External and internal works comprising of: (i) the construction of a glazed link extension to the Bell Tower; (ii) elevational alterations to the Bell Tower; (iii) refurbishment of the existing roofscape to include new finishes and introduction of hard and soft landscaping; (iv) creation of a new pedestrian entrance off Black Friars Lane; (v) the provision of cycle paring and end of trip facilities; (vi) installation of replacement plant at roof level; (vii) and all associated works.
External and internal works comprising of: (i) the construction of a glazed link extension to the Bell Tower; (ii) elevational alterations to the Bell Tower; (iii) refurbishment of the existing roofscape to include new finishes and introduction of hard and soft landscaping; (iv) creation of a new pedestrian entrance off Black Friars Lane; (v) the provision of cycle paring and end of trip facilities; (vi) installation of replacement plant at roof level; (vii) and all associated works.
Reference
23/00591/FULL
Alternative references
PP-12111768
Ward
Farringdon Within
Agent
Savills (UK) Limited
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.