ApprovedCouncil status: Decided

Change of use of part ground floor reception area at west end of building to UKPN electrical substation room (Sui Generis) (25.0 sq.m); and alterations to west facade for the installation of two new vents and steel door in association with proposed electrical substation.

Offices Walbrook Wharf 79 - 83 Upper Thames Street London EC4R 3TD

City of London CorporationReference 21/00510/FULLFull Planning Permission

Last published check: 15 Nov 2026, 01:33. Check the council record for more recent changes.

Status and dates

Last published check: 15 Nov 2026, 01:33 (UK)

  1. DoneReceived14 Jun 2021
  2. DoneValidated14 Jun 2021
  3. ClosedConsultationEnded 19 Aug 2021
  4. Date set by councilTarget decision date9 Aug 2021
  5. DecidedApproved23 Sept 2021

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (14)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Actual Committee Date

    Published milestoneCouncil source
  11. Decision Issued Date

    Published milestoneCouncil source
  12. Decision Made Date

    Published milestoneCouncil source
Application type
Full Planning Permission
Ward
Vintry
Documents
6 published

Proposal

Change of use of part ground floor reception area at west end of building to UKPN electrical substation room (Sui Generis) (25.0 sq.m); and alterations to west facade for the installation of two new vents and steel door in association with proposed electrical substation.

Reference
21/00510/FULL
Alternative references
PP-09911585
Ward
Vintry

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)Decision23 Sept 2021View
  • OFFICER REPORTOther23 Sept 2021View
  • SITE NOTICESite Notice22 Jul 2021View
  • PROP SUB-STATION WORKSDrawing14 Jun 2021View
  • PROP SUB-STATION WORKSSite Plan14 Jun 2021View
  • APPLICATIONFORMREDACTEDApplication Form14 Jun 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.