ApprovedCouncil status: Decided

Refurbishment of the kitchen, utility room, bathroom and separate shower/WC. Alteration of non-structural internal walls and doors and associated frames reconfiguring the layout to create opening onto living room within the same layout. A shallow false ceiling to be fitted throughout, excluding the entrance hall, enabling instillation of spot ligthting.

252 Shakespeare Tower Barbican London EC2Y 8DR

City of London CorporationReference 24/00006/LBCListed Building Consent

Last published check: 13 Nov 2026, 11:29. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 13 Nov 2026, 11:29 (UK)

  1. DoneReceived3 Jan 2024
  2. DoneValidated29 Jan 2024
  3. ClosedConsultationEnded 22 Feb 2024
  4. Date set by councilTarget decision date25 Mar 2024
  5. DecidedApproved15 Apr 2024

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (12)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Actual Committee Date

    Published milestoneCouncil source
  9. Decision Issued Date

    Published milestoneCouncil source
  10. Decision Made Date

    Published milestoneCouncil source
Application type
Listed Building Consent
Ward
Aldersgate
Documents
18 published

Proposal

Refurbishment of the kitchen, utility room, bathroom and separate shower/WC. Alteration of non-structural internal walls and doors and associated frames reconfiguring the layout to create opening onto living room within the same layout. A shallow false ceiling to be fitted throughout, excluding the entrance hall, enabling instillation of spot ligthting.

Reference
24/00006/LBC
Alternative references
PP-12708225
Ward
Aldersgate
Agent
Thomson Brothers (London) Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • OFFICER REPORTOfficers Report15 Apr 2024View
  • LISTED BUILDING CONSENT (CONDITIONAL)Decision15 Apr 2024View
  • LOCATION PLANSite Plan29 Jan 2024View
  • SHAKESPEARE TOWER LOCATION ON 25TH FLOORDrawing29 Jan 2024View
  • EXISTING AND PROPOSEDDrawing26 Jan 2024View
  • EXISTING AND PROPOSEDDrawing3 Jan 2024View
  • EXISTING AND PROPOSEDDrawing3 Jan 2024View
  • EXISTING AND PROPOSEDDrawing3 Jan 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
LISTED BUILDING CONSENT (CONDITIONAL)
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.