ApprovedCouncil status: Decided

Installation and display of: (i) Externally illuminated fascia signage measuring 1.9m in width, 0.3m in height, at a height above ground of 2.743m; (ii) one externally illuminated projecting signage measuring 0.60m in width, 0.40m in height at a height above ground of 2.743m, on the front fa�ade at Eastcheap Street; and (iii) one non illuminated fascia signage (paint) measuring 1.9m in width, 0.3m in height at a height above ground of 2.55m on Talbot Court.

13 Eastcheap London EC3M 1BU

City of London CorporationReference 23/01140/ADVTAdvertisement Consent

Last published check: 13 Nov 2026, 15:34. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 13 Nov 2026, 15:34 (UK)

  1. DoneReceived18 Oct 2023
  2. DoneValidated18 Oct 2023
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date13 Dec 2023
  5. DecidedApproved23 Jan 2024

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (10)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Actual Committee Date

    Published milestoneCouncil source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
Application type
Advertisement Consent
Ward
Bridge And Bridge Without
Documents
11 published

Proposal

Installation and display of: (i) Externally illuminated fascia signage measuring 1.9m in width, 0.3m in height, at a height above ground of 2.743m; (ii) one externally illuminated projecting signage measuring 0.60m in width, 0.40m in height at a height above ground of 2.743m, on the front fa�ade at Eastcheap Street; and (iii) one non illuminated fascia signage (paint) measuring 1.9m in width, 0.3m in height at a height above ground of 2.55m on Talbot Court.

Reference
23/01140/ADVT
Alternative references
PP-12537067
Ward
Bridge And Bridge Without
Agent
Ampersand Associates Ltd.

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • CONSENT TO DISPLAY ADVERTISEMENTDecision23 Jan 2024View
  • OFFICER REPORTOfficers Report23 Jan 2024View
  • PROPOSED PLAN VIEWS & EXTERNAL ELEVATIONSDrawing5 Jan 2024View
  • PROPOSED SHOPFRONT ELEVATIONSDrawing5 Jan 2024View
  • COMMENTS - CAACConsultee Comment14 Dec 2023View
  • Application FormApplication Form18 Oct 2023View
  • LOCATIONPLANSite Plan18 Oct 2023View
  • EXISTING PLANSDrawing18 Oct 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
CONSENT TO DISPLAY ADVERTISEMENT
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.