ApprovedCouncil status: Decided

Removal of existing 2nd floor level pedestrian bridge link. Reinstatement of the 2nd floor windows and surrounding stonework at St Georges House, 6 Eastcheap. Installation of glazed and louvre panels at 2nd floor level and reinstatement of surrounding stonework at Faryners House, 25 Monument Street.

St Georges House, 6 Eastcheap And Faryners House, 25 Monument Street London EC3M 1AJ

City of London CorporationReference 05/01026/FULLFull Planning Permission

Last published check: 22 Nov 2026, 13:30. Check the council record for more recent changes.

Status and dates

Last published check: 22 Nov 2026, 13:30 (UK)

  1. DoneReceived28 Nov 2005
  2. DoneValidated2 Dec 2005
  3. ClosedConsultationEnded 27 Dec 2005
  4. Date set by councilTarget decision date27 Jan 2006
  5. DecidedApproved13 Jan 2006

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (14)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Standard Consultation Date

    Published milestoneCouncil source
  6. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Actual Committee Date

    Published milestoneCouncil source
  10. Decision Issued Date

    Published milestoneCouncil source
  11. Decision Made Date

    Published milestoneCouncil source
  12. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full Planning Permission
Ward
Bridge And Bridge Without
Documents
34 published

Proposal

Removal of existing 2nd floor level pedestrian bridge link. Reinstatement of the 2nd floor windows and surrounding stonework at St Georges House, 6 Eastcheap. Installation of glazed and louvre panels at 2nd floor level and reinstatement of surrounding stonework at Faryners House, 25 Monument Street.

Reference
05/01026/FULL
Ward
Bridge And Bridge Without
Agent
Ruddle Wilkinson Architects

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • DecisionDecision13 Jan 2006View
  • SECTIONS THROUGH ST GEORGE'S HSEDrawing9 Dec 2005View
  • SECTIONS THROUGH ST GEORGE'S HSEDrawing9 Dec 2005View
  • MemoMemo8 Dec 2005View
  • MemoMemo8 Dec 2005View
  • Site NoticeSite Notice6 Dec 2005View
  • Site NoticeSite Notice6 Dec 2005View
  • RECEITOther5 Dec 2005View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.