WithdrawnCouncil status: Withdrawn

Submission of materials, details of elevations, ground level elevations, soffits, handrails and balustrades and junctions with pavement surfaces, roof level excrescences, courier cycle and motorcycle parking; details of refuse storage and collection provision, internal directional and traffic signs and access statement pursuant to condition 3 (a), (b), (c), (d,) (e), (f),(g,),(i) 4, 13 and 26 of planning permission dated 07.04.06 (05/00771/FULEIA).

106 - 126 Bishopsgate And 35-37 Camomile Street London EC2

City of London CorporationReference 07/00478/MDCSubmission of details (Planning)

Last published check: 21 Nov 2026, 22:27. Check the council record for more recent changes.

Status and dates

Last published check: 21 Nov 2026, 22:27 (UK)

  1. DoneReceived11 May 2007
  2. DoneValidated11 May 2007
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date6 Jul 2007
  5. ClosedWithdrawnWithdrawn

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (9)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
Application type
Submission of details (Planning)
Ward
Bishopsgate
Documents
133 published

Proposal

Submission of materials, details of elevations, ground level elevations, soffits, handrails and balustrades and junctions with pavement surfaces, roof level excrescences, courier cycle and motorcycle parking; details of refuse storage and collection provision, internal directional and traffic signs and access statement pursuant to condition 3 (a), (b), (c), (d,) (e), (f),(g,),(i) 4, 13 and 26 of planning permission dated 07.04.06 (05/00771/FULEIA).

Reference
07/00478/MDC
Ward
Bishopsgate

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • WITHDRAWNDecision20 Nov 2017View
  • 6M CITY OF LONDON REFUSE VEHICLE VEHICLE 1 ENTRYDrawing19 Mar 2012View
  • 6M CITY OF LONDON REFUSE VEHICLE VEHICLE 1 EXITDrawing19 Mar 2012View
  • 6M CITY OF LONDON REFUSE VEHICLE VEHICLE 2 ENTRYDrawing19 Mar 2012View
  • 6M CITY OF LONDON REFUSE VEHICLE VEHICLE 2 EXITDrawing19 Mar 2012View
  • REVISED LOADING BAY EXIT ARRANGEMENTDrawing19 Mar 2012View
  • DRAWINGS ISSUE SHEETDrawings Schedule21 Jan 2011View
  • INFO RELATING TO THE DISCHARGEOF CONDITIONS 3, 4, 13, 26Other21 Jan 2011View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Withdrawn
WITHDRAWN
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.