Council planning record

Installation of two rapid electric vehicle charging stations and ancillary equipment within the car park, including one fully accessible electric vehicle charging bay.

Co-op Late Shop 195 Spendmore Lane Coppull Chorley PR7 5BY

GrantedReference: 25/00305/FULChorley Borough Council

Last published check: 22 Sept 2026, 03:31. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Granted
Application type
Full Planning
Received
27 Mar 2025
Validated
27 Mar 2025
Determination deadline
22 May 2025
Local authority
Chorley Borough Council

Application overview

Installation of two rapid electric vehicle charging stations and ancillary equipment within the car park, including one fully accessible electric vehicle charging bay.

Proposal details

Reference
25/00305/FUL
Alternative references
PP-13893541
Ward
Coppull
Parish
Coppull

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Co-op Late Shop 195 Spendmore Lane Coppull Chorley PR7 5BY

This record has no verified map location.

View council map

Documents 23 of 23

DocumentPublishedAction
DECISION - FULL PLANNING PERMISSIONDecision · PDF20 May 2025View
LIGHT WITH LIGHTSHIELDAmended Plans · PDF15 May 2025View
LIGHTING COLUMN DATASHEETReport · PDF15 May 2025View
HIGHWAY COMMENTS 29.04.2025Consultee Response · PDF29 Apr 2025View
ACKNOWLEDGEMENT LETTERCorrespondence · PDF1 Apr 2025View
CONSULTATION LETTERCorrespondence · PDF1 Apr 2025View
CONSULTATION LETTERCorrespondence · PDF1 Apr 2025View
CONSULTATION LETTERCorrespondence · PDF1 Apr 2025View
NEIGHBOUR LETTER - INITIAL CONSULTATIONCorrespondence · PDF1 Apr 2025View
SITE NOTICE - PLANNING APPLICATIONSCorrespondence · PDF1 Apr 2025View
APPLICATIONFORMREDACTEDPlanning Application (inc initial correspondence) · PDF27 Mar 2025View
001_58 EQUIPMENT ELEVATIONS - BYD 160KW SINGLE ARM CHARGER_REVASite Elevations, Building Plans etc. · PDF27 Mar 2025View
001_59 EQUIPMENT ELEVATIONS - CCTV - INCLUDING CABLING DETAILS (UNDERGROUND)Site Elevations, Building Plans etc. · PDF27 Mar 2025View
10420 - 0086_01-PL PLANNING SITE LAYOUT_REVASite Elevations, Building Plans etc. · PDF27 Mar 2025View
BLOCK PLAN OF THE SITE_INCLUDED_IN_ADDITIONAL PLANSSite Location Plan · PDF27 Mar 2025View
10420 - 0086_02 LOCATION AND BLOCK PLAN_REVASite Location Plan · PDF27 Mar 2025View
THE LOCATION PLAN_INCLUDED_IN_BLOCK PLAN OF THE SITESite Location Plan · PDF27 Mar 2025View
(DUAL ARM) EVD160KUC01_V04Site Elevations, Building Plans etc. · PDF27 Mar 2025View
(SINGLE ARM) EVD160KUC05 20240911Site Elevations, Building Plans etc. · PDF27 Mar 2025View
001_27 EQUIPMENT ELEVATIONS - FEEDER PILLAR RMC2100 WITH SPACER_REVBSite Elevations, Building Plans etc. · PDF27 Mar 2025View
001_29 EQUIPMENT ELEVATIONS - BYD 160KW CHARGER_REVCSite Elevations, Building Plans etc. · PDF27 Mar 2025View
INSTAVOLT 2024 NPPF AND MATERIAL CONSIDERATIONS SUPPORTING STATEMENTSite Elevations, Building Plans etc. · PDF27 Mar 2025View
INSTAVOLT DE MINIMIS SITES BNG STATEMENTSite Elevations, Building Plans etc. · PDF27 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit Full Planning Permission
DECISION - FULL PLANNING PERMISSION
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.