External works comprise the removal of external mechanical plant equipment and replacement equipment provided on the main roof of 6 Crane Court and the lightwell of 5 Crane Court; alterations to the existing plant room within the lightwell of 5 Crane Court including new flat roof and provision of new terrace area; removal of external railing to 5 Crane Court lightwell; and minor works to external facades to include decorations to render, windows and doors for maintenance purposes. Internal works comprise the replacement of mechanical and electrical services throughout the building; strip out of 1996 refurbishment works including removal of internal partition walls; instillation of internal partitioning and increasing width of one structural door opening; and general refurbishment works including new decorations, floor finishes and WCs fit-out.
External works comprise the removal of external mechanical plant equipment and replacement equipment provided on the main roof of 6 Crane Court and the lightwell of 5 Crane Court; alterations to the existing plant room within the lightwell of 5 Crane Court including new flat roof and provision of new terrace area; removal of external railing to 5 Crane Court lightwell; and minor works to external facades to include decorations to render, windows and doors for maintenance purposes. Internal works comprise the replacement of mechanical and electrical services throughout the building; strip out of 1996 refurbishment works including removal of internal partition walls; instillation of internal partitioning and increasing width of one structural door opening; and general refurbishment works including new decorations, floor finishes and WCs fit-out.
Reference
21/00662/LBC
Alternative references
PP-10098988
Ward
Castle Baynard
Agent
WEBB ARCHITECTS LIMITED
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.