Submission of details of (a) The level of noise emitted from any new plant shall be lower than the existing background level by at least 10 dBA. Noise levels shall be determined at one metre from the window of the most affected noise sensitive premises. The background noise level shall be expressed as the lowest LA90 (10 minutes) during which the plant is or may be in operation; (b) Within three months of the date of this decision, measurements of noise from the new plant must be taken and a report demonstrating that the plant as installed meets the design requirements shall be submitted to and approved in writing by the Local Planning Authority; and (c) All constituent parts of the new plant shall be maintained and replaced in whole or in part as often is required to ensure compliance with the noise levels approved by the Local Planning Authority pursuant to condition 3 of planning permission 23/01007/FULL dated 01/11/2023.
Submission of details of (a) The level of noise emitted from any new plant shall be lower than the existing background level by at least 10 dBA. Noise levels shall be determined at one metre from the window of the most affected noise sensitive premises. The background noise level shall be expressed as the lowest LA90 (10 minutes) during which the plant is or may be in operation; (b) Within three months of the date of this decision, measurements of noise from the new plant must be taken and a report demonstrating that the plant as installed meets the design requirements shall be submitted to and approved in writing by the Local Planning Authority; and (c) All constituent parts of the new plant shall be maintained and replaced in whole or in part as often is required to ensure compliance with the noise levels approved by the Local Planning Authority pursuant to condition 3 of planning permission 23/01007/FULL dated 01/11/2023.
Reference
24/00050/MDC
Alternative references
PP-12694344
Ward
Farringdon Without
Agent
Carter Jonas
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.