ApprovedCouncil status: Decided

Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (Details of reinstatement to Blackfriars Bridge Pier western side, including balustrade details and stonework) pursuant to BLABF 11, BLABF 12 and BLABF 13 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR

City of London CorporationReference 23/00671/TTTThames Tideway Tunnel

Last published check: 13 Nov 2026, 22:28. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 13 Nov 2026, 22:28 (UK)

  1. DoneReceived26 Jun 2023
  2. DoneValidated26 Jun 2023
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date21 Aug 2023
  5. DecidedApproved13 Oct 2023

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (10)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Actual Committee Date

    Published milestoneCouncil source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
Application type
Thames Tideway Tunnel
Ward
Castle Baynard
Documents
10 published

Proposal

Partial discharge of Schedule 3 requirement relating to details of works to listed buildings and protective works to listed buildings (Details of reinstatement to Blackfriars Bridge Pier western side, including balustrade details and stonework) pursuant to BLABF 11, BLABF 12 and BLABF 13 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

Reference
23/00671/TTT
Alternative references
PP-12266870
Ward
Castle Baynard
Agent
Ferrovial Agroman Laing O'Rourke Joint Venture (FLo)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • OFFICER REPORTOfficers Report13 Oct 2023View
  • APPROVAL OF SUBMISSION UNDER SCHEDULE 3 OF ARTICLE 3 OF THE ABOVE ORDERDecision13 Oct 2023View
  • COMMENTS-TRANSPORT FOR LONDONConsultee Comment8 Sept 2023View
  • Application FormApplication Form26 Jun 2023View
  • BLABF PAYE BRIDGE REINSTATEMENTAccompanying report26 Jun 2023View
  • PROPOSED SITE FEATURES PLAN-WALKWAY/BRIDGE LEVELDrawing26 Jun 2023View
  • PROPOSED STAIR TO BRIDGE LEVEL PLANDrawing26 Jun 2023View
  • PROPOSED STAIR TO BRIDGE LEVEL ELEVATIONDrawing26 Jun 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
APPROVAL OF SUBMISSION UNDER SCHEDULE 3 OF ARTICLE 3 OF THE ABOVE ORDER
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.