ApprovedCouncil status: Decided

Submission of details pursuant to conditions (4f) and (3g) air source heat pumps and acoustic screening; (4g) and (3h) new roof ventilation cowls; (4i) and (3j) CCTV locations and fixing; (4j) and (3k) light fittings locations; (9) structure-borne sound and vibration minimisation scheme; (12) air quality report; (18i) and (5h) external lighting and service connections including lumieres and fixings; (21) lighting strategy of planning permission 22/00191/FULL dated 5th July 2022 and listed building consent 22/00232/LBC dated 5th July 2023

1B Snow Hill Court London EC1A 2EJ

City of London CorporationReference 23/00184/MDCSubmission of details (Planning)

Last published check: 14 Nov 2026, 03:07. Check the council record for more recent changes.

Status and dates

Last published check: 14 Nov 2026, 03:07 (UK)

  1. DoneReceived17 Feb 2023
  2. DoneValidated17 Feb 2023
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date14 Apr 2023
  5. DecidedApproved22 Jun 2023

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (10)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Actual Committee Date

    Published milestoneCouncil source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
Application type
Submission of details (Planning)
Ward
Farringdon Without
Documents
15 published

Proposal

Submission of details pursuant to conditions (4f) and (3g) air source heat pumps and acoustic screening; (4g) and (3h) new roof ventilation cowls; (4i) and (3j) CCTV locations and fixing; (4j) and (3k) light fittings locations; (9) structure-borne sound and vibration minimisation scheme; (12) air quality report; (18i) and (5h) external lighting and service connections including lumieres and fixings; (21) lighting strategy of planning permission 22/00191/FULL dated 5th July 2022 and listed building consent 22/00232/LBC dated 5th July 2023

Reference
23/00184/MDC
Alternative references
PP-11947527
Ward
Farringdon Without
Agent
Reed Watts Architects

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • APPROVAL OF SUBMISSION OF DETAILSDecision22 Jun 2023View
  • OFFICER REPORTOfficers Report22 Jun 2023View
  • RSAC PLANNING CONDITION PARTIAL DISCHARGE (SERIES E)Accompanying report4 May 2023View
  • APPLICATION FORM REDACTEDApplication Form17 Feb 2023View
  • PROPOSED EXTERNAL LIGHTING PLANDrawing17 Feb 2023View
  • GROUND FLOOR LAYOUT LIGHTING AND FIRE ALARM SYSTEMSDrawing17 Feb 2023View
  • EXTERNAL ELECTRICAL SERVICESDrawing17 Feb 2023View
  • LUMINAIRE SCHEDULEAccompanying report17 Feb 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
APPROVAL OF SUBMISSION OF DETAILS

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.