Council planning record

Refurbishment and alterations to office building including:i) Provision of access to terraces on the 4th floor and alteration and extension to existing roof terrace on the 8th and 9th floors including the formation of two roof pavilions, installation of stairs, removal and relocation of plant area, landscaping changes, installation of rooflights, removal of rooflights and installation of balustrades; ii) Creation of new openings and installation of windows at ground floor on Victoria Embankment elevation;iii) installation of louvers, creation of double height entrance space to atrium and installation of plant screen at 6th floor on Watergate Street;iv) Alterations to fenestration to all floors and other associated works; andv) Reconfiguration of basement level to provide new auditorium space, revised car parking arrangement, cycle storage and end of trip facilities, with provision of cycle access from Victoria Embankment via former car park access.

Unilever House Victoria Embankment London EC4Y 0DY

DecidedReference: 25/00848/FULLCity of London Corporation

Last published check: 28 Sept 2026, 03:39. Check the council record for more recent changes.

Application location

Unilever House Victoria Embankment London EC4Y 0DY

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Planning Permission
Received
30 Jun 2025
Validated
21 Jul 2025
Determination deadline
15 Sept 2025
Local authority
City of London Corporation

Application overview

Refurbishment and alterations to office building including:i) Provision of access to terraces on the 4th floor and alteration and extension to existing roof terrace on the 8th and 9th floors including the formation of two roof pavilions, installation of stairs, removal and relocation of plant area, landscaping changes, installation of rooflights, removal of rooflights and installation of balustrades; ii) Creation of new openings and installation of windows at ground floor on Victoria Embankment elevation;iii) installation of louvers, creation of double height entrance space to atrium and installation of plant screen at 6th floor on Watergate Street;iv) Alterations to fenestration to all floors and other associated works; andv) Reconfiguration of basement level to provide new auditorium space, revised car parking arrangement, cycle storage and end of trip facilities, with provision of cycle access from Victoria Embankment via former car park access.

Proposal details

Reference
25/00848/FULL
Alternative references
PP-14052657
Ward
Castle Baynard
Agent
DP9

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 90 of 90

DocumentPublishedAction
Officers ReportOfficers Report · PDF26 Feb 2026View
PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)Decision · PDF26 Feb 2026View
PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)Decision · PDF26 Feb 2026View
COMMENTS - CITY OF LONDON CONSERVATION AREA ADVISORY COMMITTEEConsultee Comment · PDF18 Feb 2026View
ILLUSTRATIVE ROOF PLANDrawing · PDF9 Feb 2026View
PRELIMINARY ECOLOGICAL APPRAISALAccompanying report · PDF9 Feb 2026View
STATUTORY METRICAccompanying letters9 Feb 2026View
LINEAR INTERPOLATION PROPOSED ROOF LEVELDrawing · PDF4 Feb 2026View
PROPOSED PLANS ROOFDrawing · PDF4 Feb 2026View
COMMENTS - TRANSPORT FOR LONDONConsultee Comment · PDF30 Jan 2026View
COMMENTS - SURVEYOR TO THE FABRIC OF ST PAUL?S CATHEDRALConsultee Comment · PDF27 Jan 2026View
PLANNING DRAWINGS 2Other · PDF16 Jan 2026View
DAS ADDENDUM 1_REV1Other · PDF12 Jan 2026View
LVMF VIEWS_FINALOther · PDF12 Jan 2026View
TTC NOTEOther · PDF12 Jan 2026View
PROPOSED SECTION 2 - NORTH SOUTH 4Drawing · PDF12 Jan 2026View
PROPOSED SECTION 1 - EAST WEST 2Drawing · PDF12 Jan 2026View
PROPOSED SOUTHEAST ELEVATION 2Drawing · PDF12 Jan 2026View
PROPOSED NORTH ELEVATION 2Drawing · PDF12 Jan 2026View
PROPOSED LEVEL 09 PLAN 6Drawing · PDF12 Jan 2026View
COMMENTS - SURVEYOR TO THE FABRIC - ST PAUL'S CATHEDRALConsultee Comment · PDF9 Oct 2025View
PROPOSED LEVEL 08 PLAN 3Drawing · PDF3 Oct 2025View
PROPOSED GROUND FLOOR PLAN 3Drawing · PDF3 Oct 2025View
PROPOSED LOWER GROUND FLOOR PLAN 6Drawing · PDF3 Oct 2025View
FIRE EXIT MARK UP 4Drawing · PDF3 Oct 2025View
RAMP GRADIENT MARK UP 2Drawing · PDF3 Oct 2025View
ELEVATIONSDrawing · PDF12 Sept 2025View
RESPONSE TO FIRE COMMENTSOther · PDF12 Sept 2025View
CAAC LETTERConsultee Comment · PDF11 Sept 2025View
PROPOSED PLANS LOWER GROUNDDrawing · PDF29 Aug 2025View
SERVICE YARD 8M WASTE COLLECTION VEHICLE SWEPT PATH ANALYSISDrawing · PDF29 Aug 2025View
COMMENTS - TFLConsultee Comment · PDF8 Aug 2025View
COMMENTS - TRANSPORT FOR LONDONConsultee Comment · PDF29 Jul 2025View
DOCUMENT REGISTERDrawings Schedule · PDF25 Jul 2025View
SITE LOCATION PLANSite Plan · PDF25 Jul 2025View
INDICATIVE S278 WORKSDrawing · PDF25 Jul 2025View
EXISTING WEST ELEVATIONDrawing · PDF25 Jul 2025View
PROPOSED WEST ELEVATIONDrawing · PDF25 Jul 2025View
EXISTING NORTHEAST & SOUTHWEST ELEVATIONSDrawing · PDF25 Jul 2025View
EXISTING SECTION 2 - NORTH SOUTHDrawing · PDF25 Jul 2025View
PROPOSED NORTHEAST & SOUTHWEST ELEVATIONSDrawing · PDF25 Jul 2025View
ENGAGEMENT SUMMARYOther · PDF30 Jun 2025View
100 VE_DAS_CH5-8Report - Design & Access Statement/Report · PDF30 Jun 2025View
100 VE_DAS_CH1-3Report - Design & Access Statement/Report · PDF30 Jun 2025View
100 VE_DAS_CH4_AReport - Design & Access Statement/Report · PDF30 Jun 2025View
100 VE_DAS_CH4_B (1)Report - Design & Access Statement/Report · PDF30 Jun 2025View
DP9 100 VICTORIA EMBANKMENT PLANNING STATEMENTReport - Planning Statement/Report · PDF30 Jun 2025View
SECURITY PLANNING STATEMENT REV01 V.03Accompanying report · PDF30 Jun 2025View
100VE APPLICATION COVER LETTERCover Letter · PDF30 Jun 2025View
250623 100VE HTVIA - LR_PART2Accompanying report · PDF30 Jun 2025View
APPLICATIONFORMREDACTEDApplication Form · PDF30 Jun 2025View
100 VE_LIGHTING STRATEGY AND CONCEPTOther · PDF30 Jun 2025View
100 VE_SUICIDE PREVENTIONOther · PDF30 Jun 2025View
ENVIRONMENTAL MANAGEMENT PLAN _ REVOther · PDF30 Jun 2025View
250623 100VE HTVIA - LR_PART1Accompanying report · PDF30 Jun 2025View
100VE SUSTAINABLE DESIGN STATEMENTAccompanying report · PDF30 Jun 2025View
FIRE STATEMENT REV02 11TH JUOther · PDF30 Jun 2025View
681809 FRA R01Accompanying report · PDF30 Jun 2025View
1015890-HLE-AC-RP-NOISE IMPACT ASSESSMENT-REV01Report - Acoustic/Noise Report · PDF30 Jun 2025View
20250606 100VE TRANSPORT STATEMENTReport - Transport Statement/Report · PDF30 Jun 2025View
20250606_OUTLINE CLPOther · PDF30 Jun 2025View
EXISTING SITE PLANSite Plan · PDF30 Jun 2025View
PROPOSED SITE PLANSite Plan · PDF30 Jun 2025View
EXISTING SUBBASEMENT PLANDrawing · PDF30 Jun 2025View
EXISTING BASEMENT PLANDrawing · PDF30 Jun 2025View
EXISTING LOWER GROUND PLANDrawing · PDF30 Jun 2025View
EXISTING GROUND FLOOR PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 01 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 02 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 03 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 04 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 05 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 06 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 07 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 08 PLANDrawing · PDF30 Jun 2025View
EXISTING LEVEL 09 PLANDrawing · PDF30 Jun 2025View
EXISTING NORTH ELEVATIONDrawing · PDF30 Jun 2025View
EXISTING SOUTHEAST ELEVATIONDrawing · PDF30 Jun 2025View
EXISTING SECTION 1 - EAST WESTDrawing · PDF30 Jun 2025View
PROPOSED SUBBASEMENT PLANDrawing · PDF30 Jun 2025View
PROPOSED BASEMENT PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 01 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 02 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 03 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 04 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 05 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 06 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 07 PLANDrawing · PDF30 Jun 2025View
PROPOSED LEVEL 08 PLANDrawing · PDF30 Jun 2025View
2025 06 - 100VE CIL FORMOther · PDF30 Jun 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Standard Consultation Date

    Published milestoneCouncil source
  9. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Actual Committee Date

    Published milestoneCouncil source
  11. Decision Issued Date

    Published milestoneCouncil source
  12. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Approved
PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.