ApprovedCouncil status: Decided

Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (repairs required to the riverwall and the Lions Head Piers where the Lions Head Piers have been raised) pursuant to BLABF 11, BLABF 12 and BLABF 13 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

City of London CorporationReference 24/00784/TTTThames Tideway Tunnel

Last published check: 13 Nov 2026, 04:35. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 13 Nov 2026, 04:35 (UK)

  1. DoneReceived22 Jul 2024
  2. DoneValidated22 Jul 2024
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date16 Sept 2024
  5. DecidedApproved6 Dec 2024

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (10)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Actual Committee Date

    Published milestoneCouncil source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
Application type
Thames Tideway Tunnel
Ward
Castle Baynard
Documents
8 published

Proposal

Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (repairs required to the riverwall and the Lions Head Piers where the Lions Head Piers have been raised) pursuant to BLABF 11, BLABF 12 and BLABF 13 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

Reference
24/00784/TTT
Alternative references
PP-13241022
Ward
Castle Baynard
Agent
Ferrovial Agroman Laing O'Rourke Joint Venture (FLo)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Officers ReportOfficers Report6 Dec 2024View
  • APPROVAL OF SUBMISSION UNDER SCHEDULE 3 OF ARTICLE 3 OF THE ABOVE ORDERDecision6 Dec 2024View
  • COMMENTS - HISTORIC ENGLANDConsultee Comment12 Nov 2024View
  • SOUTH ELEVATION EMBANKMENT WALL LIONS HEAD PIER INDENT DETAIL SHEET 2Drawing22 Jul 2024View
  • SOUTH ELEVATION EMBANKMENT WALL LIONS HEAD PIER INDENT DETAIL SHEET 1Drawing22 Jul 2024View
  • APPLICATIONFORMREDACTEDApplication Form22 Jul 2024View
  • COVER LETTERCover Letter22 Jul 2024View
  • SOUTH ELEVATION EMBANKMENT WALL LIONS HEAD PIER INDENT DETAIL SHEET 3Drawing22 Jul 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
APPROVAL OF SUBMISSION UNDER SCHEDULE 3 OF ARTICLE 3 OF THE ABOVE ORDER
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.