T1 Ash - Prune back east facing branches to draw away from canopy from 13m to 10m.T2 Ash - Remove.T3 Rowan - Reduce radial spread from 6m to 4.5m, 1m crown lift.T4 Sycamore - Height reduction from 16m to 14m.T5 Sycamore - Remove. T6 Elm - Height reduction from 10m to 8m.T7 Oak - Height reduction from 10m to 8m.T8 Horse Chestnut - Height reduction from 7m to 6m.T9 Ash - Remove.T10 Ash - Remove deadwood and reduce height from 18m to 15m.T11 Horse Chestnut - Radially reduce spread from 8m to 6m.T12 Lime - Radially reduce spread from 12m to 10m.T13 Sycamore - Radially reduce spread from 12m to 10m.T14 - No work. T15 Elm - 30% crown thinning.T16 Sycamore - Crown lift to clear wire by 1m.T17 Sycamore - Remove 2 bottom south-west facing limbs.T18 Horse Chestnut - Crown lift by 0.5m, crown thin by 20%.
T1 Ash - Prune back east facing branches to draw away from canopy from 13m to 10m.T2 Ash - Remove.T3 Rowan - Reduce radial spread from 6m to 4.5m, 1m crown lift.T4 Sycamore - Height reduction from 16m to 14m.T5 Sycamore - Remove. T6 Elm - Height reduction from 10m to 8m.T7 Oak - Height reduction from 10m to 8m.T8 Horse Chestnut - Height reduction from 7m to 6m.T9 Ash - Remove.T10 Ash - Remove deadwood and reduce height from 18m to 15m.T11 Horse Chestnut - Radially reduce spread from 8m to 6m.T12 Lime - Radially reduce spread from 12m to 10m.T13 Sycamore - Radially reduce spread from 12m to 10m.T14 - No work. T15 Elm - 30% crown thinning.T16 Sycamore - Crown lift to clear wire by 1m.T17 Sycamore - Remove 2 bottom south-west facing limbs.T18 Horse Chestnut - Crown lift by 0.5m, crown thin by 20%.
Reference
26/02452/TPO
Alternative references
PP-14721256
Ward
Great Horton (Ward 11)
Parish
Not In A Parish
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.