Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Lincoln County Hospital Greetwell Road Lincoln Lincolnshire LN2 5QY
Last published check: 30 Sept 2026, 06:20. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceErection of a modular unit for a 12 bed critical care Assessment Ward with a link corridor to the main hospital, with associated air handling units and external ramp.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLincoln County Hospital Greetwell Road Lincoln Lincolnshire LN2 5QY
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| Decision NoticeDecision Notice · PDF | 22 Apr 2021 | View |
| ENVIRONMENTAL HEALTH COMMENTSConsultee Comment · PDF | 15 Apr 2021 | View |
| BLOCK PLAN (FIRE STRATEGY PLAN)Plan · PDF | 26 Feb 2021 | View |
| PROPOSED GROUND FLOOR PLAN (DETAIL)Plan · PDF | 26 Feb 2021 | View |
| PROPOSED GROUND FLOOR PLAN (FULL)Plan · PDF | 26 Feb 2021 | View |
| PROPOSED ELEVATIONSPlan · PDF | 26 Feb 2021 | View |
| PARU SUB-STRUCTURE REINFORCEMENT PROVISIONAL QUANTITIESSupporting Document · PDF | 17 Feb 2021 | View |
| NEGATIVE PRESSURE DESIGN OPTION (4NO. NP ROOMS) 21-01-21Plan · PDF | 17 Feb 2021 | View |
| DOCUMENT REGISTERSupporting Document · PDF | 17 Feb 2021 | View |
| REINFORCEMENT DETAILS GROUND BEAMS ELEVATIONS AND DETAILSPlan · PDF | 17 Feb 2021 | View |
| REINFORCEMENT DETAILS PILECAPS, GROUND BEAMS AND PLINTHS GENERAL ARRANGEMENTPlan · PDF | 17 Feb 2021 | View |
| CROSS SECTIONS SECTION 5 TO 1 SHEET 2 OF 2Plan · PDF | 17 Feb 2021 | View |
| CROSS SECTIONS SHEET 1 OF 2Plan · PDF | 17 Feb 2021 | View |
| LONG SECTIONSPlan · PDF | 17 Feb 2021 | View |
| AHU BASE GENERAL ARRANGEMENT AND SPECIFICATIONPlan · PDF | 17 Feb 2021 | View |
| PILE CAPS, GROUND BEAMS AND PLINTHS GENERAL ARRANGEMENT AND SPECIFICATIONPlan · PDF | 17 Feb 2021 | View |
| DRAINAGE GA, SPECIFICATION AND DETAILSPlan · PDF | 17 Feb 2021 | View |
| PILING GA, SPECIFICATION AND DETAILSPlan · PDF | 17 Feb 2021 | View |
| SITE SURVEY SETTING OUT AND EXISTING SERVICESPlan · PDF | 17 Feb 2021 | View |
| APPLICATION FORM REDACTEDApplication Form · PDF | 17 Feb 2021 | View |
| EXISTING BUILDING ELEVATIONSPlan · PDF | 17 Feb 2021 | View |
| DEMOLITION AND EXTERNAL WORKS STRIP OUTPlan · PDF | 17 Feb 2021 | View |
| PACKAGE 2 AND 3Plan · PDF | 17 Feb 2021 | View |
| PACKAGE 1Plan · PDF | 17 Feb 2021 | View |
| EXISTING PLAN AND LOCATIONPlan · PDF | 17 Feb 2021 | View |
| PROPOSED EXTERNAL RAMP FROM MODULAR BUILDING AND PLINTHPlan · PDF | 17 Feb 2021 | View |
| PROPOSED EXTERNAL WORKS AND DETAIL - REDIRECTED RAMP AND AHU COMPOUND DETAILSPlan · PDF | 17 Feb 2021 | View |
| PROPOSED ROOF PLAN AND DRAINAGEPlan · PDF | 17 Feb 2021 | View |
| PROPOSED CEILING PLAN, FLOOR AND WALL FINISHESPlan · PDF | 17 Feb 2021 | View |
| DOOR AND WINDOW DETAILS SHEET 3 OF 3Plan · PDF | 17 Feb 2021 | View |
| DOOR AND WINDOW DETAILS SHEET 2 OF 3Plan · PDF | 17 Feb 2021 | View |
| DOOR AND WINDOW DETAILS SHEET 1 OF 3Plan · PDF | 17 Feb 2021 | View |
| FIRE STRATEGY PLANPlan · PDF | 17 Feb 2021 | View |
| PROPOSED SECTION DETAILPlan · PDF | 17 Feb 2021 | View |
| PROPOSED EXTERNAL ELEVATIONSPlan · PDF | 17 Feb 2021 | View |
| PROPOSED DIMENSIONS PLAN OF THE LINKPlan · PDF | 17 Feb 2021 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.