ApprovedCouncil status: Decided

Retrospective application for the removal of rooftop water and boiler plant equipment, and the installation of six new rooftop plant equipment systems within an existing enclosure.

180 Fleet Street London EC4A 2HG

City of London CorporationReference 23/01007/FULLFull Planning Permission

Last published check: 13 Nov 2026, 17:07. Check the council record for more recent changes.

Status and dates

Last published check: 13 Nov 2026, 17:07 (UK)

  1. DoneReceived15 Sept 2023
  2. DoneValidated16 Sept 2023
  3. ClosedConsultationEnded 19 Oct 2023
  4. Date set by councilTarget decision date11 Nov 2023
  5. DecidedApproved1 Nov 2023

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (16)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  6. Last Advertised In Press Date

    Published milestoneCouncil source
  7. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Actual Committee Date

    Published milestoneCouncil source
  12. Decision Issued Date

    Published milestoneCouncil source
  13. Decision Made Date

    Published milestoneCouncil source
  14. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full Planning Permission
Ward
Farringdon Without
Documents
12 published

Proposal

Retrospective application for the removal of rooftop water and boiler plant equipment, and the installation of six new rooftop plant equipment systems within an existing enclosure.

Reference
23/01007/FULL
Alternative references
PP-12450584
Ward
Farringdon Without
Agent
Carter Jonas

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Officers ReportOfficers Report1 Nov 2023View
  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)Decision1 Nov 2023View
  • Application FormApplication Form15 Sept 2023View
  • SITE LOCATION PLANSite Plan15 Sept 2023View
  • ARIAL VIEW WITH OLD PLANTDrawing15 Sept 2023View
  • BUILDING ELEVATIONDrawing15 Sept 2023View
  • EXISTING ROOF PLANDrawing15 Sept 2023View
  • PLANNING COVER LETTERCover Letter15 Sept 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.