Council planning record

External and internal alterations to facilitate the use of the building as an apart-hotel (Class C1), including: (i) remodelling and extensions at fourth and fifth floor levels; (ii) erection of a plant room at sixth floor level; (iii) removal of one ground floor retail unit to provide enlarged reception area; (iv) demolition of modern partitions on the upper floors; (v) new rationalised central staircase, secondary escape stair and accessible lift to serve all floors; and (vi) and other associated works.

Albert Buildings 49 Queen Victoria Street London EC4N 4SA

DecidedReference: 25/00347/LBCCity of London Corporation

Last published check: 28 Sept 2026, 16:04. Check the council record for more recent changes.

Application location

Albert Buildings 49 Queen Victoria Street London EC4N 4SA

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Listed Building Consent
Received
12 Mar 2025
Validated
12 Mar 2025
Determination deadline
7 May 2025
Local authority
City of London Corporation

Application overview

External and internal alterations to facilitate the use of the building as an apart-hotel (Class C1), including: (i) remodelling and extensions at fourth and fifth floor levels; (ii) erection of a plant room at sixth floor level; (iii) removal of one ground floor retail unit to provide enlarged reception area; (iv) demolition of modern partitions on the upper floors; (v) new rationalised central staircase, secondary escape stair and accessible lift to serve all floors; and (vi) and other associated works.

Proposal details

Reference
25/00347/LBC
Alternative references
PP-13835783
Ward
Cordwainer
Agent
Rolfe Judd Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 122 of 122

DocumentPublishedAction
LISTED BUILDING CONSENT (CONDITIONAL)Decision · PDF24 Jun 2026View
Officers ReportOfficers Report · PDF24 Jun 2026View
ROOF FLOOR DEMOLITIONS 2314-EMR-AB-R1-AP-A-70109_PL03Drawing · PDF23 Jun 2026View
THIRD FLOOR PLAN 2314-EMR-AB-03-AP-A-02105_PL05Drawing · PDF23 Jun 2026View
SIXTH FLOOR PLAN 2314-EMR-AB-06-AP-A-02108_PL02Drawing · PDF23 Jun 2026View
ROOF FLOOR PLAN 2314-EMR-AB-R1-AP-A-02109_PL02Drawing · PDF23 Jun 2026View
SECTION A - A 2314-EMR-AB-ZZ-AP-A-04101_PL02Drawing · PDF23 Jun 2026View
ELEVATION 01 2314-EMR-AB-ZZ-AP-A-05101_PL03Drawing · PDF23 Jun 2026View
ELEVATION 02 2314-EMR-AB-ZZ-AP-A-05102_PL02Drawing · PDF23 Jun 2026View
ELEVATION 03 2314-EMR-AB-ZZ-AP-A-05103_PL02Drawing · PDF23 Jun 2026View
ELEVATIONS 04, 05, 06 2314-EMR-AB-ZZ-AP-A-05104_PL03Drawing · PDF23 Jun 2026View
EXISTING FOURTH FLOOR PLAN 2314-EMR-AB-04-AP-A-00106_PL02Drawing · PDF23 Jun 2026View
EXISTING FIFTH FLOOR PLAN 2314-EMR-AB-05-AP-A-00107_PL02Drawing · PDF23 Jun 2026View
EXISTING SIXTH FLOOR PLAN 2314-EMR-AB-06-AP-A-00108_PL02Drawing · PDF23 Jun 2026View
EXISTING GROUND FLOOR PLAN 2314-EMR-AB-00-AP-A-40102_PL03Drawing · PDF23 Jun 2026View
EXISTING FOURTH FLOOR PLAN 2314-EMR-AB-04-AP-A-40106_PL04Drawing · PDF23 Jun 2026View
EXISTING FIFTH FLOOR PLAN 2314-EMR-AB-05-AP-A-40107_PL03Drawing · PDF23 Jun 2026View
PROPOSED GROUND FLOOR PLAN 2314-EMR-AB-00-AP-A-40110_PL03Drawing · PDF23 Jun 2026View
PROPOSED FIRST FLOOR PLAN 2314-EMR-AB-01-AP-A-40111_PL04Drawing · PDF23 Jun 2026View
PROPOSED SECOND FLOOR PLAN 2314-EMR-AB-02-AP-A-40112_PL04Drawing · PDF23 Jun 2026View
PROPOSED FOURTH FLOOR PLAN 2314-EMR-AB-04-AP-A-40114_PL03Drawing · PDF23 Jun 2026View
PROPOSED FIRST FLOOR CEILING MARK-UP 2314-EMR-AB-01-AP-A-41102_PL03Drawing · PDF23 Jun 2026View
PROPOSED SECOND FLOOR CEILING MARK-UP 2314-EMR-AB-02-AP-A-41103_PL03Drawing · PDF23 Jun 2026View
PROPOSED THIRD FLOOR CEILING MARK-UP 2314-EMR-AB-03-AP-A-41104_PL03Drawing · PDF23 Jun 2026View
PROPOSED FOURTH FLOOR CEILING MARK-UP 2314-EMR-AB-04-AP-A-41105_PL02Drawing · PDF23 Jun 2026View
PROPOSED FIFTH FLOOR CEILING MARK-UP 2314-EMR-AB-05-AP-A-41106_PL02Drawing · PDF23 Jun 2026View
EXISTING FIFTH FLOOR PLAN 2314-EMR-AB-05-AP-A-42107_PL01Drawing · PDF23 Jun 2026View
PROPOSED GROUND FLOOR PLAN 2314-EMR-AB-00-AP-A-42110_PL02Drawing · PDF23 Jun 2026View
PROPOSED FIRST FLOOR PLAN 2314-EMR-AB-01-AP-A-42111_PL02Drawing · PDF23 Jun 2026View
PROPOSED SECOND FLOOR PLAN 2314-EMR-AB-02-AP-A-42112_PL02Drawing · PDF23 Jun 2026View
PROPOSED THIRD FLOOR PLAN 2314-EMR-AB-03-AP-A-42113_PL02Drawing · PDF23 Jun 2026View
FLOOR INSPECTION REPORTOther · PDF23 Jun 2026View
CEILING AND WINDOW RELATIONSHIPSOther · PDF23 Jun 2026View
SECTION B - B 2314-EMR-AB-ZZ-AP-A-04102_PL02Drawing · PDF23 Jun 2026View
SECTION D ? D 2314-EMR-AB-ZZ-AP-A-04103_PL02Drawing · PDF23 Jun 2026View
SECTION E ? E 2314-EMR-AB-ZZ-AP-A-04104_PL02Drawing · PDF23 Jun 2026View
EXISTING SECOND FLOOR PLAN 2314-EMR-AB-02-AP-A-00104_PL02Drawing · PDF23 Jun 2026View
EXISTING THIRD FLOOR PLAN 2314-EMR-AB-03-AP-A-00105_PL02Drawing · PDF23 Jun 2026View
EXISTING FIRST FLOOR PLAN 2314-EMR-AB-01-AP-A-40103_PL03Drawing · PDF23 Jun 2026View
EXISTING THIRD FLOOR PLAN 2314-EMR-AB-03-AP-A-40105_PL04Drawing · PDF23 Jun 2026View
TFS FIRE REVIEWOther · PDF23 Jun 2026View
CEILING BUILD UP SECTIONSOther · PDF23 Jun 2026View
SECOND FLOOR DEMOLITIONS 2314-EMR-AB-02-AP-A-70104_PL02Drawing · PDF23 Jun 2026View
THIRD FLOOR DEMOLITIONS 2314-EMR-AB-03-AP-A-70105_PL02Drawing · PDF23 Jun 2026View
PROPOSED GROUND FLOOR CEILING MARK-UP 2314-EMR-AB-00-AP-A-41101_PL02Drawing · PDF23 Jun 2026View
FLOOR BY FLOOR AND ROOM BY ROOM HERITAGE SURVEYOther · PDF23 Jun 2026View
SHOPFRONTS AND TENANCY DETAILSOther · PDF23 Jun 2026View
BASEMENT FLOOR DEMOLITIONS 2314-EMR-AB-B1-AP-A-70101_PL02Drawing · PDF23 Jun 2026View
GROUND FLOOR DEMOLITIONS 2314-EMR-AB-GF-AP-A-70102_PL02Drawing · PDF23 Jun 2026View
FIRST FLOOR DEMOLITIONS 2314-EMR-AB-01-AP-A-70103_PL02Drawing · PDF23 Jun 2026View
FOURTH FLOOR DEMOLITIONS 2314-EMR-AB-04-AP-A-70106_PL02Drawing · PDF23 Jun 2026View
FIFTH FLOOR DEMOLITIONS 2314-EMR-AB-05-AP-A-70107_PL03Drawing · PDF23 Jun 2026View
SIXTH FLOOR DEMOLITIONS 2314-EMR-AB-06-AP-A-70108_PL02Drawing · PDF23 Jun 2026View
BASEMENT FLOOR PLAN 2314-EMR-AB-B1-AP-A-02101_PL02Drawing · PDF23 Jun 2026View
GROUND FLOOR PLAN 2314-EMR-AB-GF-AP-A-02102_PL04Drawing · PDF23 Jun 2026View
FIRST FLOOR PLAN 2314-EMR-AB-01-AP-A-02103_PL05Drawing · PDF23 Jun 2026View
SECOND FLOOR PLAN 2314-EMR-AB-02-AP-A-02104_PL05Drawing · PDF23 Jun 2026View
FOURTH FLOOR PLAN 2314-EMR-AB-04-AP-A-02106_PL03Drawing · PDF23 Jun 2026View
FIFTH FLOOR PLAN 2314-EMR-AB-05-AP-A-02107_PL03Drawing · PDF23 Jun 2026View
EXISTING BASEMENT FLOOR PLAN 2314-EMR-AB-B1-AP-A-00101_PL02Drawing · PDF23 Jun 2026View
EXISTING GROUND FLOOR PLAN 2314-EMR-AB-GF-AP-A-00102_PL02Drawing · PDF23 Jun 2026View
EXISTING FIRST FLOOR PLAN 2314-EMR-AB-01-AP-A-00103_PL02Drawing · PDF23 Jun 2026View
EXISTING ROOF PLAN 2314-EMR-AB-R1-AP-A-00109_PL02Drawing · PDF23 Jun 2026View
EXISTING ELEVATION 01 2314-EMR-AB-ZZ-AP-A-00110_PL02Drawing · PDF23 Jun 2026View
EXISTING ELEVATION 02 2314-EMR-AB-ZZ-AP-A-00111_PL02Drawing · PDF23 Jun 2026View
EXISTING ELEVATION 03 2314-EMR-AB-ZZ-AP-A-00112_PL02Drawing · PDF23 Jun 2026View
EXISTING LIGHTWELL ELEVATIONS 04, 05, 06 2314-EMR-AB-ZZ-AP-A-00113_PL02Drawing · PDF23 Jun 2026View
EXISTING SECTION A - A 2314-EMR-AB-ZZ-AP-A-00114_PL02Drawing · PDF23 Jun 2026View
EXISTING SECTION B - B 2314-EMR-AB-ZZ-AP-A-00115_PL02Drawing · PDF23 Jun 2026View
EXISTING SECTION D - D 2314-EMR-AB-ZZ-AP-A-00116_PL02Drawing · PDF23 Jun 2026View
EXISTING SECTION E - E 2314-EMR-AB-ZZ-AP-A-00117_PL02Drawing · PDF23 Jun 2026View
SITE ACCESS PLAN 2314-EMR-AB-ZZ-AP-A-01102_PL02Drawing · PDF23 Jun 2026View
SITE LOCATION PLAN 2314-EMR-AB-ZZ-AP-A-01101-PL01Drawing · PDF23 Jun 2026View
76 SPACE PLANS - RIGHT HAND TRANSFER ROOM 2314-EMR-AB-ZZ-AP-A-76201_PL02Drawing · PDF23 Jun 2026View
76 SPACE PLANS - LEFT HAND TRANSFER ROOM 2314-EMR-AB-ZZ-AP-A-76202_PL02Drawing · PDF23 Jun 2026View
EXISTING SECOND FLOOR PLAN 2314-EMR-AB-02-AP-A-40104_PL03Drawing · PDF23 Jun 2026View
PROPOSED THIRD FLOOR PLAN 2314-EMR-AB-03-AP-A-40113_PL05Drawing · PDF23 Jun 2026View
PROPOSED FIFTH FLOOR PLAN 2314-EMR-AB-05-AP-A-40115_PL03Drawing · PDF23 Jun 2026View
EXISTING GROUND FLOOR PLAN 2314-EMR-AB-00-AP-A-42102_PL01Drawing · PDF23 Jun 2026View
EXISTING FIRST FLOOR PLAN 2314-EMR-AB-01-AP-A-42103_PL01Drawing · PDF23 Jun 2026View
EXISTING SECOND FLOOR PLAN 2314-EMR-AB-02-AP-A-42104_PL01Drawing · PDF23 Jun 2026View
EXISTING THIRD FLOOR PLAN 2314-EMR-AB-03-AP-A-42105_PL01Drawing · PDF23 Jun 2026View
EXISTING FOURTH FLOOR PLAN 2314-EMR-AB-04-AP-A-42106_PL01Drawing · PDF23 Jun 2026View
PROPOSED FOURTH FLOOR PLAN 2314-EMR-AB-04-AP-A-42114_PL02Drawing · PDF23 Jun 2026View
PROPOSED FIFTH FLOOR PLAN 2314-EMR-AB-05-AP-A-42115_PL02Drawing · PDF23 Jun 2026View
AKERA STRUCTURAL REPORTOther · PDF23 Jun 2026View
TFS HERITAGE CAPABILITY STATEMENTOther · PDF23 Jun 2026View
LETTERAccompanying letters · PDF11 Jun 2026View
ADDENDUM HERITAGE REPORT RE FIRE SAFETYAccompanying letters · PDF7 Apr 2026View
FIRE SAFETY REVIEW OF STRUCTURAL FIREAccompanying report · PDF7 Apr 2026View
COMMENTS - HISTORIC ENGLANDConsultee Comment · PDF22 Jan 2026View
COMMENTS - HISTORIC ENGLANDConsultee Comment · PDF21 Jan 2026View
COMMENTS - HISTORIC ENGLANDConsultee Comment · PDF16 Jan 2026View
ALBERT BUILDINGS - MARKETING REPORTOther · PDF12 Mar 2025View
ALBERT BUILDINGS - NOISE ASSESSMENT REPORTReport - Acoustic/Noise Report · PDF12 Mar 2025View
ALBERT BUILDINGS - OUTLINE CONSTRUCTION LOGISTICS PLANOther · PDF12 Mar 2025View
ALBERT BUILDINGS - OUTLINE DELIVERY AND SERVICING PLANOther · PDF12 Mar 2025View
ALBERT BUILDINGS - PLANT NOISE ASSESSMENT REPORTReport - Acoustic/Noise Report · PDF12 Mar 2025View
ALBERT BUILDINGS - TRANSPORT STATEMENTReport - Transport Statement/Report · PDF12 Mar 2025View
ALBERT BUILDINGS - VIABILITY REPORTOther · PDF12 Mar 2025View
ENERGY STRATEGY - APPENDIX 1 - AS BUILT BRUKLOther · PDF12 Mar 2025View
ENERGY STRATEGY - APPENDIX 1 - AS BUILT EPCOther · PDF12 Mar 2025View
ENERGY STRATEGY - APPENDIX 2 - BE LEAN BRUKLOther · PDF12 Mar 2025View
APPLICATIONFORMREDACTEDApplication Form · PDF12 Mar 2025View
ENERGY STRATEGY -APPENDIX 2 - BE LEAN EPCOther · PDF12 Mar 2025View
ALBERT BUILDINGS - ENERGY STATEMENTOther · PDF12 Mar 2025View
ALBERT BUILDINGS - HERITAGE STATEMENT - PT 1Accompanying report · PDF12 Mar 2025View
ALBERT BUILDINGS - HERITAGE STATEMENT - PT 2Accompanying report · PDF12 Mar 2025View
ALBERT BUILDINGS - PLANNING STATEMENTReport - Planning Statement/Report · PDF12 Mar 2025View
2314-RP-0004-DESIGN ACCESS STATEMENT_PL01_PART8Report - Design & Access Statement/Report · PDF12 Mar 2025View
2314-RP-0004-DESIGN ACCESS STATEMENT_PL01_PART9Report - Design & Access Statement/Report · PDF12 Mar 2025View
2314-RP-0004-DESIGN ACCESS STATEMENT_PL01_PART10Report - Design & Access Statement/Report · PDF12 Mar 2025View
2314-RP-0004-DESIGN ACCESS STATEMENT_PL01_PART1Report - Design & Access Statement/Report · PDF12 Mar 2025View
2314-RP-0004-DESIGN ACCESS STATEMENT_PL01_PART2Report - Design & Access Statement/Report · PDF12 Mar 2025View
2314-RP-0004-DESIGN ACCESS STATEMENT_PL01_PART3Report - Design & Access Statement/Report · PDF12 Mar 2025View
2314-RP-0004-DESIGN ACCESS STATEMENT_PL01_PART4Report - Design & Access Statement/Report · PDF12 Mar 2025View
2314-RP-0004-DESIGN ACCESS STATEMENT_PL01_PART5Report - Design & Access Statement/Report · PDF12 Mar 2025View
2314-RP-0004-DESIGN ACCESS STATEMENT_PL01_PART7Report - Design & Access Statement/Report · PDF12 Mar 2025View
ENERGY STRATEGY -APPENDIX 3-EPC BOther · PDF12 Mar 2025View
ENERGY STRATEGY -APPENDIX 3-EPC B-BRUKLOther · PDF12 Mar 2025View
2314-RP-0004-DESIGN ACCESS STATEMENT_PL01_PART6 - COMPRESSEDReport - Design & Access Statement/Report · PDF12 Mar 2025View
ALBERT BUILDINGS - CIL FORMOther · PDF12 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Standard Consultation Date

    Published milestoneCouncil source
  9. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Actual Committee Date

    Published milestoneCouncil source
  11. Decision Issued Date

    Published milestoneCouncil source
  12. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Approved
LISTED BUILDING CONSENT (CONDITIONAL)

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.