changes.

Application location

Unilever House Victoria Embankment London EC4Y 0DY

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Listed Building Consent
Received
30 Jun 2025
Validated
21 Jul 2025
Determination deadline
15 Sept 2025
Local authority
City of London Corporation

Application overview

Refurbishment and alterations to office building including:i) Provision of access to terraces on the 4th floor and alteration and extension to existing roof terrace on the 8th and 9th floors including the formation of two roof pavilions, installation of stairs, removal and relocation of plant area, landscaping changes, installation of rooflights, removal of rooflights and installation of balustrades; ii) Creation of new openings and installation of windows at ground floor on Victoria Embankment elevation;iii) installation of louvers, creation of double height entrance space to atrium and installation of plant screen at 6th floor on Watergate Street;iv) Alterations to fenestration and internal office layout to all floors and other associated works;v) Removal of office spaces above the atrium on floors 5 to 8 and installation of stairs to all floors;vi) Reconfiguration of basement level to provide new auditorium space, revised car parking arrangement, cycle storage and end of trip facilities, with provision of cycle access from Victoria Embankment via former car park access; andvii) Reconfiguration at ground floor to create open workspace and tenant amenity space.

Proposal details

Reference
25/00849/LBC
Alternative references
PP-14052657
Ward
Castle Baynard
Agent
DP9

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 86 of 86

DocumentPublishedAction
Officers ReportOfficers Report · PDF26 Feb 2026View
LISTED BUILDING CONSENT (CONDITIONAL)Decision · PDF26 Feb 2026View
LISTED BUILDING CONSENT (CONDITIONAL)Decision · PDF26 Feb 2026View
COMMENTS - TWENTIETH CENTURY SOCIETYConsultee Comment · PDF5 Feb 2026View
COMMENTS - HISTORIC ENGLAND (1)Consultee Comment · PDF5 Feb 2026View
COMMENTS - HISTORIC ENGLAND (2)Consultee Comment · PDF5 Feb 2026View
COMMENTS - HISTORIC ENGLANDConsultee Comment · PDF5 Feb 2026View
PROPOSED PLANS ROOFDrawing · PDF4 Feb 2026View
LINEAR INTERPOLATION PROPOSED ROOF LEVELDrawing · PDF4 Feb 2026View
COMMENTS - HISTORIC BUILDINGSConsultee Comment · PDF22 Jan 2026View
PROPOSED ROOF PLANDrawing · PDF16 Jan 2026View
PLANNING DRAWINGS 2Other · PDF16 Jan 2026View
PROPOSED LEVEL 09 PLAN 6Drawing · PDF12 Jan 2026View
PROPOSED NORTH ELEVATION 2Drawing · PDF12 Jan 2026View
PROPOSED SOUTHEAST ELEVATION 2Drawing · PDF12 Jan 2026View
PROPOSED SECTION 1 - EAST WEST 2Drawing · PDF12 Jan 2026View
PROPOSED SECTION 2 - NORTH SOUTH 4Drawing · PDF12 Jan 2026View
TTC NOTEOther · PDF12 Jan 2026View
LVMF VIEWS_FINALOther · PDF12 Jan 2026View
DAS ADDENDUM 1_REV1Other · PDF12 Jan 2026View
COMMENTS - HISTORIC ENGLANDConsultee Comment · PDF7 Jan 2026View
RAMP GRADIENT MARK UP 2Drawing · PDF3 Oct 2025View
FIRE EXIT MARK UP 4.Drawing · PDF3 Oct 2025View
PROPOSED LEVEL 09 PLAN 3Drawing · PDF3 Oct 2025View
PROPOSED LEVEL 08 PLAN 3Drawing · PDF3 Oct 2025View
PROPOSED GROUND FLOOR PLAN 3Drawing · PDF3 Oct 2025View
PROPOSED LOWER GROUND FLOOR PLAN 6Drawing · PDF3 Oct 2025View
COMMENTS - HISTORIC BUILDING & PLACESConsultee Comment · PDF15 Aug 2025View
COMMENTS - TWENTIETH CENTURY SOCIETYConsultee Comment · PDF15 Aug 2025View
COMMENTS - HISTORIC ENGLANDConsultee Comment · PDF15 Aug 2025View
COMMENTS - HISTORIC ENGLANDConsultee Comment · PDF15 Aug 2025View
DOCUMENT REGISTERDrawings Schedule · PDF25 Jul 2025View
SITE LOCATION PLANSite Plan · PDF25 Jul 2025View
INDICATIVE S278 WORKSDrawing · PDF25 Jul 2025View
PROPOSED NORTHEAST & SOUTHWEST ELEVATIONSDrawing · PDF25 Jul 2025View
PROPOSED WEST ELEVATIONDrawing · PDF25 Jul 2025View
EXISTING SECTION 2 - NORTH SOUTHDrawing · PDF25 Jul 2025View
EXISTING NORTHEAST & SOUTHWEST ELEVATIONSDrawing · PDF25 Jul 2025View
EXISTING WEST ELEVATIONDrawing · PDF25 Jul 2025View
APPLICATIONFORMREDACTEDApplication Form · PDF30 Jun 2025View
100 VE_LIGHTING STRATEGY AND CONCEPTOther · PDF30 Jun 2025View
100 VE_SUICIDE PREVENTIONOther · PDF30 Jun 2025View
ENVIRONMENTAL MANAGEMENT PLAN _ REVOther · PDF30 Jun 2025View
100 VICTORIA EMBANKMENT - PRELIMINARY ECOLOGICAL APPRAISALOther · PDF30 Jun 2025View
100VE SUSTAINABLE DESIGN STATEMENTOther · PDF30 Jun 2025View
681809 FRA R01Accompanying report · PDF30 Jun 2025View
1015890-HLE-AC-RP-NOISE IMPACT ASSESSMENT-REV01Report - Acoustic/Noise Report · PDF30 Jun 2025View
20250606 100VE TRANSPORT STATEMENTReport - Transport Statement/Report · PDF30 Jun 2025View
20250606_OUTLINE CLPOther · PDF30 Jun 2025View
EXISTING SUBBASEMENT PLANDrawing · PDF30 Jun 2025View
EXISTING BASEMENT PLANDrawing · PDF30 Jun 2025View
EXISTING LOWER GROUND PLANDrawing · PDF30 Jun 2025View
EXISTING GROUND FLOOR PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 01 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 02 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 03 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 04 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 05 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 06 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 07 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 08 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 09 PLANDrawing · PDF30 Jun 2025View
EXISTING NORTH ELEVATIONDrawing · PDF30 Jun 2025View
EXISTING SOUTHEAST ELEVATIONDrawing · PDF30 Jun 2025View
EXISTING SECTION 1 - EAST WESTDrawing · PDF30 Jun 2025View
PROPOSED SUBBASEMENT PLANDrawing · PDF30 Jun 2025View
PROPOSED BASEMENT PLANDrawing · PDF30 Jun 2025View
PROPOSED LOWER GROUND PLANDrawing · PDF30 Jun 2025View
PROPOSED GROUND FLOOR PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 01 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 02 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 03 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 04 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 05 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 06 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 07 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 08 PLANDrawing · PDF30 Jun 2025View
100 VICTORIA EMBANKMENT ENGAGEMENT SUMMARYOther · PDF30 Jun 2025View
100 VE_DAS_CH5-8Report - Design & Access Statement/Report · PDF30 Jun 2025View
100 VE_DAS_CH1-3Report - Design & Access Statement/Report · PDF30 Jun 2025View
100 VE_DAS_CH4_AReport - Design & Access Statement/Report · PDF30 Jun 2025View
100 VE_DAS_CH4_B (1)Report - Design & Access Statement/Report · PDF30 Jun 2025View
DP9 100 VICTORIA EMBANKMENT PLANNING STATEMENTReport - Planning Statement/Report · PDF30 Jun 2025View
SECURITY PLANNING STATEMENT REV01 V.03Accompanying report · PDF30 Jun 2025View
250623 100VE HTVIA - LR_PART2Accompanying report · PDF30 Jun 2025View
250623 100VE HTVIA - LR_PART1Accompanying report · PDF30 Jun 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Last Advertised In Press Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Last Site Notice Posted Date

    Published milestoneCouncil source
  6. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Standard Consultation Date

    Published milestoneCouncil source
  9. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Actual Committee Date

    Published milestoneCouncil source
  11. Decision Issued Date

    Published milestoneCouncil source
  12. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Approved
LISTED BUILDING CONSENT (CONDITIONAL) LISTED BUILDING CONSENT (CONDITIONAL)

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.