ApprovedCouncil status: Decided

Submission of details of detailed design and construction method statements for all of the ground floor structures, foundations and basements and for any other structures below ground level, including piling, any other temporary or permanent installations and for site investigations; and a method statement to include arrangements to secure that, during any period when concurrent construction is taking place of both the permitted development and of the Crossrail structures and tunnels in or adjacent to the site of the approved development, the construction of the Crossrail structures and tunnels is not impeded; pursuant to conditions 2 and 3 of planning permission 20/00325/FULEIA dated 06.08.2020.

101 Moorgate London EC2M 6SL

City of London CorporationReference 22/00767/MDCSubmission of details (Planning)

Last published check: 14 Nov 2026, 09:28. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 14 Nov 2026, 09:28 (UK)

  1. DoneReceived17 Aug 2022
  2. DoneValidated17 Aug 2022
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date12 Oct 2022
  5. DecidedApproved28 Oct 2022

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (10)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Actual Committee Date

    Published milestoneCouncil source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Standard Consultation Date

    Published milestoneCouncil source
  8. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Submission of details (Planning)
Ward
Coleman Street
Documents
29 published

Proposal

Submission of details of detailed design and construction method statements for all of the ground floor structures, foundations and basements and for any other structures below ground level, including piling, any other temporary or permanent installations and for site investigations; and a method statement to include arrangements to secure that, during any period when concurrent construction is taking place of both the permitted development and of the Crossrail structures and tunnels in or adjacent to the site of the approved development, the construction of the Crossrail structures and tunnels is not impeded; pursuant to conditions 2 and 3 of planning permission 20/00325/FULEIA dated 06.08.2020.

Reference
22/00767/MDC
Alternative references
PP-11479677
Ward
Coleman Street
Agent
Savills

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • APPROVAL OF SUBMISSION OF DETAILSDecision28 Oct 2022View
  • OFFICERS REPORTOther28 Oct 2022View
  • COMMENTS - CROSSRAIL SAFEGUARDINGConsultee Comment21 Oct 2022View
  • ROTARY PILINGAccompanying report21 Sept 2022View
  • COMMENTS - CROSSRAILConsultee Comment8 Sept 2022View
  • CMMENTS - CROSSRAILConsultee Comment5 Sept 2022View
  • COMMENTS - TFLConsultee Comment1 Sept 2022View
  • COMMENTS-NETWORK RAILConsultee Comment31 Aug 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
APPROVAL OF SUBMISSION OF DETAILS
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.