ApprovedCouncil status: Decided

Internal and external refurbishment works comprising: (i) replacement of windows; (ii) infilling of lightwells at ground floor level with glazed roofs; (iii) removal of car lift and installation of new glazed frontage at ground floor of the Foster Lane elevation; (iv) internal refurbishment works including removal of non-original wall, doors, lights and finishes; (v) replacement of passenger lifts; and (vi) installation of end of trip facilities.

St Martins House 16 St Martin's-le-Grand London EC1A 4EN

City of London CorporationReference 22/00085/LBCListed Building Consent

Last published check: 14 Nov 2026, 16:30. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 14 Nov 2026, 16:30 (UK)

  1. DoneReceived7 Feb 2022
  2. DoneValidated7 Feb 2022
  3. ClosedConsultationEnded 14 Apr 2022
  4. Date set by councilTarget decision date4 Apr 2022
  5. DecidedApproved16 Aug 2022

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (12)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Actual Committee Date

    Published milestoneCouncil source
  9. Decision Issued Date

    Published milestoneCouncil source
  10. Decision Made Date

    Published milestoneCouncil source
Application type
Listed Building Consent
Ward
Cheap
Documents
74 published

Proposal

Internal and external refurbishment works comprising: (i) replacement of windows; (ii) infilling of lightwells at ground floor level with glazed roofs; (iii) removal of car lift and installation of new glazed frontage at ground floor of the Foster Lane elevation; (iv) internal refurbishment works including removal of non-original wall, doors, lights and finishes; (v) replacement of passenger lifts; and (vi) installation of end of trip facilities.

Reference
22/00085/LBC
Alternative references
PP-11016827
Ward
Cheap
Agent
Rolfe Judd Planning Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • OFFICERS REPORTOther16 Aug 2022View
  • LISTED BUILDING CONSENTDecision16 Aug 2022View
  • PROPOSED FOURTH FLOORDrawing7 Feb 2022View
  • PROPOSED THIRD FLOOR PLANDrawing7 Feb 2022View
  • PROPOSED SECOND FLOOR PLANDrawing7 Feb 2022View
  • PROPOSED CEILING PLANS - RECEPTION AND CORE 01Drawing7 Feb 2022View
  • TYPICAL REPLACEMENT WINDOW DETAILS - FRONT AND BACK FADrawing7 Feb 2022View
  • TYPICAL CORE PLANSDrawing7 Feb 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
LISTED BUILDING CONSENT

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.