ApprovedCouncil status: Decided

Modifications to existing consent (Registered Plan No. 00-0511AE) for change of use from education to residential including extension to rear at basement level. Erection of rear fire escape, installation of lift overrun at roof level, alteration to fenestration, changes to facade treatment of rear extension and amendments to location, arrangement of refuse storage area and amendments to internal layout.

6 Bolt Court London EC4A 3DQ

City of London CorporationReference 04/01018/LBCListed Building Consent

Last published check: 22 Nov 2026, 23:37. Check the council record for more recent changes.

Status and dates

Last published check: 22 Nov 2026, 23:37 (UK)

  1. DoneReceived13 Dec 2004
  2. DoneValidated17 Jan 2005
  3. ClosedConsultationEnded 4 Feb 2005
  4. Date set by councilTarget decision date14 Mar 2005
  5. DecidedApproved14 Mar 2005

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (12)
  1. Application Received Date

    Published milestoneCouncil source
  2. Last Site Notice Posted Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Actual Committee Date

    Published milestoneCouncil source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Decision Made Date

    Published milestoneCouncil source
  10. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Listed Building Consent
Ward
Castle Baynard
Documents
47 published

Proposal

Modifications to existing consent (Registered Plan No. 00-0511AE) for change of use from education to residential including extension to rear at basement level. Erection of rear fire escape, installation of lift overrun at roof level, alteration to fenestration, changes to facade treatment of rear extension and amendments to location, arrangement of refuse storage area and amendments to internal layout.

Reference
04/01018/LBC
Ward
Castle Baynard

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • THE CITY LITERARY INSTITUTE, 6 BOLT COURT, LONDON EC4Accompanying letters13 May 2005View
  • GROUND FLOOR PLAN AS PROPOSEDDrawing12 May 2005View
  • 1ST FLOOR PLAN AS PROPOSEDDrawing12 May 2005View
  • 3RD FLOOR PLAN AS PROPOSEDDrawing12 May 2005View
  • 2ND FLOOR PLAN AS PROPOSEDDrawing9 May 2005View
  • THE CITY LITERARY INSTITUTE, 6 BOLT COURT, LONDON EC4Accompanying letters26 Apr 2005View
  • 4 DRAWINGSDrawing26 Apr 2005View
  • LISTED BUILDING CONSENT (CONDITIONAL)Decision14 Mar 2005View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
LISTED BUILDING CONSENT (CONDITIONAL)
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.