ApprovedCouncil status: Decided

Partial discharge of Schedule 3 requirements relating to details of the construction of the Low Level 1 Interception Chamber including removal of the Listed River wall and Service Subway and associated reinstatement pursuant to BLABF 11, 12, 13 and 24 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR

City of London CorporationReference 21/00234/TTTThames Tideway Tunnel

Last published check: 15 Nov 2026, 03:42. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 15 Nov 2026, 03:42 (UK)

  1. DoneReceived30 Mar 2021
  2. DoneValidated30 Mar 2021
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date25 May 2021
  5. DecidedApproved17 Jun 2021

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (10)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Actual Committee Date

    Published milestoneCouncil source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
Application type
Thames Tideway Tunnel
Ward
Castle Baynard
Documents
56 published

Proposal

Partial discharge of Schedule 3 requirements relating to details of the construction of the Low Level 1 Interception Chamber including removal of the Listed River wall and Service Subway and associated reinstatement pursuant to BLABF 11, 12, 13 and 24 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

Reference
21/00234/TTT
Alternative references
PP-09686582
Ward
Castle Baynard
Agent
Ferrovial Agroman Laing O'Rourke Joint Venture (FLo)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • OFFICERS REPORTOther17 Jun 2021View
  • APPROVAL OF SUBMISSION UNDER SCHEDULE 3 OF ARTICLE OF THE ABOVE ORDERDecision17 Jun 2021View
  • FLO - PERMANENT WORKS BLACKFRIARS FORESHORE CRASH DECK PLAN & SECTIONDrawing28 May 2021View
  • EDB 1908 ? RIVER WALL STABILITY FOR LLNO1 BREAK-IN WORKSAccompanying report30 Mar 2021View
  • COVER LETTERAccompanying letters30 Mar 2021View
  • TIDEWAY CENTRAL C410 ? BLABF COL UTILITY SUBWAY CONNECTION WITH REINSTATED WALLAccompanying report30 Mar 2021View
  • DTR2018 - BLABF CONFORMATION OF COL EXISTING SERVICE SUBWAY ARCH STABILITYOther30 Mar 2021View
  • DTR 2019 - CONFORMATION OF MOVEMENT AT THE COL SERVICE SUBWAY AND LLNO1 INTERFACOther30 Mar 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
APPROVAL OF SUBMISSION UNDER SCHEDULE 3 OF ARTICLE OF THE ABOVE ORDER
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.