ApprovedCouncil status: Decided

Submission of detailed design and construction method statements for all of the ground floor structures, foundations and basements and for any other structures below ground level, including piling, any other temporary or permanent installations and for site investigations; method statements to include arrangements to secure that, during any period when development construction is taking place and thereafter upon completion and occupation of the development the planned completion of Crossrail, and the planned Operation and Maintenance of Crossrail shall not be disrupted; detailed design and method statements for activities that are directly above the Metropolitan Line or within the exclusion zone (tunnel protection zone), (in consultation with London Underground); a scheme for protecting nearby residents and commercial occupiers from noise, dust and other environmental effects; and details of the foundations and piling configuration, to include a detailed design and method statement to show the preservation of surviving archaeological remains which are to remain in situ pursuant to conditions 2, 3, 4, 6 and 14 of planning permission 21/00683/FULL dated 25/02/2022.

Finsbury Circus Gardens Finsbury Circus London EC2M 7DT

City of London CorporationReference 23/01167/MDCSubmission of details (Planning)

Last published check: 13 Nov 2026, 15:07. Check the council record for more recent changes.

Status and dates

Last published check: 13 Nov 2026, 15:07 (UK)

  1. DoneReceived26 Oct 2023
  2. DoneValidated26 Oct 2023
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date21 Dec 2023
  5. DecidedApproved17 Jan 2024

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (10)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Actual Committee Date

    Published milestoneCouncil source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
Application type
Submission of details (Planning)
Ward
Coleman Street
Documents
27 published

Proposal

Submission of detailed design and construction method statements for all of the ground floor structures, foundations and basements and for any other structures below ground level, including piling, any other temporary or permanent installations and for site investigations; method statements to include arrangements to secure that, during any period when development construction is taking place and thereafter upon completion and occupation of the development the planned completion of Crossrail, and the planned Operation and Maintenance of Crossrail shall not be disrupted; detailed design and method statements for activities that are directly above the Metropolitan Line or within the exclusion zone (tunnel protection zone), (in consultation with London Underground); a scheme for protecting nearby residents and commercial occupiers from noise, dust and other environmental effects; and details of the foundations and piling configuration, to include a detailed design and method statement to show the preservation of surviving archaeological remains which are to remain in situ pursuant to conditions 2, 3, 4, 6 and 14 of planning permission 21/00683/FULL dated 25/02/2022.

Reference
23/01167/MDC
Alternative references
PP-12554688
Ward
Coleman Street
Agent
Tibbalds Planning and Urban Design

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • OFFICER'S REPORTOfficers Report17 Jan 2024View
  • DECISIONDecision17 Jan 2024View
  • CONSTRUCTION PHASE PLAN C0928 ? FINSBURY CIRCUS GARDENSAccompanying report21 Dec 2023View
  • METHOD STATEMENT (004) GROUND WORKSAccompanying report21 Dec 2023View
  • METHOD STATEMENT (005) PAVING WORKSAccompanying report21 Dec 2023View
  • COMMENTS - HISTORIC ENGLANDConsultee Comment27 Nov 2023View
  • COMMENTS-TRANSPORT FOR LONDONConsultee Comment24 Nov 2023View
  • COMMENTS - TRANSPORT FOR LONDONConsultee Comment24 Nov 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
DECISION

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.