ApprovedCouncil status: Decided

Installation of plant equipment on roof level and the replacement of glazed panels and installation of (i) six louvred panels on the East elevation at level six, seven and eight, and (ii) three louvred panels on the South elevation at level six, seven, and eight.

Lloyds Chambers 1 Portsoken Street London E1 8BT

City of London CorporationReference 23/00942/FULLFull Planning Permission

Last published check: 13 Nov 2026, 17:08. Check the council record for more recent changes.

Status and dates

Last published check: 13 Nov 2026, 17:08 (UK)

  1. DoneReceived28 Aug 2023
  2. DoneValidated15 Sept 2023
  3. ClosedConsultationEnded 12 Oct 2023
  4. Date set by councilTarget decision date10 Nov 2023
  5. DecidedApproved14 Dec 2023

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (14)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Actual Committee Date

    Published milestoneCouncil source
  11. Decision Issued Date

    Published milestoneCouncil source
  12. Decision Made Date

    Published milestoneCouncil source
Application type
Full Planning Permission
Ward
Tower
Documents
44 published

Proposal

Installation of plant equipment on roof level and the replacement of glazed panels and installation of (i) six louvred panels on the East elevation at level six, seven and eight, and (ii) three louvred panels on the South elevation at level six, seven, and eight.

Reference
23/00942/FULL
Alternative references
PP-12275780
Ward
Tower
Agent
Gerald Eve LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • DECISIONDecision14 Dec 2023View
  • OFFICER'S REPORTOfficers Report14 Dec 2023View
  • PROPOSED ELEVATIONS NORTH ELEVATIONDrawing7 Nov 2023View
  • PROPOSED ELEVATIONS SOUTH ELEVATIONDrawing7 Nov 2023View
  • PROPOSED ELEVATIONS EAST ELEVATIONDrawing7 Nov 2023View
  • PROPOSED ELEVATIONS WEST ELEVATIONDrawing7 Nov 2023View
  • PROPOSED FLOOR PLAN ROOF PLAN GENERAL ARRANGEMENTDrawing7 Nov 2023View
  • COMMENTS - ENVIRONMENTAL HEALTH TEAMConsultee Comment22 Sept 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
DECISION
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.