Minor non material amendment to reserved matters consent ref: 19/00904/REMMAJ (Reserved matters application for the erection of 122 dwellings (appearance, landscaping, layout, and scale) pursuant to outline planning permission 15/00224/OUTMAJ) involving:1. Change of materials 2. Introduction of solar panels to Plots 50 to 54, & 58 to 783. Block reconfiguration to Plots 66 and 67, and Plots 68 to 70, swapping Plots 67 & 694. Repositioning of the fence line to the front of Plot 015. Repositioning of the fence line to the side of Plot 57 & 58.6. Amendment to the fence type to plots 114 and 115 in line with the Hepworth Acoustic Report7. Introduction of fence and gate to the area to the rear of plots 100 to 112
The Strawberry Fields Digital Hub Euxton Lane Chorley PR7 1PS
Minor non material amendment to reserved matters consent ref: 19/00904/REMMAJ (Reserved matters application for the erection of 122 dwellings (appearance, landscaping, layout, and scale) pursuant to outline planning permission 15/00224/OUTMAJ) involving:1. Change of materials 2. Introduction of solar panels to Plots 50 to 54, & 58 to 783. Block reconfiguration to Plots 66 and 67, and Plots 68 to 70, swapping Plots 67 & 694. Repositioning of the fence line to the front of Plot 015. Repositioning of the fence line to the side of Plot 57 & 58.6. Amendment to the fence type to plots 114 and 115 in line with the Hepworth Acoustic Report7. Introduction of fence and gate to the area to the rear of plots 100 to 112
Reference
22/00762/MNMA
Alternative references
PP-11364318
Ward
Chorley North And Astley
Parish
Chorley
Agent
Seddon Construction
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.