Council planning record

Restore main pitched roof and dormers by installing new lead front gutter, lead watergates, and lead flashings, and re-slating front and rear slopes & dormers with scotch slate.

35 Upper Gray Street Edinburgh EH9 1SN

Permission Is Not RequiredReference: 26/01470/LBCCity of Edinburgh

Last published check: 21 Sept 2026, 05:07. Check the council record for more recent changes.

Application location

35 Upper Gray Street Edinburgh EH9 1SN

This record has no verified map location.

View council map

Application summary

Status
Permission Is Not Required
Application type
Listed Building Consent
Received
7 Apr 2026
Validated
27 Apr 2026
Determination deadline
26 Jun 2026
Local authority
City of Edinburgh

Application overview

Restore main pitched roof and dormers by installing new lead front gutter, lead watergates, and lead flashings, and re-slating front and rear slopes & dormers with scotch slate.

Proposal details

Reference
26/01470/LBC
Ward
Southside/Newington

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
PNLBCZ- LBC NOT REQUIRED DECISIONDecision Notice · PDF23 Jun 2026View
REPORT OF HANDLINGReport of Handling · PDF23 Jun 2026View
HES CONSConsultation · PDF14 May 2026View
(04) PROPOSED FRONT ELEVATION WITH CAPTIONS DESCRIBING WORKDrawing27 Apr 2026View
DETAILS OF THE LEAD WORK PLANNEDBackGround Papers · PDF24 Apr 2026View
(05) PROPOSED PHOTO WITH CAPTIONS DESCRIBING PLANNED REPAIR WORKDrawing24 Apr 2026View
DESCRIPTION OF WORKSBackGround Papers · PDF7 Apr 2026View
(02) FRONT ELEVATION PHOTODrawing7 Apr 2026View
(01) LOCATION PLANDrawing · PDF7 Apr 2026View
(03) REAR ELEVATION PHOTODrawing7 Apr 2026View
APPLICATION PDFApplication Form · PDF7 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Date For Comments

    Published milestoneCouncil source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permission is not required
PNLBCZ- LBC NOT REQUIRED DECISION
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.