Internal and external alterations to East Wing in relation to providing a specialist breast cancer treatment centre, including (i) post-operative recovery wards and day patient areas on first and second floors; (ii) dismantling of existing facade to facilitate connection to a glazed link bridge; (iii) internal structural reinforcement, (iv) internal fire sprinkler system; (v) internally enhanced ground floor entrance; (vi) louvres to rear of building; (vii) replacement internal oak doors; and (viii) replacement timber external doorset.
East Wing St Bartholomews Hospital West Smithfield London EC1A 7BE
Internal and external alterations to East Wing in relation to providing a specialist breast cancer treatment centre, including (i) post-operative recovery wards and day patient areas on first and second floors; (ii) dismantling of existing facade to facilitate connection to a glazed link bridge; (iii) internal structural reinforcement, (iv) internal fire sprinkler system; (v) internally enhanced ground floor entrance; (vi) louvres to rear of building; (vii) replacement internal oak doors; and (viii) replacement timber external doorset.
Reference
24/00721/LBC
Alternative references
PP-13191969
Ward
Farringdon Without
Agent
WSP in the UK
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.