Council planning record

Application for non-material amendment under S96A of the Town and Country Planning Act 1990 (as amended) to planning permission 22/00848/FULMAJ dated 21.12.2023 to amend: (i) the wording of Condition 40 to allow for the full-time use of a back-up generator as required by the future tenant; and (ii) Condition 42 (Approved Plans) to allow for amendments to the facade and associated changes at ground, first, eighth, ninth, tenth and twelfth floor levels following further design amendments.

65 Gresham Street London EC2V 7NQ

DecidedReference: 25/00449/NMACity of London Corporation

Last published check: 28 Sept 2026, 15:58. Check the council record for more recent changes.

Application location

65 Gresham Street London EC2V 7NQ

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Non-material Amendments
Received
1 Apr 2025
Validated
14 May 2025
Determination deadline
11 Jun 2025
Local authority
City of London Corporation

Application overview

Application for non-material amendment under S96A of the Town and Country Planning Act 1990 (as amended) to planning permission 22/00848/FULMAJ dated 21.12.2023 to amend: (i) the wording of Condition 40 to allow for the full-time use of a back-up generator as required by the future tenant; and (ii) Condition 42 (Approved Plans) to allow for amendments to the facade and associated changes at ground, first, eighth, ninth, tenth and twelfth floor levels following further design amendments.

Proposal details

Reference
25/00449/NMA
Alternative references
PP-13651490
Ward
Bassishaw
Agent
DP9 Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 50 of 50

DocumentPublishedAction
Officers ReportOfficers Report · PDF10 Jul 2026View
NON-MATERIAL AMENDMENTS TO AN EXISTING PLANNING PERMISSIONDecision · PDF10 Jul 2026View
PROPOSED NORTH ELEVATIONDrawing · PDF8 Jul 2026View
PROPOSED NORTH ELEVATIONDrawing · PDF8 Jul 2026View
COVER LETTERCover Letter · PDF8 Jul 2026View
PROPOSED LEVEL 10 PLANDrawing · PDF8 Jul 2026View
PROPOSED BASEMENT 01 PLANDrawing · PDF8 Jul 2026View
PROPOSED SOUTH ELEVATIONDrawing · PDF8 Jul 2026View
PROPOSED WEST ELEVATIONDrawing · PDF8 Jul 2026View
REPORTAccompanying report · PDF8 Jul 2026View
GROUND FLOOR PLANDrawing · PDF8 Jul 2026View
PROPOSED LEVEL 01 PLANDrawing · PDF8 Jul 2026View
PROPOSED LEVEL 08 PLANDrawing · PDF8 Jul 2026View
PROPOSED LEVEL 12 PLANDrawing · PDF8 Jul 2026View
PROPOSED ALDERMANBURY TYPICAL BAY - LOWER LEVELSDrawing · PDF14 May 2025View
PROPOSED LEVEL 01 PLANDrawing · PDF14 May 2025View
PROPOSED SITE PLANDrawing · PDF14 May 2025View
PROPOSED NORTH ELEVATIONDrawing · PDF14 May 2025View
PROPOSED EAST ELEVATIONDrawing · PDF14 May 2025View
NMA REPORTAccompanying report · PDF14 May 2025View
COVER LETTERCover Letter · PDF14 May 2025View
PROPOSED GROUND FLOOR PLANDrawing · PDF14 May 2025View
PROPOSED LEVEL 12 PLANDrawing · PDF14 May 2025View
PROPOSED BASEMENT 01 PLANDrawing · PDF14 May 2025View
PROPOSED SOUTH ELEVATIONDrawing · PDF14 May 2025View
PROPOSED WEST ELEVATIONDrawing · PDF14 May 2025View
APPLICATIONFORMREDACTEDApplication Form · PDF1 Apr 2025View
DP9 LTD LETTERCover Letter · PDF1 Apr 2025View
21053-65GRESHAM-NMA APPLICATION_P03 (2)_COMPRESSEDAccompanying report · PDF1 Apr 2025View
PROPOSED GROUND FLOOR PLANDrawing · PDF1 Apr 2025View
PROPOSED LEVEL 01 PLANDrawing · PDF1 Apr 2025View
PROPOSED LEVEL 01 PLANDrawing · PDF1 Apr 2025View
PROPOSED LEVEL 12 PLANDrawing · PDF1 Apr 2025View
PROPOSED BASEMENT 01 PLANDrawing · PDF1 Apr 2025View
PROPOSED SITE PLANDrawing · PDF1 Apr 2025View
CIL FORM 1Other · PDF1 Apr 2025View
PROPOSED WEST ELEVATIONDrawing · PDF1 Apr 2025View
PROPOSED NORTH ELEVATIONDrawing · PDF1 Apr 2025View
PROPOSED EAST ELEVATIONDrawing · PDF1 Apr 2025View
PROPOSED SOUTH ELEVATIONDrawing · PDF1 Apr 2025View
PROPOSED WEST ELEVATIONDrawing · PDF1 Apr 2025View
PROPOSED LEVEL 12 PLANDrawing · PDF1 Apr 2025View
PROPOSED BASEMENT 01 PLANDrawing · PDF1 Apr 2025View
PROPOSED SITE PLANDrawing · PDF1 Apr 2025View
PROPOSED GROUND FLOOR PLANDrawing · PDF1 Apr 2025View
PROPOSED ALDERMANBURY TYPICAL BAY - LOWER LEVELSDrawing · PDF1 Apr 2025View
PROPOSED ALDERMANBURY TYPICAL BAY - LOWER LEVELSDrawing · PDF1 Apr 2025View
PROPOSED NORTH ELEVATIONDrawing · PDF1 Apr 2025View
PROPOSED EAST ELEVATIONDrawing · PDF1 Apr 2025View
PROPOSED SOUTH ELEVATIONDrawing · PDF1 Apr 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Actual Committee Date

    Published milestoneCouncil source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Approved
NON-MATERIAL AMENDMENTS TO AN EXISTING PLANNING PERMISSION
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.