Council planning record

Application to discharge conditions 20 (Construction Management Plan phases 1-3), 22 (surface water sustainable drainage strategy phases 2 and 3), 23 (Construction Surface Water Management Plan phases 1-3) and 33 (Historic Building Recording and Analysis written scheme of investigation) attached to planning permission 21/01028/OUTMAJ (Hybrid planning application seeking: Outline planning permission (with all matters reserved except for means of access, parking and landscaping) for a new prison (up to 74,531.71 sqm GEA) (Class C2A) within a secure perimeter fence following demolition of existing buildings and structures and together with associated engineering works; Outline planning permission for a replacement boiler house (with all matters reserved except for access); and Full planning permission for a replacement bowling green and club house (Class F2(c)) on land adjacent to HMP Garth and HMP Wymott, Leyland)

Hm Prison Wymott Moss Lane Ulnes Walton Leyland PR26 8LW

GrantedReference: 26/00113/DISChorley Borough Council

Last published check: 12 Oct 2026, 11:33. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source

Application summary

Status
Granted
Application type
Discharge of Condition(s)
Received
5 Feb 2026
Validated
5 Feb 2026
Determination deadline
2 Apr 2026
Local authority
Chorley Borough Council

Application overview

Application to discharge conditions 20 (Construction Management Plan phases 1-3), 22 (surface water sustainable drainage strategy phases 2 and 3), 23 (Construction Surface Water Management Plan phases 1-3) and 33 (Historic Building Recording and Analysis written scheme of investigation) attached to planning permission 21/01028/OUTMAJ (Hybrid planning application seeking: Outline planning permission (with all matters reserved except for means of access, parking and landscaping) for a new prison (up to 74,531.71 sqm GEA) (Class C2A) within a secure perimeter fence following demolition of existing buildings and structures and together with associated engineering works; Outline planning permission for a replacement boiler house (with all matters reserved except for access); and Full planning permission for a replacement bowling green and club house (Class F2(c)) on land adjacent to HMP Garth and HMP Wymott, Leyland)

Proposal details

Reference
26/00113/DIS
Alternative references
PP-14679838
Ward
Croston, Mawdesley And Euxton South
Parish
Ulnes Walton
Agent
Cushman & Wakefield

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Hm Prison Wymott Moss Lane Ulnes Walton Leyland PR26 8LW

This record has no verified map location.

View council map

Documents 25 of 25

DocumentPublishedAction
DECISION - DISCHARGE OF CONDITIONDecision · PDF1 Sept 2026View
LLFA RESPONSE.Consultee Response · PDF27 Aug 2026View
26-00113-DIS - LLFA RESPONSE.PDFConsultee Response · PDF11 Aug 2026View
J21-871-017BN-REV0 COMMENTS IN RESPONSE TO LLFA REVIEWPlanning Application (inc initial correspondence) · PDF11 Aug 2026View
G&W - DRAINAGE TECHNICAL ADDENDUM P01Planning Application (inc initial correspondence) · PDF22 Jul 2026View
GENERAL LETTERCorrespondence · PDF22 Jun 2026View
26-00113-DIS - LLFA RESPONSE.Consultee Response · PDF8 May 2026View
CONSULTATION LETTERCorrespondence · PDF17 Apr 2026View
HIGHWAYS RESPONSEConsultee Response · PDF5 Mar 2026View
D9.26.00113.DIS HDC HOLDING RESPONSE.PDFConsultee Comment · PDF4 Mar 2026View
LLFA RESPONSEConsultee Response · PDF4 Mar 2026View
HISTORIC ENVIRONMENT TEAMConsultee Comment · PDF3 Mar 2026View
ACKNOWLEDGEMENT LETTERCorrespondence · PDF12 Feb 2026View
CONSULTATION LETTERCorrespondence · PDF12 Feb 2026View
CONSULTATION LETTERCorrespondence · PDF12 Feb 2026View
CONSULTATION LETTERCorrespondence · PDF12 Feb 2026View
GENERIC QUANTITATIVE RISK ASSESSMENT_P02Planning Application (inc initial correspondence) · PDF9 Feb 2026View
HISTORIC BUILDING RECORDING AND ANALYSISPlanning Application (inc initial correspondence) · PDF9 Feb 2026View
APPLICATIONFORMREDACTEDPlanning Application (inc initial correspondence) · PDF5 Feb 2026View
2026 PHOTO SCHEDULEPlanning File · PDF5 Feb 2026View
SURFACE WATER DURING CONSTRUCTION MANAGEMENT PLAN REV01Planning File · PDF5 Feb 2026View
PROPOSED CONTOURS - SHEET 01_P06Planning Application (inc initial correspondence) · PDF5 Feb 2026View
SURFACE WATER FLOW EXCEEDANCE PATH_P05Planning Application (inc initial correspondence) · PDF5 Feb 2026View
CONSTRUCTION MANAGEMENT PLAN REV05Planning File · PDF5 Feb 2026View
GW2 COVERING LETTER C 20 22 23 AND 33Planning Application (inc initial correspondence) · PDF5 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Condition(s) discharged
DECISION - DISCHARGE OF CONDITION

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.