Council planning record

Hybrid planning application for the sustainable urban extension of Lincoln on the site of the Western Growth Corridor to comprise:- In Outline - Housing development of up to 3,200 dwellings; local centre comprising community, retail (E, F.2 and Pub or drinking extensive areas of open space, leisure village establishment/Takeaway as Sui Generis uses), employment (E) uses and parking; a primary school; up to 8HA of land (including key infrastructure) for up to 40,000sq.m of E and B2 development; up to 12ha of land (including key infrastructure) for sport, recreation and leisure (E and F.1 and F.2), a hotel (C1) food and drink outlets (E and Sui Generis) and a new community stadium for Lincoln City Football Club; Areas of formal and informal public openspace; a network of public footpaths and cycleways associated engineering works to inform development platform and drainage system; new transport bridge link over to Beevor Street, and a new public footpath bridge over to Tritton Road. In Full - Details for means of access into the site from Skellingthorpe Road and Tritton Road (revised description).

Phase 1B Western Growth Corridor Skellingthorpe Road Lincoln Lincolnshire

DecidedReference: 2019/0294/RG3City of Lincoln Council

Last published check: 2 Oct 2026, 20:06. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Actual Committee Date

    Published milestoneCouncil source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Local Authority app - Dev by others
Received
8 Apr 2019
Validated
15 Apr 2019
Determination deadline
16 Jul 2019
Local authority
City of Lincoln Council

Application overview

Hybrid planning application for the sustainable urban extension of Lincoln on the site of the Western Growth Corridor to comprise:- In Outline - Housing development of up to 3,200 dwellings; local centre comprising community, retail (E, F.2 and Pub or drinking extensive areas of open space, leisure village establishment/Takeaway as Sui Generis uses), employment (E) uses and parking; a primary school; up to 8HA of land (including key infrastructure) for up to 40,000sq.m of E and B2 development; up to 12ha of land (including key infrastructure) for sport, recreation and leisure (E and F.1 and F.2), a hotel (C1) food and drink outlets (E and Sui Generis) and a new community stadium for Lincoln City Football Club; Areas of formal and informal public openspace; a network of public footpaths and cycleways associated engineering works to inform development platform and drainage system; new transport bridge link over to Beevor Street, and a new public footpath bridge over to Tritton Road. In Full - Details for means of access into the site from Skellingthorpe Road and Tritton Road (revised description).

Proposal details

Reference
2019/0294/RG3
Alternative references
PP-07726135
Ward
Boultham
Agent
Mark Foster

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Phase 1B Western Growth Corridor Skellingthorpe Road Lincoln Lincolnshire

This record has no verified map location.

View council map

Documents 199 of 199

DocumentPublishedAction
FINAL DECISION NOTICEDecision Notice · PDF20 Jan 2022View
WALKING, CYCLING AND HORSE RIDING ASSESSMENT AND REVIEW (WCHAR)Supporting Document · PDF30 Nov 2021View
ROAD SAFETY AUDIT RESPONSE REPORTSupporting Document · PDF30 Nov 2021View
A46/SKELLINGTHORPE ROAD ROUNDABOUT ROAD SAFETY AUDIT STAGE 1Supporting Document · PDF30 Nov 2021View
A46 LINCOLN ROAD ROUNDABOUT CONTROLLED CROSSINGS GG104 SAFETY RISK ASSESSMENTSupporting Document · PDF30 Nov 2021View
ENVIRONMENTAL STATEMENT ADDENDUM NOV 21Supporting Document · PDF25 Nov 2021View
DELIVERABILITY REPORT BY ASPINALL VERDI PROPERTY REGENERATION CONSULTANTSSupporting Document · PDF2 Nov 2021View
REVISED OWNERSHIP CERTIFICATE (CERTIFICATE C)Supporting Document · PDF14 Jun 2021View
LINCOLNSHIRE ECHO PUBLISHED NOTICE - OWNERSHIP CERTIFICATESupporting Document · PDF14 Jun 2021View
INDEPENDENT HIGHWAY ADVICE BSP CONSULTINGSupporting Document · PDF12 May 2021View
WGC TECH NOTE 11 REV RESPONSE TO HESupporting Document · PDF23 Feb 2021View
APPLICANT RESPONSE TO HIGHWAYSSupporting Document · PDF13 Jan 2021View
APPENDIX 1 - LETTER TO LPA 13.5.20Supporting Document · PDF13 Jan 2021View
APPENDIX 2 - CENTRAL LINCOLNSHIRE LOCAL PLAN INSPECTION REPORTSupporting Document · PDF13 Jan 2021View
APPENDIX 3 - LINCOLN WGC TECHINCAL NOTE 9 REV BSupporting Document · PDF13 Jan 2021View
APPENDIX 4 - LINCOLN WGC TECHINCAL NOTE 10 REV ASupporting Document · PDF13 Jan 2021View
APPENDIX 6 - WGC SMART INFRASTRUCTURE REPORTSupporting Document · PDF13 Jan 2021View
APPENDIX 5 - IAN FARMER FACTUAL GROUND INVESTIGATION REPORT (PAGES 1-279)Supporting Document · PDF13 Jan 2021View
APPENDIX 5 - IAN FARMER FACTUAL GROUND INVESTIGATION REPORT (PAGES 280-572)Supporting Document · PDF13 Jan 2021View
AIR QUALITY ASSESSMENT FINALSupporting Document · PDF11 Sept 2020View
CONCEPT PLANPlan · PDF11 Sept 2020View
COVERING LETTERSupporting Document · PDF11 Sept 2020View
SURFACE WATER DRAINAGE STRATEGYPlan · PDF11 Sept 2020View
ILLUSTRATIVE MASTERPLANPlan · PDF11 Sept 2020View
STREET HIERARCHY PLANPlan · PDF11 Sept 2020View
PHASING PLAN - PHASE 1Plan · PDF11 Sept 2020View
PHASING PLAN - PHASE 2Plan · PDF11 Sept 2020View
PHASING PLAN - PHASE 3+4Plan · PDF11 Sept 2020View
PHASING PLAN SCHEDULESupporting Document · PDF11 Sept 2020View
ISSUE SHEETSupporting Document · PDF11 Sept 2020View
SKELLINGTHORPE ROAD ACCESS GENERAL ARRANGEMENTPlan · PDF11 Sept 2020View
BEEVOR STREET ACCESS GENERAL ARRANGEMENTPlan · PDF11 Sept 2020View
TRITTON ROAD ACCESS GENERAL ARRANGEMENT SHEET 1Plan · PDF11 Sept 2020View
TRITTON ROAD ACCESS GENERAL ARRANGEMENT SHEET 2Plan · PDF11 Sept 2020View
TYPICAL HIGHWAY CROSS SECTIONSPlan · PDF11 Sept 2020View
INDICATIVE BUS PRIORITY MEASURESPlan · PDF11 Sept 2020View
SKELLINGTHORPE ROAD ACCESS LONGITUDINAL SECTIONPlan · PDF11 Sept 2020View
TRITTON ROAD LONGITUDINAL SECTIONPlan · PDF11 Sept 2020View
SKELLINGTHORPE ROAD ACCESS FENCING ARRANGEMENTPlan · PDF11 Sept 2020View
TRITTON ROAD ACCESS FENCING ARRANGEMENT SHEET 1Plan · PDF11 Sept 2020View
TRITTON ROAD ACCESS FENCING ARRANGEMENT SHEET 2Plan · PDF11 Sept 2020View
SKELLINGTHORPE ROAD ACCESS DRAINAGE LAYOUTPlan · PDF11 Sept 2020View
TRITTON ROAD ACCESS DRAINAGE LAYOUT SHEET 1Plan · PDF11 Sept 2020View
TRITTON ROAD ACCESS DRAINAGE LAYOUT SHEET 2Plan · PDF11 Sept 2020View
SURFACE WATER DRAINAGE STRATEGYPlan · PDF11 Sept 2020View
PROPOSED LEVELSPlan · PDF11 Sept 2020View
SKELLINGTHORPE ROAD ACCESS CARRIAGEWAY AND FOOTWAYSPlan · PDF11 Sept 2020View
TRITTON ROAD ACCESS CARRIAGEWAY AND FOOTWAYS SHEET 1Plan · PDF11 Sept 2020View
TRITTON ROAD ACCESS CARRIAGEWAY AND FOOTWAYS SHEET 2Plan · PDF11 Sept 2020View
SKELLINGTHORPE ROAD ACCESS ROAD MARKINGS AND TRAFFIC SIGNS SHEET 1Plan · PDF11 Sept 2020View
SKELLINGTHORPE ROAD JUNCTION ROAD MARKINGS AND TRAFFIC SIGNS SHEET 2Plan · PDF11 Sept 2020View
TRITTON ROAD ACCESS SIGNS AND MARKINGS SHEET 1Plan · PDF11 Sept 2020View
TRITTON ROAD ACCESS SIGNS AND MARKINGS SHEET 2Plan · PDF11 Sept 2020View
TRITTON ROAD ACCESS BRIDGE GENERAL ARRANGEMENT SHEET 1Plan · PDF11 Sept 2020View
TRITTON ROAD ACCESS BRIDGE GENERAL ARRANGEMENT SHEET 2Plan · PDF11 Sept 2020View
TRITTON ROAD ACCESS BRIDGE GENERAL ARRANGEMENT SHEET 3Plan · PDF11 Sept 2020View
SKELLINGTHORPE ROAD ACCESS BRIDGE GENERAL ARRANGEMENT SHEET 1Plan · PDF11 Sept 2020View
SKELLINGTHORPE ROAD ACCESS BRIDGE GENERAL ARRANGEMENT SHEET 2Plan · PDF11 Sept 2020View
SKELLINGTHORPE ROAD ACCESS BRIDGE GENERAL ARRANGEMENT SHEET 3Plan · PDF11 Sept 2020View
VIEWPOINT 3 EXISTING VIEW PHOTOMONTAGE AND WIREFRAMEPlan11 Sept 2020View
VIEWPOINT 4 EXISTING VIEW PHOTOMONTAGE AND WIREFRAMEPlan11 Sept 2020View
VIEWPOINT 5 EXISTING VIEW PHOTOMONTAGE AND WIREFRAMEPlan11 Sept 2020View
AMENDED PLANNING STATEMENTSupporting Document · PDF11 Sept 2020View
TRANSPORT ASSESSMENTSupporting Document · PDF11 Sept 2020View
TRANSPORTATIONSupporting Document · PDF11 Sept 2020View
FACTUAL AND INTERPRETIVE REPORT ON ENVIRONMENTAL MONITORING FINAL - AECOM MARCHSupporting Document · PDF28 Jun 2019View
PHASE II GEO-ENVIRONMENTAL AND GEOTECHNICAL ASSESSMENT FINAL - AECOM MARCH 2018Supporting Document · PDF28 Jun 2019View
TREE SURVEYSupporting Document · PDF18 Jun 2019View
FRA APPENDICESSupporting Document · PDF23 Apr 2019View
DESIGN AND ACCESS STATEMENTSupporting Document · PDF23 Apr 2019View
FIGURE 12.20 - SHORT-TERM ROAD TRAFFIC NOISE CHANGE 2038DS TO 2040DSSupporting Document · PDF15 Apr 2019View
FIGURE 12.19 - LONG-TERM ROAD TRAFFIC NOISE CHANGE 2026DM TO 2043DSSupporting Document · PDF15 Apr 2019View
FIGURE 12.18 - SHORT-TERM ROAD TRAFFIC NOISE CHANGE 2026DM TO 2026DSSupporting Document · PDF15 Apr 2019View
FIGURE 12.17 - LONG-TERM ROAD TRAFFIC NOISE CHANGE 2026DM TO 2043DMSupporting Document · PDF15 Apr 2019View
FIGURE 12.16 - GLAZING AND VENTILATION REQUIREMENTS FOR RESIDENTIAL DEVELOPMENTSupporting Document · PDF15 Apr 2019View
FIGURE 12.15 - DO-SOMETHING 2043 (PHASE 4 DEVELOPMENT CONSTRUCTED) GRID NOISE MASupporting Document · PDF15 Apr 2019View
FIGURE 12.14 - DO-SOMETHING 2043 (PHASE 4 DEVELOPMENT CONSTRUCTED) GRID NOISE MASupporting Document · PDF15 Apr 2019View
FIGURE 12.13 - DO-SOMETHING 2038 (PHASE 2 DEVELOPMENT CONSTRUCTED) GRID NOISE MASupporting Document · PDF15 Apr 2019View
FIGURE 12.12 - DO-SOMETHING 2038 (PHASE 2 DEVELOPMENT CONSTRUCTED) GRID NOISE MASupporting Document · PDF15 Apr 2019View
FIGURE 12.11 - DO-SOMETHING 2026 (PHASE 1 DEVELOPMENT CONSTRUCTED) GRID NOISE MASupporting Document · PDF15 Apr 2019View
STATEMENT OF COMMUNITY ENGAGEMENTSupporting Document · PDF11 Apr 2019View
SUSTAINABLE ENERGY STATEMENTSupporting Document · PDF11 Apr 2019View
HEALTH IMPACT ASSESSMENTSupporting Document · PDF11 Apr 2019View
SPORTS PLANNING STATEMENTSupporting Document · PDF11 Apr 2019View
DESIGN CODESupporting Document · PDF11 Apr 2019View
AECOM DRAWING REGISTERSupporting Document · PDF11 Apr 2019View
SECTIONS 2 AND 4Plan · PDF11 Apr 2019View
SECTIONS 7, 13 AND 14Plan · PDF11 Apr 2019View
SECTIONS 5 AND 6Plan · PDF11 Apr 2019View
SECTION 8Plan · PDF11 Apr 2019View
SECTIONS 5 AND 6Plan · PDF11 Apr 2019View
SECTIONS 9-12Plan · PDF11 Apr 2019View
CGI VIEW 7Plan11 Apr 2019View
CGI VIEW 6Plan11 Apr 2019View
CGI VIEW 5Plan11 Apr 2019View
CGI VIEW 4Plan11 Apr 2019View
CGI VIEW 3Plan11 Apr 2019View
CGI VIEW 2Plan11 Apr 2019View
CGI VIEW 1Plan11 Apr 2019View
BUILDING HEIGHTSPlan · PDF11 Apr 2019View
CHARACTER AND PLACEPlan · PDF11 Apr 2019View
OVERALL CHARACTER AND PLACEPlan · PDF11 Apr 2019View
GREEN AND BLUE INFRASTRUCTUREPlan · PDF11 Apr 2019View
PARAMETER PLANPlan · PDF11 Apr 2019View
WALKING DISTANCES TO BUS ROUTEPlan · PDF11 Apr 2019View
CYCLING DISTANCESPlan · PDF11 Apr 2019View
WALKING DISTANCESPlan · PDF11 Apr 2019View
APPLICATION SITE AREA WITH ALLOCATION SITE AREAPlan · PDF11 Apr 2019View
OPEN SPACE AREASPlan · PDF11 Apr 2019View
SITE LOCATION PLANPlan · PDF11 Apr 2019View
DEVELOPMENT INFRASTRUCTURE AND OPEN SPACE PLANPlan · PDF11 Apr 2019View
SITE LOCATION PLAN AERIALPlan · PDF11 Apr 2019View
DRAWING REGISTERSupporting Document · PDF11 Apr 2019View
AREA PLANPlan · PDF11 Apr 2019View
LAND OWNERSHIP PLANPlan · PDF11 Apr 2019View
ENVIRONMENTAL STATEMENTSupporting Document · PDF11 Apr 2019View
ENVIRONMENTAL STATEMENT - NON-TECHNICAL SUMMARYSupporting Document · PDF11 Apr 2019View
COVER PAGESSupporting Document · PDF11 Apr 2019View
FIGURE 5.9-5.12 - VIEWPOINTS 1-4Supporting Document · PDF11 Apr 2019View
FIGURE 5.21-5.22 - VIEWPOINTS 13-14Supporting Document · PDF11 Apr 2019View
FIGURE 5.17-5.20 - VIEWPOINTS 9-12Supporting Document · PDF11 Apr 2019View
FIGURE 5.13-5.16 - VIEWPOINTS 5-8Supporting Document · PDF11 Apr 2019View
FIGURE 6.9 - BAT CONSTRAINTS 2018Supporting Document · PDF11 Apr 2019View
FIGURE 6.8 - WATER VOLE CONSTRAINTS 2018Supporting Document · PDF11 Apr 2019View
FIGURE 6.7 - BREEDING BIRDS CONSTRAINTS 2018Supporting Document · PDF11 Apr 2019View
FIGURE 6.6 - REPTILE CONSTRAINTS MAP 2018Supporting Document · PDF11 Apr 2019View
FIGURE 6.5 - GREAT CRESTED NEWT SURVEYS 2016_2018Supporting Document · PDF11 Apr 2019View
FIGURE 6.4 - AQUATIC AND TERRESTRIAL INVERTEBRATE SURVEY LOCATIONS 2016Supporting Document · PDF11 Apr 2019View
FIGURE 6.3 - BOTANICAL CONSTRAINTSSupporting Document · PDF11 Apr 2019View
FIGURE 6.2 - PHASE 1 HABITAT SURVEY 2018Supporting Document · PDF11 Apr 2019View
FIGURE 6.1 - DESK STUDY DESIGNATED SITES 2018Supporting Document · PDF11 Apr 2019View
FIGURE 5.8 - REPRESENTATIVE VIEWPOINT LOCATIONSSupporting Document · PDF11 Apr 2019View
FIGURE 5.7 - POTENTIAL VIEWPOINT LOCATIONSSupporting Document · PDF11 Apr 2019View
FIGURE 5.6 - COMBINED DEVELOPMENT ZONE OF THEORETICAL VISIBILITY (ZTV)Supporting Document · PDF11 Apr 2019View
FIGURE 5.5 - LANDSCAPE CONTEXTSupporting Document · PDF11 Apr 2019View
FIGURE 5.4 - LOCAL LANDSCAPE CHARACTERSupporting Document · PDF11 Apr 2019View
FIGURE 5.3 - REGIONAL LANDSCAPE CHARACTERSupporting Document · PDF11 Apr 2019View
FIGURE 5.2 - NATIONAL LANDSCAPE CHARACTERSupporting Document · PDF11 Apr 2019View
FIGURE 5.1 - PLANNING POLICIESSupporting Document · PDF11 Apr 2019View
FIGURE 15.1 - CUMULATIVE DEVELOPMENTSSupporting Document · PDF11 Apr 2019View
FIGURE 13.3 - AIR QUALITY STUDY AREASSupporting Document · PDF11 Apr 2019View
FIGURE 13.2 - CITY OF LINCOLN COUNCILSupporting Document · PDF11 Apr 2019View
FIGURE 13.1 - SENSITIVE AIR QUALITY RECEPTORSSupporting Document · PDF11 Apr 2019View
FIGURE 12.9 - DO-SOMETHING 2043 (PHASE 4 DEVELOPMENT CONSTRUCTED) GRID NOISE MAPSupporting Document · PDF11 Apr 2019View
FIGURE 12.8 - DO-SOMETHING 2043 (PHASE 4 DEVELOPMENT CONSTRUCTED) GRID NOISE MAPSupporting Document · PDF11 Apr 2019View
FIGURE 12.7 - DO-SOMETHING 2038 (PHASE 2 DEVELOPMENT CONSTRUCTED) GRID NOISE MAPSupporting Document · PDF11 Apr 2019View
FIGURE 12.6 - DO-SOMETHING 2038 (PHASE 2 DEVELOPMENT CONSTRUCTED) GRID NOISE MAPSupporting Document · PDF11 Apr 2019View
FIGURE 12.5 - DO-SOMETHING 2026 (PHASE 1 DEVELOPMENT CONSTRUCTED) GRID NOISE MAPSupporting Document · PDF11 Apr 2019View
FIGURE 12.4 - DO-SOMETHING 2026 (PHASE 1 DEVELOPMENT CONSTRUCTED) GRID NOISE MAPSupporting Document · PDF11 Apr 2019View
FIGURE 12.3 - BASELINE YEAR 2016 (NO DEVELOPMENT CONSTRUCTED) GRID NOISE MAP NIGSupporting Document · PDF11 Apr 2019View
FIGURE 12.2 - EXISTING YEAR 2016 (NO DEVELOPMENT CONSTRUCTED) GRID NOISE MAP DAYSupporting Document · PDF11 Apr 2019View
FIGURE 12.10 - DO-SOMETHING 2026 (PHASE 1 DEVELOPMENT CONSTRUCTED) GRID NOISE MASupporting Document · PDF11 Apr 2019View
FIGURE 12.1 - SENSITIVE RECEPTORS AND MONITORING LOCATIONSSupporting Document · PDF11 Apr 2019View
FIGURE 10.1 WATER BODIES AND THEIR ATTRIBUTESSupporting Document · PDF11 Apr 2019View
FIGURE 1.2 - ENVIRONMENTAL CONSTRAINTSSupporting Document · PDF11 Apr 2019View
FIGURE 1.1 - ENVIRONMENTAL CONSTRAINTSSupporting Document · PDF11 Apr 2019View
TECHNICAL APPENDICES COVER PAGESSupporting Document · PDF11 Apr 2019View
APPENDIX 7D OVERARCHING ARCHAEOLOGICAL STRATEGY REPORTSupporting Document · PDF11 Apr 2019View
APPENDIX 7C TRIAL TRENCH REPORTSupporting Document · PDF11 Apr 2019View
APPENDIX 7B GEOPHYSICAL SURVEYSupporting Document · PDF11 Apr 2019View
APPENDIX 7A BASELINE REPORTSupporting Document · PDF11 Apr 2019View
APPENDIX 8B WGC RECLAMATION STRATEGYSupporting Document · PDF11 Apr 2019View
APPENDIX 8A REMEDIATION STRATEGY SKEWBRIDGE AND SWANPOOLSupporting Document · PDF11 Apr 2019View
APPENDIX 6G BREEDING BIRD ASSESSMENT - SUPPLEMENTARY INFOSupporting Document · PDF11 Apr 2019View
APPENDIX 6F GCN SUPPLEMENTSupporting Document · PDF11 Apr 2019View
APPENDIX 6E SUMMARY OF ECOLOGICAL STUFY AREASSupporting Document · PDF11 Apr 2019View
APPENDIX 6C SUMMARY OF SURVEYS AND METHODOLOGYSupporting Document · PDF11 Apr 2019View
APPENDIX 6B - PART MSupporting Document · PDF11 Apr 2019View
APPENDIX 6B - PART LSupporting Document · PDF11 Apr 2019View
APPENDIX 6B - PART KSupporting Document · PDF11 Apr 2019View
APPENDIX 6B - PART JSupporting Document · PDF11 Apr 2019View
APPENDIX 6B - PART ISupporting Document · PDF11 Apr 2019View
APPENDIX 6B - PART HSupporting Document · PDF11 Apr 2019View
APPENDIX 6B - PART GSupporting Document · PDF11 Apr 2019View
APPENDIX 6B - PART FSupporting Document · PDF11 Apr 2019View
APPENDIX 6B - PART ESupporting Document · PDF11 Apr 2019View
APPENDIX 6B - PART DSupporting Document · PDF11 Apr 2019View
APPENDIX 6B - PART CSupporting Document · PDF11 Apr 2019View
APPENDIX 6B - PART BSupporting Document · PDF11 Apr 2019View
APPENDIX 6B - PART ASupporting Document · PDF11 Apr 2019View
APPENDIX 6A KEY LEGISLATION AND POLICIESSupporting Document · PDF11 Apr 2019View
APPENDIX 5B VIEWPOINT LOCATIONSSupporting Document · PDF11 Apr 2019View
APPENDIX 5A LVIA METHODOLOGYSupporting Document · PDF11 Apr 2019View
APPENDIX 3B SCREENING AND SCOPING OPINIONSupporting Document · PDF11 Apr 2019View
APPENDIX 3A EIA SCOPING DOCUMENTSupporting Document · PDF11 Apr 2019View
APPENDIX 15A CUMULATIVE DEVELOPMENT - LONG LIST OF OTHER DEVELOPMENTSSupporting Document · PDF11 Apr 2019View
APPENDIX 13B - TRAFFIC DATASupporting Document · PDF11 Apr 2019View
APPENDIX 13A - TRAFFIC DATASupporting Document · PDF11 Apr 2019View
APPENDIX 12B ACOUSTIC MODELLING DETAILSSupporting Document · PDF11 Apr 2019View
APPENDIX 12A NOISE PERCEPTION AND TERMINOLOGYSupporting Document · PDF11 Apr 2019View
APPENDIX 11B TRAVEL PLAN MARCH 2019Supporting Document · PDF11 Apr 2019View
APPENDIX 10E CONSTRUCTION GUIDANCE FOR SURFACE WATER AND GROUNDWATER PROTECTIONSupporting Document · PDF11 Apr 2019View
APPENDIX 10D - HAWRAT METHODS A+D DATA AND RESULTSSupporting Document · PDF11 Apr 2019View
APPENDIX 10C ENVIRONMENT AGENCY SCOPING RESPONSESupporting Document · PDF11 Apr 2019View
APPENDIX 10B PRELIMINARY WATER FRAMEWORK DIRECTIVE ASSESSMENT DECEMBER 2018Supporting Document · PDF11 Apr 2019View
APPENDIX 10A-1 DETAILED FLOOD RISK ASSESSMENT AND WATER MANAGEMENT STRATEGY - MASupporting Document · PDF11 Apr 2019View
OPPORTUNITIES AND CONSTRAINTS PLANPlan · PDF11 Apr 2019View
MODAL SHIFT PLANPlan · PDF11 Apr 2019View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF8 Apr 2019View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Granted Conditionally
FINAL DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.