ApprovedCouncil status: Decided

Submission of details of: particulars and samples of the materials to be used on all external and semi-external faces of the building and surface treatments in areas where the public would have access, including external ground and upper-level surfaces, including details of compliance with approved Circular Economy Strategy; proposed new facades and roofs (including details of typical bays of the development for each facade and fenestration); canopies including soffits and jointing; key junction types and junctions across the building (including: thermal sawtooth facade; public space interfaces ; roof and facade interfaces); the Cycling Hub entrance and lobby (external and internal design including all elevations, entrances, fenestration, lighting, signage and any infrastructure required to deliver the proposed use); full details of the Social Lobby entrance and lobby (external and internal design including all elevations, entrances, fenestration, planters, seating, lighting, signage and any infrastructure required to deliver the proposed use); soffits, handrails and balustrades; the integration of window cleaning equipment and the garaging thereof, plant, flues, and other excrescences at roof level (including within the plant room); the integration of M&E in all external and semi-external public elevations (in the podium from ground to garden level); all ground floor service entrances pursuant to conditions 46 a, b, c (in part), d (in part), i, j, k, m, n, o and q, of planning permission 20/00869/FULEIA, dated 19 August 2021.

2-3 Finsbury Avenue London EC2M 2PF

City of London CorporationReference 25/00404/MDCSubmission of details (Planning)

Last published check: 12 Nov 2026, 12:37. Check the council record for more recent changes.

Status and dates

Last published check: 12 Nov 2026, 12:37 (UK)

  1. DoneReceived20 Mar 2025
  2. DoneValidated20 Mar 2025
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date15 May 2025
  5. DecidedApproved17 Mar 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (7)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Actual Committee Date

    Published milestoneCouncil source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
Application type
Submission of details (Planning)
Ward
Bishopsgate
Documents
220 published

Proposal

Submission of details of: particulars and samples of the materials to be used on all external and semi-external faces of the building and surface treatments in areas where the public would have access, including external ground and upper-level surfaces, including details of compliance with approved Circular Economy Strategy; proposed new facades and roofs (including details of typical bays of the development for each facade and fenestration); canopies including soffits and jointing; key junction types and junctions across the building (including: thermal sawtooth facade; public space interfaces ; roof and facade interfaces); the Cycling Hub entrance and lobby (external and internal design including all elevations, entrances, fenestration, lighting, signage and any infrastructure required to deliver the proposed use); full details of the Social Lobby entrance and lobby (external and internal design including all elevations, entrances, fenestration, planters, seating, lighting, signage and any infrastructure required to deliver the proposed use); soffits, handrails and balustrades; the integration of window cleaning equipment and the garaging thereof, plant, flues, and other excrescences at roof level (including within the plant room); the integration of M&E in all external and semi-external public elevations (in the podium from ground to garden level); all ground floor service entrances pursuant to conditions 46 a, b, c (in part), d (in part), i, j, k, m, n, o and q, of planning permission 20/00869/FULEIA, dated 19 August 2021.

Reference
25/00404/MDC
Alternative references
PP-13871985
Ward
Bishopsgate
Agent
DP9

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Officers ReportOfficers Report17 Mar 2026View
  • APPROVAL OF SUBMISSION OF DETAILSDecision17 Mar 2026View
  • DOCUMENT REGISTER MAY 2025Drawings Schedule2 Feb 2026View
  • AMENDED COVER LETTERCover Letter3 Jun 2025View
  • APPLICATION AMENDMENT OVERVIEWOther22 May 2025View
  • LIGHTING ARRANGEMENT LEVEL 0 FLOOR PLAN 2 OF 2Withdrawn drawing20 Mar 2025View
  • CONDITION 46 - DETAILS - MATERIALITY PACKAccompanying report20 Mar 2025View
  • GEOMETRY DEFINITION LEVEL 39 UPPER ROOF PLANDrawing20 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
APPROVAL OF SUBMISSION OF DETAILS

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.