ApprovedCouncil status: Decided

Submission of details of (a) The level of noise emitted from any new plant shall be lower than the existing background level by at least 10 dBA. Noise levels shall be determined at one metre from the window of the most affected noise sensitive premises. The background noise level shall be expressed as the lowest LA90 (10 minutes) during which the plant is or may be in operation; (b) Within three months of the date of this decision, measurements of noise from the new plant must be taken and a report demonstrating that the plant as installed meets the design requirements shall be submitted to and approved in writing by the Local Planning Authority; and (c) All constituent parts of the new plant shall be maintained and replaced in whole or in part as often is required to ensure compliance with the noise levels approved by the Local Planning Authority pursuant to condition 3 of planning permission 23/01007/FULL dated 01/11/2023.

180 Fleet Street London EC4A 2HG

City of London CorporationReference 24/00050/MDCSubmission of details (Planning)

Last published check: 13 Nov 2026, 11:47. Check the council record for more recent changes.

Status and dates

Last published check: 13 Nov 2026, 11:47 (UK)

  1. DoneReceived18 Jan 2024
  2. DoneValidated18 Jan 2024
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date14 Mar 2024
  5. DecidedApproved1 Mar 2024

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (10)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Actual Committee Date

    Published milestoneCouncil source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Submission of details (Planning)
Ward
Farringdon Without
Documents
5 published

Proposal

Submission of details of (a) The level of noise emitted from any new plant shall be lower than the existing background level by at least 10 dBA. Noise levels shall be determined at one metre from the window of the most affected noise sensitive premises. The background noise level shall be expressed as the lowest LA90 (10 minutes) during which the plant is or may be in operation; (b) Within three months of the date of this decision, measurements of noise from the new plant must be taken and a report demonstrating that the plant as installed meets the design requirements shall be submitted to and approved in writing by the Local Planning Authority; and (c) All constituent parts of the new plant shall be maintained and replaced in whole or in part as often is required to ensure compliance with the noise levels approved by the Local Planning Authority pursuant to condition 3 of planning permission 23/01007/FULL dated 01/11/2023.

Reference
24/00050/MDC
Alternative references
PP-12694344
Ward
Farringdon Without
Agent
Carter Jonas

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • APPROVAL OF SUBMISSION OF DETAILSDecision1 Mar 2024View
  • OFFICER REPORTOfficers Report1 Mar 2024View
  • Application FormApplication Form18 Jan 2024View
  • NOISE ASSESSMENT REPORTReport - Acoustic/Noise Report18 Jan 2024View
  • COVER LETTERCover Letter18 Jan 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
APPROVAL OF SUBMISSION OF DETAILS
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.