ApprovedCouncil status: Decided

Demolition of the existing buildings, retention and partial expansion of existing basement plus construction of a ground, plus 73 storey building (plus plant) for office use (Use Class E(g)); Retail/food and beverage (Use Class E(a)-(b)); Public amenity space (Flexible Class E(a)-(d) / Class F1 / Sui Generis); publicly accessible education space and viewing gallery at levels 72 and 73 (Sui Generis); public cycle hub (Sui Generis); plus podium garden at level 11, installation of a digital screen, public realm improvement works, ancillary basement cycle parking, servicing, plant, highway works and other works associated with the proposed development.

1 Undershaft London EC3A 8EE

City of London CorporationReference 23/01423/FULEIAFull Planning Permission with EIA

Last published check: 13 Nov 2026, 12:04. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 13 Nov 2026, 12:04 (UK)

  1. DoneReceived27 Dec 2023
  2. DoneValidated10 Jan 2024
  3. ClosedConsultationEnded 15 Feb 2024
  4. Date set by councilTarget decision date1 May 2024
  5. DecidedApproved23 Dec 2025

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (16)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Last Advertised In Press Date

    Published milestoneCouncil source
  7. Standard Consultation Date

    Published milestoneCouncil source
  8. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  12. Actual Committee Date

    Published milestoneCouncil source
  13. Decision Issued Date

    Published milestoneCouncil source
  14. Decision Made Date

    Published milestoneCouncil source
Application type
Full Planning Permission with EIA
Ward
Lime Street
Documents
434 published

Proposal

Demolition of the existing buildings, retention and partial expansion of existing basement plus construction of a ground, plus 73 storey building (plus plant) for office use (Use Class E(g)); Retail/food and beverage (Use Class E(a)-(b)); Public amenity space (Flexible Class E(a)-(d) / Class F1 / Sui Generis); publicly accessible education space and viewing gallery at levels 72 and 73 (Sui Generis); public cycle hub (Sui Generis); plus podium garden at level 11, installation of a digital screen, public realm improvement works, ancillary basement cycle parking, servicing, plant, highway works and other works associated with the proposed development.

Reference
23/01423/FULEIA
Alternative references
PP-12671574
Ward
Lime Street
Agent
DP9 Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • S106 AGREEMENTS106 Agreement5 Jan 2026View
  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)Decision23 Dec 2025View
  • STATEMENTOther23 Dec 2025View
  • LETTER FROM SECRETARY OF STATECorrespondence In15 Dec 2025View
  • LETTER FROM GREATER LONDON AUTHORITYCorrespondence In24 Nov 2025View
  • GLA 2024.0128 1 UNDERSHAFT STAGE 2 REPORTAccompanying report24 Nov 2025View
  • DRAFT S106 AGREEMENTS106 Agreement12 Nov 2025View
  • COMMENTS - ISLINGTONConsultee Comment20 Jan 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.